国产精品人人爱一区二区白浆_国产我不卡午夜伦理_免费电影亚洲一级黄片_国产午夜福利久久_51视频在线观看免费国产_天堂AV网手机版_国产精品毛片一区二_印度女人性液_日韩大片91免费观看视频播放_日本欧美国产精品第一页久久

手機(jī)版
1 2 3 4
首頁 > 新聞中心 > 行業(yè)新聞 >
行業(yè)新聞

上海翻譯公司完成工程類英文翻譯

發(fā)布時(shí)間:2018-03-16 08:52  點(diǎn)擊:

上海翻譯公司完成工程類英文翻譯
SPECIFICATION FOR SITE OFFICE AND SIGN BOARD GENERAL  PRICING PREAMBLE
BILL OF QUANTITIES
 
SITE WORK AND PRELIMINARIES ROADWORKS
ELECTRICAL WORKS TELECOM DUCTING WORKS SECURITY DUCTING WORKS WATERWORKS
STORM WATER WORKS SEWERAGE WORKS IRRIGATION WORKS LANDSCAPING WORKS
 
SECTION 5
 
SECTION 6
 
SUMMARY OF THE BILL OF QUANTITES (S) DAY WORK SCHEDULE (DW)
 
(a) Manpower
 
(b) Material
 
(c) Equipment
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
Abu Dhabi Police GHQ- Police Projects Committee intends to construct the main infrastructure of the new  Training  Village  at  Al  Hafar.  The pro 丿 ect site is  approximately  1.0  km  by  2.0 km located
approximately 6 km north of Abu Dhabi - Al Ain highway, refer to site location map & Key plan drawings contained in Vol.4 of the tender documents. The project consists of the following zones:
. ZONE A -  Main Administration
. ZONE B - Maintenance and Services
. ZONE C - lndoo 「 Ranges
. ZONE D -  Public Order
. ZONE E - Arms and Explosives
. ZONE F -  Urban Zone
. ZONE G -  Prison Zone
. ZONE I - Anti Narcotics
. ZONE J - Crime Scene ZONE K - Dog Training ZONE L -  F7 Zone
. ZONE M -  Driver Training
. ZONE 0-AirWing Zone
The scope of work includes supply, install, construct, test and commission of the main infrastructure which includes the following disciplines:
 
 
The earthwork for the entire project was part of a separate contract, however Contractor is required to undertake the earthwork related to the installation of the specific infrastructure as per the Tender Documents and the authorities general and standa「ds and guidelines.
 
The scope of work is detailed further in the following sections.
 
Contractor shall read this document in conjunction with the full set of the Tender Documents which includes Tender Drawings and shall comply in all respect to the requirements of the relevant service departments/authorities for these wo「ks.
 
The existing services, if shown, on the drawings are for information purposes only and do not necessarily show exact locations, depths, spacing, smaller branches of utilities and services which are not normally indicated on such drawings, nor the possible existence of other underground utilities and services.
 
The Contractor shall be responsible for investigating the soil / ground conditions and shall make all the necessary soil investigation and subsurface investigation as he may require to fully familiarize himself  with the  properties  of  the  soil and  shall be deemed  to  have included  in  his  tender all
materials, plant services, labour and provisions as may be required for all earthwork to complete the Works.
 
The Contractor shall provide all necessary protection for the existing services as may be requ「i ed by his works operations and to the satisfaction of the owning authorities and the Engineer
 
The Contractor shall carry out all the necessary tests to establish the suitability of the borrow materials, the placed borrow material and the ground exposed as a result of the cut operation shall be evenly compacted in accordance with the relevant terms of the specifications and as directed by the engineers
 
Infrastructure Disciplines:
 
1. Road Works
 
Abu Dhabi Police Training Village (ADPTV) will be constructed on pre-graded area of approximately 1.00km x 2.00km. Grading of village is part of separate contract. Road works include tying into existing road, earthwork, signs and marking, roadside furniture, footpath/sidewalk and other related
construction. Construction shall be according to the drawings & specification included with this tender.
 
Roadway construction shall consist of asphaltic wearing course, asphalt binder course, asphalt concrete base course, aggregate base and granular sub-base. Signage to be provided shall include warning, regulatory signs appropriate to traffic construction: in addition to temporary sign required during construction period. Roadway construction is under this tender is only limited to the entrance of each zone/plot, any details inside the plots even if shown on the drawing shall be considered fo 「information only.
 
Summary of scope of road works includes but not limited to the following
 
13.00 km of single carriageway
 
1.20 km of dual carriageway with
 
1.60 km of access road to utilities building
 
2 no. new access from exiting/upgraded road to ADPTV.
 
2.00m wide footpath/walkway along the road.
 
30 no.s raised pedestrian crossings
 
48 no.s of speed control hump
 
Road signs and marking
 
FOR TENDER ONLV
'""'°"' I  旦 CT
TE巳ODIN M.E . Ltd.
 
 
 
2. Telecom and Electrical Works
 
2.1 11kV Network
 
Supply, install, test and commission the 3CX300 sq.mm Cu/XLPE 11KV cable as per ADDC specifications, from 33/11kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply, install, test and commission the 3CX120 sq.mm Cu/XLPE 11kV cable as per ADDC 的 m Ring main unit up to the transformer as per the d「awings.
 
Supply, install , test and commission 32 core Fibre optic cable from 33/11 kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply and install the Fiber optic cable chambers as per the drawings and as per ADDC standards.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
All the substation equipments, as per pro 」ect requirement shall be supplied and installed by the contractor as per ADDC requirement.
 
Supply, install, test and commission distribution transformers, RMUs, earthing of the equipments, and all necessary fitments including connections to the EFls as per ADDC specification and drawings.
 
All the protection requirements including but not limited to protection setting calculations shall be provided by the contractor as per ADDC specifications.
 
 
 
2.2 Street Lighting System
 
Supply, install, test and comm1ss1on the 3CX10 sq.mm Cu/XLPE cable as per ADM specifications from street lighting control cabinet to street lighting poles as per the drawings.
 
Supply, install, test and commission the street lighting system including street lighting control cabinets, street lighting poles and light fixtures with all the necessary fitments as per ADM specifications, as pe 「 the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADM, client and other authorities.
 
Street lighting system should be fed from the substationTRM04/M. All the LV cables required to be laid between the substation LV panel and the service cabinets should be supplied and installed by the contractor.
 
All the substation equipments shall be supplied and installed by the contractor as per ADDC requirement and as per project requirements.
 
 
 
2.3 Telecom
 
Supply and install the 4-way telecom ducts as per the drawings
 
Supply and install the JRC-12 and JRC-14 manholes as per the drawings
 
Contractor shall supply and install all the cables of telecom system.
 
Preparation of shop drawings and as-built drawings as per the requirements of Etisalat and client.
 
 
 
2.4 Structured Cabling System
 
Supply and install the 9-way security ducts, JRC-12 and JRC-14 manholes and all the cables of structured cabling system as pe「 the drawings and specifications.
 
Construct the Police Main IT building as per the details indicated in the specification and drawings as per project requirement including but not limited to raised floor, cable trays, etc. as
pe「 GHQ specifications as per project requirements.
 
Contractor shall supply, install, test and commission Tetra tower system with all the associated works including the power as per the drawings, specification and project requirement.
 
Preparation of shop drawings and as-built drawings as per the client's requirements.
 
2.5 LV Network
 
Supply, install, test and commission LV service cabinets including earthing and necessary fitments as per ADDC specifications and drawings. The arrangement to feed the  service cabinets from the LV panel in TRM-04 M is also included in the SCOPE. This shall also include supply install test and commission the LV cables as per the ADDC specifications and RSB guide lines. All the necessary calculation to justify the cable size shall be provided by the contractor
 
Supply, install, test and commission 4CX95 sq.mm Cu/XLPE cables as per ADDC/ADM specifications to feed the street lights control cabinets from the service cabinets as per the drawings and as per the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
3. Water Works
 
The scope of for water works shall include but not limited to the following:
 
Supply, installation and construction of new 0D250 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents including all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works as per the details indicated in the specification and drawings
 
Supply, installation and construction of new 0D180 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 0D160 HOPE Pipeline of within the approved pipeline route as pe 「 the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 00110 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply  and installation  of  all  necessary  fittings,  gate  valves,  contro.l  valves ,  Electromagneitc flow meters and 閑 ated accessories as per the details indicated in the Tender Documents.
 
Supply and construction of Road Crossing ducts (concrete encased GRP ducts) as per the details indicated in the Tender Documents.
 
All necessary connections/disconnections to be made between the new/relocated waterlines and the existing system as per the details indicated in the Tender Documents
 
Construction  of  Civil  works  including  valve  chambers,  bulk  consume「  chambers, fire hydrant boxes, protection slabs, water ducts at road crossings, sign posts and marker posts all as pe 「the details indicated in the Tender Documents.
 
Supply and construction of reinforced concrete slabs for waterline under roads and parking areas as per the details indicated in the Tender Documents and/o「 directed by the ENGINEER.
 
Carryout all required safety measures and temporary facilities for pedestrian and vehicles according to HSE requirements and procedures to ensure public safety during the execution of the project.
 
Removal, shifting or transplantation of the trees/plants in conflict with waterline route to the locations as approved by the concerned authorities
 
 
 
Removal and reinstatement of tiles, green and asphalt area, etc.
 
Successfully conducting the preliminary and final hydraulic pressure testing, disinfecting and flushing of the completed waterlines prior to commissioning and connection/disconnection to the existing water network system.
 
With respect to construction, testing, sterilising and commissioning etc. the following shall be taken into consideration:
 
o All construction work shall be conducted with the minimum possible disturbance of the water supply serving consumers who are already connected to the existing system.
 
o The CONTRACTOR shall liaise fully with the ENGINEER and ADDC in order to temporarily shut down existing live pipelines  if necessa ry, in order to carry out the WORKS.
 
All other associated works necessary to successfully  complete all above works
 
 
 
4. Storm Water
 
The objective of the storm wate 「 system of Abu Dhabi Police Training Village is to provide cost efficient means of collecting and disposing storm water run-off to a suitable location (Pond / Lagoon) to prevent flooding as a result of rainfall event as shown in the Tender Documents and bill of quantities.
 
There is existing storm water system (collection & disposal) within and adjacent to the project area and a proposed storm water system to be provided in the future. Howeve 「 Contractor is responsible to examine the area and obtain any information from the authorities on potential existing utilities
befo「e excavation.
 
4.1 Storm water system - Pipes & Manholes
 
The storm water system mainly is divided to two pipelines connected to each others:
 
Collection Lines:
 
Normally have pipe dia. of 300mm with average slope of 0.5%. The collection lines shall have rectangular chambers to be installed as inlets. Majorly, two types of inlets are available in network; Inlet chamber & Catch-basins. Both chambers shall have it own arrangement  in supply, excavation & installation. The required chambers a「 e proposed to be installed in two different locations, on curb edge as kerb inlet and the other within road way as flush inlet
 
Main Lines: Varies as followinq:
 
1. 300, 400 & 500mm diameters-uPVC at average depths of 1.0 - 4.0m with average slope of 0.25%, 0.17% & 0.15%, respectively. The manholes proposed along these pipes are storm water circular manholes (Type-4) with internal dia. of 1.1m. the average distances between manholes aren't exceeding 1OOm , maximum.
 
2. 600, 700 & 800mm diameters-GRP at average depths of 1.0 - 3.0m with average slope of 0.14%. The manholes proposed along these pipes a「 e storm water rectangular manholes with circular  shafts (Type-5)  with internal dia. of 1.1m and intermediate slap as per ADM
standa「ds. The average distances between manholes aren't exceeding 120m, maximum.
 
4.2 Retention / Infiltration Pond:
 
The proposed SW pond is located at North/East corner of PTV area. The pon.d shall work as retention / infiltration pond for the expected amount of flow conveyed through SW pipelines. The out fall pipe discha 「 ging to the pond shall has non-return valve (Flap valve) at its open end. uPVC perforated  pipes  are proposed  surrounding  the  pond  circumference in  order  to  filtrate  SW into
su「r ounding natural ground.
 
5. Sewerage Works
 
The sewerage network of ADPTV is designed to deal with the estimated peak flow  from all zones and to collect the sewage into the temporary proposed holding tank. The collected sewage shall be transferred by tankers to the nearest existing STP in coordinatoi n and approval of the ADSSC.
 
Sewage generated from each zone wilt be collected via manholes insfalled at each zone boundary, then discharging the collected sewage by a system of gravity sewers and manholes into the holding tank. Due to the excessive depth of the inlet pipe of the holding tank, a lifting station is proposed to lift the sewage and discha「ge into the holding tank.
 
The sewerage network contains the following components:
 
5.1 Sewerage Pipelines and Manholes
 
The material of sewerage pipelines is uPVC with diameter varies from  160mm  to 300mm. One typical manhole with internal diamete「 of 1.50m is used.
 
The contractor shall provide / include in his construction works the main supply pipe up to the boundary limit (fence) of the current development providing end cap for future connection
 
5.2 Pump Stations
 
One pumping station is required. The pumping station has 1 duty and 1 standby sub mersible pump installed within a wet well receiving sewerage from a gravity collection network and discharging the flow into the discharge chamber then throughgravity sewers to the holding tank.
 
The type of the station will be type 1 as the flow is less than 100 I/sec.
 
The pumps are selected to delive 「 the required flow at calculated total head. Pumps are of submersible type with non-clogging mixed-flow impellers. Pumps and motor drives are selected to satisfy the final design flow. The internal diameter of the wet well will be 3.2 m as shown in tender drawings.
 
5.3 Holding tank
 
A temporary holding tank is to be constructed in the north side of ADPTV. The holding tank is divided into two compartments.  It will be furnished with inlet pipe receiving flow from the discharge chamber In addition, outlet pipe will be provided and furnished with end cap/plug to allow for future connection once the planned sewerage treatment plant is completed and operated
 
6. Irrigation Works
 
lrriHation Network
 
The scope of works comprises the installation and testing of the irrigation network of the training village as detailed in the Tender Documents. Contractor shall install all the necessary irrigation appurtenances complete in all respect as per drawing details and specificationas follows:
 
1. DN250mm dia. Pipe Class-D (1O")
 
2. DN200mm dia. Pipe Class-D (8")
 
3. DN100mm dia. Pipe Class-D C4")
 
4. DN75mm dia. Pipe Class-D (3")
 
5. DN50mm d舊.Pipe Class-D (2")
 
6. DN38mm dia. Pipe Class-D (1-1/2")
 
7. DN25mm dia. Pipe Class-E (1")
 
8. DN250mm gate valve (1O")
 
9. DN200mm gate valves (8")
 
10. DN100mm gate valves (4")
 
11. DN100mm Zone demand points (4")
 
12. 2" Air-Vacuum valves
 
13. 4" Wash-out valves
 
14. Irrigation decoder cables (AWG #14)
 
15. 4 Station stand alone type controller at the main entrance roundabout
 
16. 1" solenoid valves along the main entrance road
 
17. Drippers and dripline tubing along the main entrance road lrriqation Tank and Pump Room:
The  irrigation  tank  and  pump  room  shall  be  for  future  installation,  howeve「, the  contractor  shall provide/ include in his construction works the main supply pipe (DN250mm) up to the boundary lim 仆(fence) of  the current development  and provide pvc end cap  fo 「 future connection
 
Additional Contractor's scope of work is installation/ construction of the following:
 
 
 
Page 10 of 13
 
 
 
1. DN75mm (3") pvc solenoid valve risers with end cap
 
2. DN25mm (1") pvc quick coupling valves risers/connection with end cap
 
3. Termination of decoder cables at the proposed location of decoder cont「olle「s and the proposed location of solenoid valve risers.
 
4. Provision, installation, testing and commissioning of standard 4 station cont 「 olle 「 at the main entrance road
 
5. p 「 ovision, installation, testing and commissioning of 1" solenoid valves at the main entrance road
 
6. Provision, installation, testing and commissioning of irrigation cables at the main entrance road
 
7. Provision, installation, testing and commissioning of drippers and dripline tubing at the main entrance road
 
The main irrigation network is for futu「e utilization in anticipation when treated sewage effluent (TSE) irrigation water shall become available at the fac小ty. The Contracto「 therefore, shall take every steps and consideration to install the main irrigation network in its fullness, whereby future excavation shall be avoided, except for the installation of the solenoid valves, the two (2) decoder controllers, quick coupling valves, the secondary and tertiary irrigation lines downstream of the solenoid valves.
 
 
 
7. Landscape Works
 
The landscape works shall comprise of soft and hardscape works. The quantity of the landscape drawings have been modified to address the unavailability of treated sewage effluent irrigation water. The modification involves the replacement of softscape with gravel mulching and ornamental pebbles.
 
The only place for softscape is in the main entrance  road of the tac 仆 ity. The 「 est of the previous  area of  softscaping  works are now replace with ornamental  pebbles and gravel mulching.
 
The softscape  works  at  the  main entrance road  comp「ises of  installation and maintaining  for one year the plantation as follows:
 
1. Palm Trees = 9 nos
 
2. Ornamental Trees = 26 nos
 
3. Shrubs and ground cover   = 785 m2
 
Estimate of the gravel mulching quantities to be laid in place of the softscape works are as follows:
 
1. Type 1 Ornamental Pebbles= 450 m3
 
2. Type 2 Ornamental Pebbles= 210 m3
 
3. Type 3 Ornamental Pebbles= 230 m3
 
4. Type 4 Ornamental pebbles= 270 m3
 
 
5. Type 1 Gravel mulch
 
6. Type 2 Gravel mulch
 
7. Type 3 Gravel mulch
 
= 2,270 m3
 
= 1,280 m3
 
= 650 m3
 
 
The ornamental pebbles and gravel mulch we「e estimated at a depth of 75mm and the above figures are indicative only. Con「t actor shall be responsible in verifying the quantities shown above.
 
Included in tender drawings are the original approved landscape drawings. Cont「actor shall take note to disregard the softscape design in these drawings, Contractor shall consider only the hardscape such as trash bins, benches, walkway and pavements, and water feature details as follows
 
1. Trash Bins details
 
2. Benches details
 
3. Roundabout pavement details
 
4. Pavement and walkway details
 
 
 
5. Water feature details
 
6. Fountain at the roundabout
 
7. Electrical landscape lighting at the main entrance of the facility
 
Contractor shall be responsible in assessing the practicality and complicity of the hardscape design on walkways, pavements, water fountain and water feature and accordingly produce its own shop drawings for final approval.
 
The Contractor shall in his own discretion and experience, consider in his bid items that are not shown / mention in any of the tender documents but are necessary in completing the irrigation and landscape works as envisioned in this tender.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
 
Temporary offices at the site for government officials and the consultant Staff
 
Number of offices on the site is depending on the number of consultant's supervision staff. The offices area is as follows:
.Authority Representative
 
Soil Laboratory Room:
 
The area of soil laboratory shall be (18 m2) and the area of restroom shall be (2 m2) with add巾onal room of (20 m2) if needed. All the rooms shall be air-conditioned.
 
These areas do not include the corridors.
 
Offices furniture for government officials and the Consultant Staff
 
Government official Office
 
Large desk and desk chair +4 chairs + center table + corner table.
 
Project Manaqer Office
 
Large desk and desk chair+ 2 chair + Sofa set number 4+ center table + corner table + Documents cabinet.
 
su  ervision en  ineer or surve   or materials  en  ineer Offices: Desk and desk cha 「i + 2 chairs + corner table + Documents cabinet A small desk and cha 「i + Documents cabinet
Laboratory
 
Office and Office Chair + 2 chairs + Documents cabinet  
FOR  TENDER ONLV
2 2 OCT 2012 PAR.
,,, .  .   .. .,.,,, L-
TESOOIN M.E. Ltd.
Page 1 of 2
 
Meetinq Room Table+ 8 Chairs
Kitchen
 
12 ft Refrigerator +2 Flame Cooker+ Plates Cabinet+ Cooking and plates tools to serve the supervision staff (minimum number of 6 people)
 
All offices are air-conditioned SPECIFICATION FOR SIGN BOARDS
The specification of the sign board shall be in accordance with the drawing that is enclosed in Contract Drawings Vol. 4.
 
1. The Bills of Quantities he 面 n, including all notes and instructions shall form an integral part of the CONTRACT. However, the descriptions contained in the Bills of Quantities for each item are not necessarily complete. The CONTRACTOR is referred to the CONTRACT and APPENDICES, SPECIFICATIONS and DRAWINGS as well as the relevant Standards and Codes of Practice for further information, as no claim or VARIATION will be considered on account  of the Contractor's failure  to do so.
 
2. The CONTRACTOR shall familiarize himself with all documents comprising the CONTRACT including, but not limited to, the DRAWINGS and SPECIFICATIONS (o 「 any other information that can be reasonably inferred from any of them)  and  all obligations contained  in  the CONTRACT shall be included in the rates and prices entered herein, even if specific items relating to such obligations are not listed in the Bills of Quantities.
 
3. The CONTRACTOR'S unit rates shall be fully inclusive of the work described and must include all related work, accessories or consumable materials , incidental labou 「 , supervision, administration, tools, construction equipment, overheads,  profit and all costs and expenses  that may be required for the completion of the work described, together  with all costs and expenses in complying with all
genera「l isks, liabilities and obligations set forth or implied in the CONTRACT
 
4. DRAWINGS, SPECIFICATIONS and Bills of Quantities and all other CONTRACT Documents a 飛complementary and if any item is included in any of them, it shall be deemed included in all,
 
5. The CONTRACTOR'S lump sum price for the entire WORKS shall provide for the superv 閣 on of any or all t「 ades that are not intended to be performed with his own forces. No extra compensation for services as a General CONTRACTOR will be paid.
 
6, The lump sum amount entered by the CONTRACTOR  in  the Bills of Quantities shall constitute the entire claim for compensation fo 「 the WORKS under this CONTRACT in accordance with the conditions of contract. The WORKS shall not be re-measured  and  will be subject  to  adjustment  only as a result of VARIATIONS. The Bills of Quantities will therefore be used as a Schedule of Rates to enable pricing of VARIATIONS.
 
7. The CONTRACTOR  shall, prior to submission of his tende「, request w「itten clarification from the ENGINEER of any point he considers being a majo「 omission from the Bills of Quantities, and the ENGINEER shall issue instructions  in response to each  request.  Notwithstanding the  foregoing, the Contractor shall be responsible for ensuring that his Unit Rates and Lump Sum Price are inclusive of all discrepancies in description or quantity contained in these Bills of Quantities, as no adjustment to quantities will be made,
 
8. After submission of Tenders, it will be deemed that the value of  any  discrepancy  has  been included in the Tender sum, that all billed quantities are accepted as co 「 rect, sub 丿 ect to any adjustments  instructed  by the ENGINEER. Consequently,  no claim whatsoever will be entertained in respect of any discrepancy between individual Documents comprised in the CONTRACT.
 
9. The CONTRACTOR is required to check the numbers of the pages of the Bills of Quantities and should any be found missing or in duplicate or the figures or writing indistinc,t the CONTRACTOR shall  notify the  ENGINEER  at once and have the matter rectified before  the date of submission of
Tenders.  No  Liability  whatsoever  will  be  entertained  in  respect   of  a  y  c aim   or  error 1
CONTRACTOR'S  tender resulting from failures to comply with the foregoli: LY
 
10. Unit rates may be used reciprocally in the settlement of accounts unless conflict between them occurs. The CONTRACTOR is, therefore, to ensure that identical items occu 「 ring  in separate Bills are not priced at different rates unless this is his  deliberate intention.
 
11. The Bills of Quantities have been measured generally in accordance with the Rules of POM (I) (as here below defined). In any case in the Bill of Quantities where the  method  differs,  then  the method expressed must be accepted and measured in accordance therewith. Notwithstanding the above, the following Pricing P「 eambles are offered only as an amplification or clarification to billed descriptions.
 
12. Items in the Preambles Section of  these Bills of Quantities are deemed  to qualify and  to form part of every description of measu「ed work to which they refe「 including composite descriptions.
 
13. The CONTRACTOR shall not use the Bills of Quantities as a construction programme or for the purpose of ordering materials or a「 ranging SUBBCONTRACTS. The references for these activities shall be the DRAWINGS, SPECIFICATIONS and instructions issued by the ENGINEER.
 
14. Should the CONTRACTOR consider any further items to the items described in the Bills of Quantities are necessary to complete his pricing then he should identify these  items and include them in his offer.
 
15. Any error in description or in quantity o 「 in omission of items from the Bills of Quantities shall not vitiate this CONTRACT nor release the CONTRACTOR from the execution of the whole  or  any  part of the WORKS comprised therein according to the DRAWINGS and  SPECIFICATIONS  o 「from any of his obligations or liabilities unde 「 the CONTRACT. Any error in or omissions from the Bills of Quantities shall not be corrected by a VARIATION  issued by the ENGINEER
 
16. Lump Sum shall not be given where unit rates are applicable
 
17. Amendments shall not be  made to the Bills of Quantities without the ENGINEE  written permission
 
18. In add 仆 ion   to  common abbreviations, the following have been adopted:
 
 
POM (I):
 
 
 
 
STM: BS:
 
PRINCIPLES   OF   MEASUREMENT (INTERNATIONAL)    FOR    WORKS  OF
CONSTRUCTION dated June 1979 and published by the Royal Institution of Chartered Surveyors, London
 
American Society for Testing Materials. British Standa「d,
 
Dia: diameter
 
Hr hou「
 
mm: millimetre
 
m; meter
 
m2: square meter
 
m3: cubic meter
 
No./Nr.: Number
 
Kg: kilog「am
 
Sq: squa飛
 
Ref: reference
 
PC Sum: Prime Cost Sum
 
PS: Provisional Sum
 
LS: Lump Sum
 
19, Rates shall be comprehensive and include for, but not be limited to, the following:
 
(a) All obligations imposed by the CONTRACT.
 
(b) Complying in every respect with the requirements of the CONTRACT
 
(c) Labou 「 and all costs in connection.
 
(d) Materials and goods and all costs in connection, including samples
 
(e) Fittings and fixing materials and goods in position including hoisting to any height
 
(f) Use of scaffolding, plant, equipment and tools
 
(g) Any additional labours usually associated with measured items.
 
(h) Establishment and overhead charges and profit.
 
(i) Laps, waste and trade or any allowance.
 
20. The pricing of materials shall take account of the following:
 
a. PRICING PREAMBLES and SPECIFICATIONS shall apply reciprocally between sections of the WORKS unless otherwise described.
 
b. Materials shall be of the quality specified unless otherwise directed by the ENGINEER.
 
c. All materials shall be transported, handled, stored and fixed in accordance with the printed instructions or recommendations of their manufacturers or suppliers.
 
d. Protection of completed work, all casings and temporary coverings and  making  good, cleaning and polishing and clearing away upon completion
 
21. Where the word "allow" is used, the cost of such item shall be the responsibility of the CONTRACTOR.
 
22. The amounts set against any items of profit shall include for all costs in connection with letters of credit, bank charges, interest charges and insurance after the materials come under the control of the CONTRACTOR.
 
PilinA / Secant piles:
 
Unless detailed otherwise, rates for piling shall include the following:
 
1. Cost of carrying out structural calculations and obtaining approval from local authority and the Engineer ,
 
2. Mobilization of piling equipments.
 
3. Setting up plant at each pile position including any levelling or site preparation required.
 
4. Supply of all materials including concrete, steel reinfo「cement,etc
 
5. Provision of testing equipments and carrying out the specified tests.
 
6. Cutting back piles to the formation levels and bending steel into pile caps.
 
7. Dc-mobilization of piling equipments.
 
Excavation and earth Works
 
Unless detailed otherwise, rates for excavation and earth works shall include the following:
 
1 Increase 1n bulk.
 
2. Excavation in any material including「ock.
 
3. Upholding sides of excavation with timber or steel sheeting o「 any other means.
 
4. Keeping excavation free from water
 
5. Backfilling where required with approved material compacted  as specified and  approved by the Engineer, all to reach the specified finished levels. Any loss in volume due to compaction and for additional materials required due to penetration  of the filling materials into the ground or any settlement o「 compaction of the original ground levels unde 「 the weight of the materials or due to methods of compaction or construction  traffic shall be accounted for in the rates,
 
6. Disposal of surplus materials to areas designated by Municipality and as approved by the Engineer.
 
7. Forming temporary spoil heaps where required and multiple handling.
 
8. Levelling  and  compacting   the  bottoms  of  all  excavations  to  receive  concrete  or  othe「 construction.
 
PRICING PREAMBLES FOR WATER WORKS
 
1. General
 
The Scope of Work, Specifications, Schedules of Prices and Drawings do not necessarily cove 「 all items to achieve the 「 equirementsof the AGREEMENT. The AGREEMENT rates, however, shall be deemed to include all costs to execute the specified works and all related works, which an experienced CONTRACTOR shall reasonably foresee. Costs of items described or implied in the Specifications and not specifically mentioned in the Schedules of Prices shall be deemed to be included in the rates and prices of other items.
 
Descriptions offered by ADDC/ENGINEER  shall be for  guidance  only. The CONTRACTOR  shall be fully responsible for determining items and quantities as necessary for reaching the lump-sum prices required for performing all the CONTRACTOR's obligations under the AGREEMENT .
 
The CONTRACTOR shall be deemed to have included in his sums for all waste, bulking or compaction factors, dewatering, over pulling and all other like elements or operations required to complete the WORK(S), including all necessary measures to protect or preserve adjacent work or property during such operations, in accordance with the provisions of the AGREEMENT
 
Should any new areas of work transpire which ADDC/ENGINEER consider not envisaged as being part of this AGREEMENT, quantities shall be measured by ADDC/ ENGINEER.
 
The CONTRACTOR shall be given the opportunity, in such cases, to be present during the measurement. Prices for the new work, if any, shall be mutually agreed between ADDC/ENGINEERand  the CONTRACTOR.
 
No request shall be considered for an increase in the unit rates on the grounds that they shall be inadequate to carry out additional wo「k of a similar nature.
 
The CONTRACTOR shall be required to complete, in full, his pricing inclusions in the columns provided as listed in the Schedule of Prices. Items not priced by the CONTRACTOR shall be deemed to be included elsewhere.
 
Prices shall be quoted for each item, even when the quantity of that item is zero. This will enable variation order for unforeseen changes to route o 「 for unexpected obstacles to be priced. TENDERERS are cautioned in respect of the prices quoted for unit rates, as these will be taken into account during the evaluation of the submitted offer and excessive values will not be tolerates
 
The CONTRACTOR shall be deemed to have included for all the necessary information, details, clarifications or drawings and documents of the CONTRACT.
 
The CONTRACTOR shall be 「 equired to take all measures necessary to ensure that the whole of the WORK(S) shall be executed in such a manner so as to minimize the generation of dust and other hazards.
 
The CONTRACTOR  shall execute the WORK(S) in accordance with the specifications, drawings,
 
ADDC/ENGINEER shall have the right to remove any item from the Scope of Work due to operational o「 safety 「 equirements and the appropriate value shall be deducted from the Contract Price without any claim from the CONTRACTOR.
 
No cutting away or welding of any parts of the WORK(S) shall be pe「mitted unless with the written consent of ADDC/ENGINEER.
 
The supply of electricity and water for construction purpose shall be the CONTRACTOR's responsibility.
 
The  TENDERER's  attention  is  directed  to  the  Price  Breakdown  Summary  Sheet,  Schedule of Prices, Progress Schedule, Schedule of Cash Flow, General Conditions, Special Conditions and Requirements,  Technical Specifications and Tender Drawings,  and all these documents are  to be
「 ead in conjunction with the Schedule of Prices (Bills of Quantities) and the relevant notes on the Schedule of Prices (Bills of Quantities). Insofar as these notes on the Schedule of P 「 ices (Bills of Quantities) and Tender Drawings may affect the  execution and pricing  of the WORKS,  they shall be deemed to form part of the Conditions of CONTRACT.
 
General directions and desc 「 iptions of the WORKS and material are not necessarily repeated in the Schedule of Prices (Bills of Quantities) and reference is to be made to the relevant articles of the various sections of the Tender Document for each item of the Schedule of Prices (Bills of Quantities).
 
The TENDERER shall include but not by way of limitation all labou「, materials, tools, equipmen,t plants and appurtenances to perform all the WORKS as required for all water pipeline  work specified in these documents.
 
2. Prices
 
The TENDERER shall quote firm unit prices and based on these firm unit prices and on the estimated quantities, the TENDERER shall quote the total price for all materials C&F Abu Dhabi up to designated site stores and/or the ADDC's stores or other designated location. The C&F unit prices and total prices for all materials shall include, but not be limited to the following:
 
1. Design, manufacture, factory inspection and testing by an independent laboratory, supply, export packing and marking and all transport costs incurred until placing all materials on board the vessel, airplane or truck.
 
2. Freight from port of shipment to port of destination in the U.A.E.
 
3. Patent rights, trade marks, name or other protected rights, royalties etc.
 
4. Responsibility for any loss and/or damage until the material has been installed at the site or placed at the ADDC's storeyards.
 
5. Provision of clear on-board bills of lading.
 
6.
 
7. Dock  dues  and  port  charges,  including  import  duties  at  port  of  destination,  permits, contributions, clearance of goods through customs, off-loading and all incidental expenses
 
8. Transportation to designated stores, unloading at store and storage at stores
 
9. Checking and verifying all shipmentsreceived against shipping documents and issuing receipt and damage report.
 
10. Certificate of origin, or any other documents issued in the country of shipmen,t or those required under Laws of Abu Dhabi and the United Arab Emirates.
 
11. All expenses of the CONTRACTOR'S personnel in connection with the discussion and/or co­ ordination meetings in the ADDC's offices and/or in the ENGINEER's offices in Abu Dhabi throughout the CONTRACT Period.
 
12. The cost of marine insurance from warehouse to warehouse
 
The cost of the Third Party Inspection Authority (TPIA) shall be paid by the ADDC.
 
The TENDERER shall quote firm unit prices for all further services in connection with local transpor,t insurance, facilities  for  the ADDC/ENGINEER  and for all expenses in connection  with erection , construction or exhumation, testing, commissioning or abandonment on the basis of estimated quantities. These unit prices shall be referred to as Local Expenses.
 
The price of the Local Expenses shall include but not be limited to the following:
 
a) Loading at store, transportation from store to the site, unloading at site, handling from site storage to the point of final installation.
 
b) Complete insurance comprising marine transport insurance from warehouse to warehouse, insurance of plant, workman's compensation insurance, third party, public liability and property damage insurance, CONTRACTOR's all risks insurances etc. in accordance with Tender requirement s.
 
c) Construction, erection, installation, exhumation, testing and commissioning or abandonmetn of works and all other expenses arising until Final Acceptance of the WORKS.
 
d) All costs associated with labour and living expenses.
 
e) Cost of local transportation of any indigenous equipment and/or materials
 
f) Costs of providing transport for the supervisory staff on site to carry them from the site office to the site of the WORKS and between the site offices of the Project.
 
g) Costs incurred in providing the services of an engineer, to be made available on site at ADDC's short notice during maintenance period.
 
h) The cost of providing manuals, progress photographs in colour and/or black & white etc. as per specification or as directed by ADDC/ENGINEER.
 
i) Cost of pipeline route survey and any other survey work 「 equ 「i ed fo 「 the execution of the WORKS as per the specification.
 
j) Cost of preparation and submission of pipeline profile drawings, layout drawings, detailed drawings and any other drawings deemed necessary for the construction of the WORKS.
 
k) All  prices  and  rates  shall  include  for  preparation  of  proposals,  drawings,  engineering, calculations, documentation, etc. as shall be「equ「i ed for approval procedure.
 
I}   Any other cost or expense contingently necessary for the proper completion of the WORKS
 
The TENDERER shall quote his prices by filling in the blanks in the Schedule of Prices (Bills of Quantities) of this Section.
 
All prices quoted by the TENDERER shall not be affected by the increase in price level in any country. The lumpsum prices of those items for which a lumpsum has to be quoted and the unit prices (rates) to be entered in the Schedule of Prices (Bills of Quantities) shall be firm prices.
 
3. Scaffolding, Trestles, Ladders, Etc.
 
The CONTRACTOR shall provide at his own cost, means of access to work using scaffolding, trestles, ladders, brackets or whatever equipment the circumstances dictate with "safe" wo「king as the major consideration. Where such access shall be erected or provided for the CONTRACTOR's activities, the CONTRACTOR shall permit reasonable utilisation and use of such facilities by others executing concurrent activities provided that such permission and use shall not cause delay or unreasonable hindrance o「 interruptionof the CONTRACTOR's own operations.
 
The CONTRACTOR's scaffolding and means of access shall be erected for a period prior to commencement of the work if required by ADDC/ENGINEER and shall remain until ADDC/ENGINEER inspection process shall be satisfactorily completed. The period in either case shall not exceed one week.
 
4. Lifting Tackles, Wire Ropes, Etc.
 
All lifting tackles, wire ropes, blocks, shackles etc. including any special equipment for executing the WORK(S) shall comply with the requirements of the appropriate British Standard Specification or equivalent and carry a valid test certificate. Under no circumstances shall chain slings be used.
 
Where there shall be a possibility of damage to material equipment, or its deformation due to slinging from more than one point, ample strutting shall be p「 ovided so as to ensure that perfectly vertical lift shall be obtained.
 
5. Climatic Conditions
 
The CONTRACTOR shall be deemed to have allowed for all effects on the execution and progress Of WO「k s occasioned by climate and prevalent conditions and with specific reference to periods of high humidity and the incidence of wind/air borne dust occurring naturally.
 
Page 4 of 28
 
6. Removal of Debris
 
Accumulated debris or unusable materials shall be removed by the CONTRACTOR to a suitable location off site designated  by Municipality.  The cost of  cleaning  up and removal  shall be deemed to be included in the CONTRACTOR's rates.
 
7. Land Cutting and Filling
 
Where 仆 is necessary the part or all of the project area shall be levelled by means of balancedcut and  fill  with  use  of  the  original  materials  and  the  Contracto「  shall  adhere  to  the  following procedure:
 
a) The Contractor shall survey the original topography of the designated area and provide cross-sections at 25 m intervals and as directed at site by ADDC/ ENGINEER.
 
b) The said area shall be refe「red to a suitable fixed local temporarybenchmark and the cross­ sections shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the future preparation of cross-section profiles after completion of the land cut/f曲 ng operation
 
c) On completion of land cut/filling a 「 esurvey of the designated area shall be made along the same cross-section grid to establish the finished profile and levels of the site as pe 「 the Contract Drawings.
 
d) All elevations shall be referred to the contract datum.
 
The rates and prices for the CONTRACT shall include all costs related to leveling of the pipeline route area by means of the balanced cut and fill that shall be carried out prio 「 to commencement  of excavation fo 「 layingthe pipes.
 
It shall therefore be the TENDERER(S)  sole responsibility to ensu「e that all the necessary information in this respect are duly gathered by him on site prior to establishing his rates and prices for the CONTRACT.
 
8. Embankments
 
In low lying areas where the balanced cuVfilling of the land can not be applied, it is necessary that the pipeline be laid in embankments/bund constructed  from approved imported  fill mate「ials, the CONTRACTOR shall adhere to the following procedure:
 
a) The   Contractor   shall   survey  the   original   topographical   contou「  along   the  proposed centreline of the pipeline and p 「 ovide cross sections at 10 m intervals, or as directed at site by ADDC/ENGINEER.
 
b) The said contour shall be 「 eferredto the corresponding elevation of the edge of the road or other notified refe 「 ence level and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate  the future preparation  of cross section profiles  at 1O metres intervals
afte「 constructionof the embankments.
 
All elevation shall be referred to New Abu Dhabi Datum or as instructed by ADDC/ENGINEER
 
It shall therefore be the CONTRACTOR's sole responsibility to ensure that all the necessary information is duly recorded and certified by ADDC/ENGINEER, prior to the commencement of any work which, for purpose of any payment,  may require compliance  with  the  above mentioned
procedu 飛
 
If the existing surface level is found to 「 equire filling under the pipe in order to give a minimum cover of 1000 mm on top of the pipe, such filling shall be executed to the requiredbottom level of the pipe.
 
The supply, placing and compaction of imported fill material shall be measured per cum as placed into position after compaction.
 
9. Surveying
 
Surveying work shall be carried out in accordance with the relevant specifica tion, clauses and drawings. The cost for such work shall be deemed to be included in the rate of  the  respective  items. Surveying  work shall include, but not be limited to, the following:
 
a) All labour, equipment and materials necessary for the survey and pegging out of  the pipelines and other structures and installations.
 
b) The surveying of the most suitable route bearing in mind the construction and site operating requirements, including trial hand excavation to locate existing unde「ground services etc
 
c) Any deviations or changes from the route or locations shown on the Tender Drawings whether  necessitated by local conditions  or by ADDC's/ENGINEER's requirements
 
d) The pegging out with approved conspicuous pegs at such intervals that when standing  at any peg, both the preceding and following pegs are in view, including maintenance and protection of the pegs.
 
e) The installation or marking and maintenance of a reference benchmark(s) on site, referenced to established site datum, as instructed by ADDC/ENGINEER.
 
f) The preparation of survey route cross section and profile drawings giving all necessary elevations, dimensions and data,「elatedback to the reference benchmark.
 
g) The provision of all necessary assistance, equipment transport etc to ADDC/ENGINEER as specified elsewhere.
 
10. Precast Concrete Items
 
Cost for all required precast concrete items and related works shall be deemed to be included in the rates of the respective items. Cost fo 「 precastitems such as, ARV and valve spindle protection chambers, marker posts, pipe sleepers, pipeline protection slabs, paving elements, kerbstones etc, and shall also include fo 「 the provision of samples if required of each precast item for quality review and approval, and for storage, handling transport, installation in position etc
 
The rates fo「 the chambe「 and valve spindle protection chambe「 shall be per unit and shall include for the supply and installation of all ancillary items as for reinforced concrete chambers.
 
Cost for marker posts shall include for stainless steel plates, painting, markings etc as detailed on the Tender Drawing.
 
The provisions of this clause shall apply equally to proprietary plastic protection or marker boards if approved as an alternative to precast concrete slabs.
 
Cost for paving elements such as concrete slabs, interlocking blocks or pavers etc, shall be inclusive of all retaining kerbs, haunching, bedding, jointing etc.
 
11. Discount
 
If a discount is offered by the CONTRACTOR it shall apply to all Schedules of Prices through establishing the discount percentage in respect of the relevant Agreement price and then applying this percentage to each of the items in the Schedule of Prices. Whenever a general discount is offered affecting the prices, the percentage of such a discount with respect to the total value of the schedule of prices shall be applied to all the items pro rata. Re-adjustment of the prices in any other  manner will not be acceptable.
 
12. Quantities And Rates
 
All the quant 仆 ie s stated in the Schedule of Prices (Bills of Quantities) shall be treated as approximate only and are given to provide a common basis for tendering. The basis of payment shall be the actual quantities of supplied and installed material and works carried out, as measured and accepted by the ENGINEER or his representative and valued at the rates or prices quoted in the Schedule of Prices (Bills of Quantities).
 
The CONTRACTOR shall prepare detailed construction shop drawings based on the CONTRACT Plans  and as directed by the ENGINEER.  The CONTRACTOR  shall  carry  out extensive   field
 
Pag e 7 of 28 TEBOOtN M.E. Ltd.
 
investigation and consider all existing conditions and obstructions for the preparation of shop drawings. Shop d 「 awings should in addition incorporate all required revisions to the CONTRACT Drawings including, but not limited to additions, deletions or route changes of the proposed lines  as directed by the ENGINEER.
 
The CONTRACTOR shall assess the preliminary quantity of materials to complete the WORKS based on the CONTRACT Drawings or shop drawings as considered appropriate by the CONTRACTOR to ensure procurementof materials as early as possible and as demanded by the CONTRACTOR's   construction   time   scheduling.   The   CONTRACTOR's   proposed   materials procurement list identifying the items and quantities should be submitted to the ENGINEER fo 「assessing the availability of 「f ee-issuematerials from the ADDC's con 「t acts and/or ADDC Stores, prior to ordering the materials.
 
The ADDC may supply certain materials as free issue from other contracts and/or from the ADDC stores, if such items are available as surplus. Prior to ordering the materials, the CONTRACTOR shall explore the availability of these free issue materials with the ENGINEER. If it is established that part of the materials are available for free issue, then the ENGINEER will issue the appropriate instructions to the CONTRACTOR for the CONTRACTOR to make a「「angementsto collect the materials and incorporate them into the WORKS. Such material will be in lieu of the materials to be supplied unde 「 BOO No. 1 and shall be transported/constructed/installed in accordance with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) fo「Construction and Installation.
 
After completion of the above steps, the CONTRACTOR should assess the quantities of the remaining materials required to complete the WORKS and, as soon as material data sheets are approved, should proceed with ordering the 「 emaining materials after accounting the free issue items and quantities. To lessen the possibility of procuring surplus materials, which may not be actually required for the WORKS, the CONTRACTOR should finalise and get approval for the shop drawings in a timely manner, prefe「ablyprior to ordering his materials
 
Payment for the CONTRACTOR supplied materials will be made only for the measured installed quantity. If there has been a 汜 vision to design ordered by the ADDC after approval of the shop drawings and after ordering the materials, consideration will be made on paying for the resulting surplus materials based on the ADDC's and/or ADDC's acceptance of a properly documented claim.
 
The responsibility for assessment of Materials Quantity is  with  the  CONTRACTOR CONTRACTOR does not have to wait for either processing his shop drawings or quantity authorisation by the ADDC and/or ENGINEER, for ordering materials once the  material  data sheets are approved. Any material that becomes surplus, due to over estimation by the CONTRACTOR will not be paid for and such materials will be the property of the CONTRACTOR
 
It shall be the CONTRACTOR's sole responsibility to orde 「 a certain amount of material necessary for the uninterrupted completion of the WORKS to compensate for material losses due to cutting of pipes , wastage, at no extra cost to the ADDC
 
The TENDERER shall include extra costs, if any, associated with part ordering of materials.
 
TEliODIN M.E. Ltd.
 
A separate price or rate shall be entered for each item of the Schedule of Prices  (Bills of Quantities) in figures. Items against which no price or rate is entered will be deemed to be covered by rates or prices of other items of the Schedule of Prices (Bills of Quantities). No new items shall be added to the Schedule of Prices (Bills of Quantities) nor shall any alternatives be made thereto.
 
In case of discrepancy between the quoted unit rate or price and the total amount for any item of Schedule of Prices (Bills of Quantities), the unit rate or price shall be binding
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of all costs incurred in any manner whatsoever in complying with the provisions of the Tender Documents , whether or not such items are specifically described in the Schedule of Prices (Bills of Quantities), including all labou「 cost, testing of materials by independent  laboratories, temporary works, erection, testing and commissioning, maintenance, insurance, taxes, duties,  every incidental and contingent cost and charges whatsoever.
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of the cost of all ancillary work and materials not separately mentioned in the Schedule of Prices (Bills of Quantities), but which may  reasonably  be implied to be necessary by the Specification,  Schedule of Prices (Bills of Quantities) or Drawings, or reasonably be inferred to be necessary there f「om, or which are usual or essential to the completion of the WORKS.
 
The prices and rates inserted in the Schedule of Prices (Bills of Quantities) shall be the full inclusive value of the work described under the several items, including all costs and expenses which may be 「 equired in and for the construction and installation of all the work described completely , together with all general risks, liabilities and obligations set forth or implied in the Tender Documents.
 
The rates quoted in the Schedule of Prices (Bills of Quantities) shall include for all costs and shall be deemed to be complete in all respects conforming to the Tender Documents and normal acceptable construction practices fo「 all the WORKS until the date of Final Acceptance Certificate.
 
The work shall be measured net as executed and erected on site unless otherwise specified.
 
All materials brought onto the site by the CONTRACTOR in accordance with the approved shop drawings are the ADDC's property and shall be in CONTRACTOR's custody fo 「 erection and installation.
 
The  ADDC  may provide certain materials  from ADDC's  stores and/or from ongoing  projects for
inco「poration in the WORKS. Such material will be in addition to or in lieu of the materials to be supplied unde「 BOQ No. 1 and shall be transported/constructe/dinstalled in accordance  with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) for Construction and Installation.
 
All materials ordered by the CONTRACTOR before the free issue of certain materials by the ADDC and become surplus due to the free issue, shall be assessed by the CONTRACTOR prior to their shipment to the U.A.E. and returned/deliveredby the CONTRACTOR directly to the ADDC's stores and/or other designated stores at no add仆ion al cost to the ADDC.
 
TEBOO,N  M.E.. Ltd.
 
All unused free issued and/o 「 approved surplus materials shall  be  cleaned/repaired at no extra cost to the ADDC, delive 「 ed and offloaded undamaged by the CONTRACTOR as and  when required by the ADDC to the ADDC's stores within 90 KM or any other place if required. The transportation cost of justified approved surplus materials will be paid in accordance with the relevant item in BOQ No. 3.
 
Should there be any discrepancy between unused free issued quantity, the approved surplus quantity and the quantity of undamaged materials delivered and taken over by the ADDC's Stores and/or other designated stores, then the difference shall be evaluated using the respective  rates and prices in the Schedules of Prices and the amount deducted from the CONTRACT PRICE.
 
13. Working Hours
 
ADDC's working hours at SITE are set out in the TENDER Documents. The CONTRACTOR  shall be allowed to work outside the site working hours and days at the disc 「 etion of ADDC/ENGINEER subject  to security  and  othe 「 rules  at  each  location.  All  extra  costs  incurred  through working
ove 巾 me shall be included in the CONTRACTOR's price. Such costs  shall include, but not limited to travel, overtime, supervision, food and all incidental expenses.
 
14. Safety Provisions
 
Unit Rates and Prices shall include for all site protection as per ADDC Safety Rules  and Regulations, T「 affic Police, Municipality, Oil Companies or other relevant Authorities, including but not limited to provision of metal screens and safety barriers and all measures necessary to protect adjacent structures, properties from the effects  of over spray, paint spatter or drainage  by impact of o「 introductioninto machinery of sand blasting material. All such measures shall be provided  to the satisfaction of ADDC/ENGINEER
 
15. Excavation and Backfilling
 
Unless specified otherwise, the rates given in the Schedule of Prices (Bills of Quantities) fo 「excavation and backfilling of trenches, foundations, etc., shall include, but not be limited to:
 
1. All labour, equipment and materials necessary
 
2. Clearing and grubbing of the site and the pipeline route and「emoval of any obstruction.
 
3. Hand or machine digging and excavation in all type of ground, not specifically mentioned under separate BOQ items, and stacking the spoil adjacent to the excavations in an approved manner. No distinction shall be made between soft, hard or rocky ground even if any of the foundation areas or pipeline routes are changed from those shown on the CONTRACT Drawings to any othe「 route w咖 n the working area of this p「oject.
 
4. Construct   and  maintain  all  ramps,   temporary  access,  safety  barriers,   signs,   lights and
diversion「oads as required by the Traffic Police, Municipality, Oil Companies or other relevant Authorities.
 
 
Page 10 of 28
 
5. Dewatering of excavations and disposal of wate「 by any means  in an approved  manner as directed by the ADDC/ENGINEER and as per the requirements of the concerned Authority.
 
6. Double or multi-handling where necessary in connection with the removal and disposal of surplus o「 unsuitableexcavated materials to a location approved by the ADDC/ENGINEER.
 
7. Working around or under and protecting any ad丿ac ent structures, pipes, cables, ducts or other existing services and structures.
 
8. Any exploratory holes, trenches, etc. that may be required to locate services o「 to test soil characteristic.s
 
9. Supply and placing of pipeline bedding materia,l levelling and compacting the bottom of excavation,s trimming and shoring sides of excavation slopes and placing  backflil in compacted layers over and around the pipeline.
 
10. Completing the backfilling in compacted layers including the provision for importing  an approved backfill material as necessary and restoring the area as directed by the ENGINEER
 
11. Provision of fencing, lighting, watching, temporary reinstatement and maintenance of surfaces other than asphalt roads, parking areas, footpaths, e tc., and every other expense in strict conformity with the Specification.
 
12. Any additional excavation for buried valves, f「i e hydrants, fittings, etc.
 
13. Should the CONTRACTOR over excavate any part of the WORKS either depth wise o「 width wise, such over excavation shall be made good with approved backfill material at CONTRACTOR's  expense.
 
14. Excavation and trenches in the existing and/or proposed roads shall be backfilled to the grade level with thoroughly compacted material approved by the ENGINEER
 
15. Removing all su 「 plus excavated material and levelling and landscaping as directed by ENGINEER
 
16. Reinstatement of road surfaces,  green areas o「 any other buildings,  structures,  pipes, cables or any other services which has been removed or damaged in order to perform the WORKS
 
17. Obtaining necessary permit to work from Oil Companies, Defence/security areas, Traffic Police, Municipality or other Authorities that my be required to perform the wo「ks.
 
18. Provision of shoring and shutting to safeguard against side collapse of excavations and trenches.
 
19. All costs with respect to disturbance of green areas not covered by the 「 egulations of the Agriculture Department.
 
Measurement for excavation, dewate「ing and backfill shall be per metre run (MR) of trenchgiving a minimum cover to the pipe of  as specified in the tende 「 docur:i罕 and is ir「espective of the
 
 
Page 11 of 28
 
TEBO,一DfN M.E. Ltd.
 
trench width for all operations till completion of the CONTRACT. Where add 仆 ion al excavation is necessary, it shall be measured for every additional 500mm depth specified, but shall only be considered valid when the continuous length of trench requiring additional excavation exceeds  thirty (30) metres at any individual location and more than one location along the excavation route shall not be measured cumulatively. Additional excavationless than 500mm shall be deemed to be included in the unit rate for excavation, dewatering and backfilling
 
Extra excavation, dewatering & backfilling required for construction of chambers, pits and thrust block s shall be included in the rates for construction, erection etc. of respectvi e items in BOO No. 2.
 
Excavation, dewatering and backf 曲 ng for any other excavation work as directed by the ENGINEER shall be per cubic metre (Cum) and as specified in the Schedule of Prices (Bills of Quantities)
 
The supply and placing of ex 「t a fill materials shall be measured per cubic metre (Cum) as placed into location afte 「 compactionand include transportof original material to a site approved by the ENGINEER.
 
In low lying areas where it is necessary that the pipeline be laid in embankmenst constructed from
approved  imported   fill   material,   the   rates  fo「  suppyl   of   fill   material   and  construction  of
embankments shall be per cubic metre (Cum). The CONTRACTOR shall adhere to the following procedure:
 
a) The CONTRACTOR shall survey the original topographical contour along the proposed centre line of the pipeline and provide cross sections at 25m intervals.
 
b) The said contour shall be related to the corresponding elevation of the edge of the road and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the  future preparation of cross section profiles at 25m intervals after construction of the embankments
 
c) On completion of the construction of the embankments a survey shall be made to determine the final contours, which shall then be plotted against the original contours to establish profiles at 25m intervals thus determiningthe final volume.
 
Irrespective of the method of measurement adopted by the CONTRACTOR, when preparing his invoices for fill material, the final quantities shall be defined from the results of the application of paragraphs a), b) and c) above.
 
It shall therefore be the CONTRACTOR's sole responsib 仆 ity to ensure that all the necessa ry informationis duly 「 ecorded and certified by the ENGINEER, prior to the commencement of any work,  which, for purposes of  any payment, shall require compliance  with  the above-mentioned procedure.
 
If the existing surface level is found to require filling under the pipe in order to give a minimum cover, as specified in the tender documen,t on top of the pipe , such filling shall be executed to the required bottom level of the pipe
 
 
Horizontally this filling shall be extended up to the nearest「oad ke「bstone, whenever this is 5m o「less from the pipeline. Unit rates for this operation shall include for the supply of suitable fill material.
 
Imported fill material required for embankments shall be measured from the existing surface level or from the bottom of pipe, whichever is the higher, up to the final road level, all as calculated from the results of the route survey mentioned above.
 
16. Concrete Works
 
The rates and prices for all concrete wo「ks shall include but not be limited to:
 
1. Any calculations, detailing and construction drawings, which in the opinion of the ENGINEER are necessary for the proper execution of the WORKS.
 
2. The supply of concrete, reinfo 「 cement, all-necessary labour, equipment and materials required fo「 the preparation, placing and protection of the concrete works.
 
3. The required excavation, backfilling, blinding, formwork, placing of concrete, compaction and vibrating and any additional formwork for the construction of joints, stop ends, building in fittings, pipes, conduits, bolts and the like, which although not specifically mentioned in the Tender Documents or shown on the drawings, are reasonably to be inferred from the specifications or  drawings  and  the ADDC's/ENGINEER'isnstruction.s
 
4. The supply and fixing of formwork and steel reinforcement in accordance with the drawings and specifications, includingall cutting, bending, fixing and provision of all necessary spac 「e bars, saddles, binding wire etc
 
5. Sampling and testing the characteristics of the concrete and concrete materials as per the specfiication.
 
6. The supply/application of protective coatings and waterproofing to cone「ete below ground or exposed to atmosphere as pe「 thespecification or shown on the drawings.
 
7. Supply and fixing of water stop at joints as per the specification or shown on the drawings.
 
In situ concrete shall be measured as the net volume shown on the drawings or variations to the drawings as directed by the ADDC/ENGINEERor his representative,sbut no deductions shall be made for  small chamfe「s,  steel work, reinfo「cement, bolt holes「equiredto be built in,  nor shall extra value be measured for splays or fillets.
 
 
 
17. Supply of Materials
 
Unless specified otherwise, the rates for the supply of all materials shall include all costs in respect of manufacturer's testing, testing by independent laboratory, C&F charges, clearance, all handling and transportation, storage, and any other costs incu「red under the obligations of the CONTRACT
 
The rates for the supply of pipes, valves, fittings etc. shall include for all lubricant, bolts, nuts, washers, gaskets, wheels, extension spindles , extension pieces, warning tapes, polyethylene sleeves, etc. and protective coatings as specified in the Tender Documents.
 
18. Storage, Warehousing, Etc.
 
The CONTRACTOR shall include for all temporary warehousing required by the CONTRACTOR to store his materials etc., in accordance with the CONTRACT, including Vendor's  storage instructions . The CONTRACTOR shall include for the protection and storage of sensitive material including pressurized and/or air-conditioned storage. The protection of all works and material shall be by the CONTRACTOR whether to installed or non-installeditems.
 
19. Pipe Construction
 
Unless otherwise specified or covered by separate BOQ items, the rates for pipe construction shall include, but not be limited to:
 
1. Supply of all labour, tools, equipment, plant and installation
 
2. The installation of polyethylene sleeve and placing of warning tape over the pipeline as per specification.
 
3. Costs for cleaning, jointing and cutting, trimming and otherv-Jise preparing the ends of pipes, hydrostatic pressure testing, flushing, disinfecting, sampling, commissioning and handing over of the completed WORKS.
 
4. All cost「elatedto collection and transportation of the water samples from site to the testing Laboratory and collection of Test results and submission to ADDC/ENGINEER's office
 
5. The water required for testing, flushing and disinfection shall be a「rangedby the Contractor at his  own  expenses.  Contractor  shall  be  responsible   to  arrange  all  ancillaries,  logistics, connections etc. for transmission of water from network point and tankers (certified for potable water) for transmission of water from supply station, if required.
 
The measurement for pipe construction shall be per metre length (MR) of pipeline including all valves and fittings, measured along the axis of the line before backfilling
 
 
20. Valves and Flowmeters
 
The supplies of gate valves and butterfly valves shall be measured per unit of each type and size. The prices for the supply of material shall be inclusive of, but not be limited to the following
 
1. A stem coupling of standard dimensions.
 
2. An extension spindle with standardised cap extending to approximately 150mm below the surface box cover.
 
3. Supply of hand wheel for butterfly valvesfor operation from inside the chamber.
 
4. Supply of bolts, nuts and washers or other approved bolt systems and rubber gaskets.
 
The TENDERER shall also include in his rates for the supply of 1 (one) number "tee" handled operating keys for every 10 (ten) valves supplied with a minimum of one.
 
The installation of valves, flow meter, flow control valves, etc. shall be measured extra over the appropriate item for installation of straight pipe for each type and size and shall include for installation of all accessories.
 
21. fittings
 
The supply of fittings shall be measured per unit of each type and size. Flanged items shall include all necessary bolts, nuts, washers and gaskets .
Should certain items described not be  available, the CONTRACTOR  shall propose  alternatives. The unit rates listed in the Schedule of Prices (Bills of Quantities) for both supply and installation shall in these cases are deemed to cover all components of any such  proposed alternative. The alternative  proposals are subject to the ADDC's/ENGINEER'sapproval.
 
The installation of fittings shall be measured extra over the appropriate item for installation of straight pipe fo 「 eachtype and size fully installed and readyfor operation.
 
22. Covers and Surface Boxes
 
The supply of D. I. or Aluminium covers and surface boxes shall be measuredpe「 unit of each type and size complete with frame.
 
The rate shall include for lettering on covers and surface boxes, coating, supply of lifting keys, etc all as pe「 specificationand as shown on the drawings.
 
The cost of installation of covers, frames and surface boxes shall be included in the cost of the construction of the「elevantconcrete s「t ucture.
 
 
23. Crossing of Oil/Gas Pipelines
 
The crossing of oil/gas pipelines shall be per crossing of oil/gas pipeline measured ex 「t a over the appropriate item fo「 the installation of straight wate「 pipelinefor each size
 
The rates for the crossing of existing oil/gas pipelines shall included but not limited to taking all precautions   and   safety  measu「es  and   compliance   with  the  owner   of   the  oil/gas  pipeline requirements and as per the specification.
 
24. Non Disruptive Road Crossing (NDRC)
 
NDRC shall be paid by meter run (MR) of pipeline to be constructed by NDRC fo 「 each diameter as described in the BOO. The length of the pipeline shall be measured along the centre line of the casing pipe.
 
A maximum time period of 35 working days will be allowed for NDRC pits (with specific fencing) to remain open. The ADDC reserve the right to deduct an amount pro rata and in accordance  with the Schedule of Prices for each NDRC pit that remain open beyond the maximum 35 working days specified. This 35 days period includes for everything necessary to complete the whole work at each NDRC pit including site restoration.
 
The unit rates for NDRC works shall include for all soil investigation necessary prior/during the NDRC work, field testing, laboratory testing, submission of design and method statement for the NDRC work, obtaining No Objection form the concerned Authorities, obtaining existing utility information, p 「 eparation and submission of detailed construction drawings, surface movement points, fencing of working area and pit locations, construction of thrusUreception pits, installation of
D. I. restrained water pipeline including restraining set (as supplied unde 「 BOONo. 1), provision of bentonite slurry, supply and installation of approved casing pipe, provision of grouting for casing pipe, grouting of annular space between the water pipeline and casing pipe,  excavation, dewatering, backfilling, pressure testing and disinfection of completed pipeline sections  and surface reinstatement  all as per the specification.
 
25. Concrete Chambers and Boxes
 
25.1 Chambers for Valves
 
The unit rates for construction of reinforced concrete watertight chambers shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved materials in compacted  laye「s,  removal  from  the  site  of  excess  materia,l  preparation  of  foundation,  all measures to protect the existing waterlines du 「 ing construction, supply of all materials complete with precast concrete cove「 slab,factory applied fully epoxy coated lifting hooks, supports for valve spindle  extension  (if  required), bituminous painting,  waterproof membrane,  asphalt  hardboard, sealing compound etc.; casting in of anchor flange and sealing flange (waterstops) as supplied in BOO No. 1, casting in of access covers, frames and surface box as supplied in BOO No. 1, bolting of aluminium ladder as supplied in BOQ No. 1, all as shown on Tender Drawing but excluding D.I pipes, fittings, sleeves, valves, water meters, and strainers.  Details  of lifting hooks, ladder, vent pipe, waterstops & valve chamber protection are shown on the Tender Drawings. All concrete works shall be according to specification
FOR TENDER ONLY
 
 
25.2 Marker Posts for Chambers
 
The unit rate for marker posts shall include but not be limited to the supply of all materials, 100mm (4") dia. hot dipped galvanised steel pipe (950mmlong, wall thickness minimum 6mm) complete with painting, concrete foundation, filling of pipe with concrete, excavation, backfilling  etc. all as shown on Tender Drawing.
 
26. Concrete Slabs For Pipeline Protection
 
The unit rates for construction and installation of precast reinforced concrete slabs for protection of waterlines shall also include but not be limited to the supply of all materials, excavation to the required level, excavation to determine  the location of the waterline, dewatering, transport to the site, placing of slabs, installation of warning tape, backfilling with approved  fill  material  in compacted layers to the required grade, all as per specification and shown on Tender Drawing.
 
27. Concrete Ducts for Waterlines
 
27.1 Circular Ducts
 
The unit rate for construction of reinforced concrete encased 450mm, 600mm, 800mm, 1000mm, 1200mm & 1500mm diameter G.R.P. ducts shall include but not be limited to submission of structural design calculations fo 「 ADDC/ENGINEER approval, p「 ovision of construction drawings, supply   of  all  materials   inclusive   bituminous   coating,  excava tion,  dewatering,   backfilling   in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
27.2 Box  Ducts and Box Culverts
 
The unit rate for construction of reinforced concrete box ducts and box culverts shall include but not be limited to submission of structural design calculations for ADDC/ENGINEER approval, provision of constructiondrawings, supply of all materials inclusive bituminous coating, waterproof membrane, asphalt hardboard, waterstops at expansion joints, sealing compound, construction of access shafts, installation of auxiliary items (covers & frames, ladders, etc.), excavation, dewatering, backfilling in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts/culverts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
28. Concrete Slab for Protection of Surface Box
 
The unit rate for construction of reinforced concrete valve spindle protection slab, shall include but not be limited to the supply of all materials, installation of surface bo x as supplied in BOQ No. 1, supply and installation of valve spindle protection tube with dust cap, excavation and backfilling all as shown  on Tender Drawing
 
 
29. Instrumentation Devices for Sector Measuring Point
 
Unit price for the instrumentation devices required at each bulk consumer and sector-measu 「 ing point  shall  be  ente「ed in  the  Schedule  of  Prices  (Bills  of Quantities)  under  separate  items  for supply and installation. The unit rate per set shall include but not be limited to the items as in BOQ No. 1 and mentioned in the specifications for bulk consumer measuring point and for sector measuring point.
 
30. Unit Rates for Manpower Equipment and Material
 
Unit rates in the Day Works Bill shall only be applied in connection with any work, as may be
requ「i ed by ADDC/ENGINEER outside the contractual agreed price.
 
Unit rates in the Day Works Bill for manpower and equipment shall be completed by the TENDERER(S) and submitted together with and as part of his TENDER. The TENDERER($) shall extend these rates and enter total amounts based on the estimated quantities.
 
Labour rates shall include all wages, bonuses, allowances, supervision, overhead cost, social premiums, profits, insurance, travel and accommodation etc. The labour rates shall also include for all hand tools and appliances.
 
Unit rates for equipment shall include the operator, fuels, lubricants, auxiliary equipmen,t service and repairs, insurance, transport, etc. The CONTRACTOR shall fill in the size and type of equipment which are not listed under this CONTRACT and which he might be 「 equ 「i ed to use in the execution of the works.
 
Reimbursement for labour and equipment usage under these rates shall only be made if the work involved is authorised or instructed by ADDC/ENGINEER against signed labour and equipment return s. It shall be the sole responsibility of the CONTRACTOR to ensure that all the necessary information is duly recorded and certified by ADDC/ ENGINEER during the progress  of  the relevant work.
 
Price s for materials supplied on unit rate basis shall include for all loading, transporting, unloading, storage, overhead and profits and all other associated costs. Prio「 approval of ADDC/ENGINEER shall be obtained for materials「equiredto be supplied for which no unit rates are ente「ed.
 
Under-utilizationor non-utilization of these unit rates shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the Contract Value.
 
31. Charges for  Disturbing And/Or Removal of Grass, Trees
 
The current regulations of the Agricultu「al Section of the Abu Dhabi Municipality dictate that before any pipe laying activities in green areas are allowed to start, charges at the current applicable rate for  disturbing,  removing  and  reinstallation  of  plantations shall  be paid  by  the CONTRACTOR
d「i ectly to the mentioned section.
 
Solely the representative of the Agricultural Section will determine the extent of affected green area.
 
The CONTRACTOR will be reimbursed the actual amounts paid, net, on presentation of proof of payment, subject to the ADDC's/ENGINEER's approval. All overheads, handling charges and all other costs involved shall be included in the other rates for local expenses. The Agricultural Section will perform removal, preservation if any, transportation and reinstallation of plantations as required.
 
The CONTRACTOR shall comply with the most recent regulations issued by concerned authorities regarding working in  the vicinityof planted areas
 
32. Reinstatement of Asphalt Road Surfaces
 
Unit 「 ate for reinstatement of asphalt road surfaces shall be measured per metre run with a maximum width of 2.0m and shall be paid as per CONTRACTOR'S quoted rate. The TENDERER's attention is drawn to Abu Dhabi Municipality Road Section regulations. The mentioned Section may order asphalt reinstatement to be carried out by specialised roadwork contractor approved by the Abu Dhabi Municipality. Contractor to price the item for reinstatement of existing asphalt road in accordance with the current practice being followed by the Abu Dhabi Municipality. The unit price  quoted  against  this item  shall  include for  mobilization/demobilization,  supply  of materials, reinstatement, protection works, detour, traffic control, warning systems, supervision by specialist consultant, main contractor's over head etc. The CONTRACTOR, while pricing this item, is deemed to be aware of the current practice and requirement of the Abu Dhabi Municipality for cut and reinstatement of existing asphalt road surfaces.
 
33. House Connection Arrangements
 
33.1 Concrete Water Meter Box
 
The unit rate for construction of reinforced concrete water mete「 boxes  shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess materia,l preparation of foundation, supply of all materials complete with 160mm diameter uPVC inlet and outlet pipes with temporaryend caps, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, transport to site, installation  of a watertight connection between 160mm diameter duct and water mete「 box, adjusting cover and frame (as supplied in BOO No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawings.
 
 
33.2 Wall Mounted GRP Water Meter Box
 
The unit rates for the supply of wall mounted GRP water meter box shall include but not limited to the supply of stainless steel fixing bolts, lettering on the box in Arabic and English, lockable main door, lockable water meter reading door, provision of key for the lockable door, etc all as per the specification and as shown on the Tender Drawings.
 
The unit rate for installation of the wall mounted GRP water meter box shall include but not be limited to the supply of all materials, installation of the GRP box (as supplied in BOO No. 1) into position, replacement of tiles, bricks or concrete that is damaged during the box installation and
「epainting of the wall as all as per specification and shown on the Tender Drawings.
 
The unit rate for installation of large radius VC bend shall include but not be limited to the supply of all materials , supply and installation of the uPVC bend into position, concrete work, bituminous painting, excavation, backfilling, end capping of the bend, supply and installation  of  protection tube, supply and installation of brass brackets, supply and installation of stainless steel fixing bolts, replacement of tiles, bricks or concrete that is damaged during the bend installation and repainting of the wall as required all as pe「 spec巾cation and shown on the Tender Drawing s
 
33.3 Concrete Stopvalve Box
 
The unit rate for construction of「einforced concrete stop valve box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, preparation of foundation, supply of all materials complete with 110mm or 160mm diameter uPVC inlet and outlet pipes with temporary end caps, bituminous painting, transport to site, installation of a watertight connection between 110mm o「 160mm diameter duct and stop valve box, adjusting cover and f 「 ame (as supplied in BOQ No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawing
 
33.4 Pulling Box
 
The unit rate fo 「 construction of reinforced concrete pulling box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess material, preparation of foundation, supply of all materials complete with 110mm o「 160mm diameteruPVC inlet and outlet pipes, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, installation of a watertight connection between 110mm o「 160mm diameter duct and pulling box, adjusting cover and frame (as supplied in BOQ No. 1) to sidewalk level etc., all as shown on the Tende「 Drawing.
 
33.5 uPVC Ducts (0 110mm & 0 160mm)
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, sealing of duct entrances with end caps, 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backf 曲 ng with approved material in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing
 
33.6 Reinforced Concrete Encased uPVC Ducts (0 110mm & 0160mm}
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, reinforced concrete encasemen,t bituminous painting, sealing of duct entrances with end caps, marking of duct ends with concrete blocks carrying the letter 'W", 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backfililng with approvedmaterial in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing.
 
33.7 7 Polyethylene House Connection Pipes with Auxiliary Items
 
Rates for installation of house connections from distribution mains up to the consumer facility shall be entered in the Schedule of Prices (Billsof Quantities) as a unit rate.
 
No differentiation is made between the installation costs for½", ¾", 1" and 1½" diamet 「e house connections.
 
The unit rate shall include but is not limited to:
 
1. All costs related to providing under pressure-tapping machines inclusive spare parts as described in the specification.
 
2. All costs related to the acceptance tests as described in the specification.
 
3. Excavation necessary to locate the existing wate「 mainfor makni g the tapping.
 
4. Excavation , dewatering, backfilling, and under pressure installation of tapping, with stopcock and coupling, including supply and installation of the wrapping of the ferrule and the saddle strap.
 
5. Excavation, installation and backfill in compacted layers for the polyethylene pipes under unpaved areas between tapping and duct and/or between duct entrances.
 
6. Installation of polyethylene pipes through ducts to water meters; or through ducts and pulling boxes to water meter boxes.
 
7. Closing duct ends after installation of polyethylene pipes.
 
8. Installation of stop valve, non-return valves, lockablevalve, water meter, fittings, couplings etc in the relevant water meter boxes, all as shown on Tender Drawings.
 
9. Supply and installation of water meter support and watertight closing of 110mm or 160mm diameter outlet holes in water meter box wall
 
10. Testing, disinfection, flushing, commissioningetc. of polyethylene pipes including supply and installation of cap (temporary) at the end of the line.
 
11. Installation of warning tape (as supplied under BOQ No. 1) above polyethylene house connection pipes in unpaved areas.
 
12. All costs related to disconnection of existing consumer connection and connection of newly installed house connection to consumer premises, including mobilisation and demobilisation costs of the house connection crew.
 
The details of the tapping machine(s), which will be used by the CONTRACTOR, shall be submitted fo「 approval to the ADDC /ENGINEER.
 
33.8 Rate for Excavation to Locate Existing House Connections
 
The rates for excavations to locate the existing polyethylene pipes and ferrules for house connections shall be per linear metre given in the relevant Schedule of Prices (Bills of Quantities). The rate shall also include the preparation of drawings and sketches showing the locations of the existing house connection lines including the position of ferrules on the distribution lines and existing consumer water meter, tanks and pumps.
 
34. Exhumation, Reconditioning and Dumping of Pipes and Acces sories
 
The unit rate for exhumation shall include excavation, dewatering, recovery of pipes and fittings, cleaning of pipes and fittings by means of brush for initial inspection and backfilling of 「t enches and plugging off any D.I. o「 A.C. lines left in the ground as directed by the ADDC/ENGINEER. Whenever these excavations are made in the existing and/or proposed roads the backfilling shall be made with thoroughly compacted material approved by the ADDC/ENGINEER to the grade level of the road.
 
The unit rate for recond 幾 ionin g shall include but not be limited to loading/unloading, packing and stacking at site stores, cleaning by means of brush, inspection of material, supply and application of coating/liningmaterial, sand blasting of material as directed by ADDC/ENGINEER
 
The unit rate for transportation of rejected pipeline materials to a Municipality approved dump site or other designated site shall include but not be limited to loading and unloading, costs related to obtaining permission of dumping on the dump site or any other designated site.
 
The unit rate for transportation of surplus o 「 exhumed pipeline materials to ADDC stores and/or ADDC approved site or othe 「 designated area shall include but not be limited to loading and unloading, prepa 「 ation for inspection, double handling, costs related to obtaining permission of dumping on the designated dump site or any other site.
 
The unit rates for collection and transportation to site ADDC free issued D.I. pipeline materials or other materials/accessoriesshall  include, but not be limited  to, loading  and unloading, multiple handling, packing and stacking, transportation to and from Contracto'rs workshop/store, cleaning by means of brush, inspection of material. The rates shall also include supply and application of coating/lining material for repairing/touch-up work upto max. 25% of the total working length/surface area of D.I. pipes and fittings and total area of other materials and accessories.
 
The quantities fo 「 the above mentioned unit rates shall be measured according to the working lengths (for example face to face dimensions for flanged valves).
 
35. Safeguarding of Materials
 
The TENDERER shall allow for all costs involved in safeguarding materials in the ground du 「 ing the period after construction and before the Provisiona l Acceptance Certification. All costs incurred in respect of insurance, secu 「 ity, fencing, lighting, watchman and such like shall be CONTRACTOR's responsib小ty, including for replacement of any materials damaged
 
36. Additional Works Due to Existing Pipework
 
The rates for the WORKS shall include for any costs incurred while liasing with the Operation and Maintenance and Field Services Sections of the ADDC in order to shut down existing live pipelines to carry out the WORKS.
 
37. Alternative Methods of Construction
 
The Schedule of Prices (Bills of Quantities) and drawings are based on an acceptable technical solution to the necessary works. The TENDERER shall price the WORKS in accordance with the specified details but he may also propose alternative details. For such alternatives a fully detailed and priced desc「iption of the work shall be incorporated with his Tende「
 
38. Provisional/Alternative Items
 
Certain items listed in the Bills of Quantities are identified as "開ovisional"or "Alternative" items. It is to be understood that these items may or may not be required to be carried out and shall require the written instruction of the ADDC/ENGINEER before being carried out. The non-utilisation of these items shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the CONTRACT value. The TENDERER shall enter prices o「 rates against these Provisional Items in accordance with other clauses of these preambles. All "Provisiona"l items shall be priced, extended and taken to the 間 evant summary for inclusion in the total price for the purpose of bid evaluations. For "Alternative" items, prices shall be mentioned in brackets, but it shall not be considered for inclusion in the totals; only the prices of the base item shall be considered for inclusion in the totals.
 
39. Rates Analysis
 
Upon request of the ADDC/ENGINEER, the TENDERER/CONTRACTOR shall produce a detailed analysis of any or all of his tendered and other rates within two working days  of  being  so requested. The rates inserted by the CONTRACTOR for the different items in the respective Schedule of Prices shall be used as basis for any additions/deletions of the respective items.
 
The CONTRACTOR shall, when directed by ADDC/ENGINEER, submit detailed supplementary schedules  breaking down  the rates for composite  units of wo「ks in the Schedules of Prices into their component elements in such detail as shall be required by ADDC/ENGINEER.
 
40. Cad   Drawings  & Word Processing  for  Specifications and Documents
 
Unless otherwise approved by ADDC/ENGINEERdrawings shall be prepared in AutoCAD drafting system conformable to ADDC GIS System in accordance with specifications. The cost items for as-built  drawings  shall  include  the  cost  of  required  prints,  transpa「encies  and  computer floppy diske ttes/CD for the same as detailed in the Schedule of Prices (Bills of Quantities).
 
The Operation and Maintenance Manual, Record Books, etc. shall be prepared as maximum as possible on MS Word or similar computer word processing
 
41. Pipeline Connection I Discinnection
 
The rate for connections / disconnections includes for additional excavations, dewatering, backfilling,  required  additional  working  hours, multiple  cuttings and  multiple  connections  in  any configuration on main and branch lines including removal of pipes, fittings, valves, flow meters, accessories etc., and transport to store, installation of pipes, fittings, valves, flow meters, accessories etc., and all associated works for each tie in point to the new pipeline
 
Pipeline connection / Disconnection shall include the items listed below:
 
The rates for these works shall include for any costs incurred in supporting/liaising with the Operations and Maintenance section of ADDC in order to temporarily shutdown or trial shutdown and carry out the Connection I Disconnection works to DI, HOPE, CS or AC pipelines.
 
In all cases the rates shall include for all costs associated with meeting the requirements of ADDC, Operation and Maintenance section of ADDC in respectof shutdown procedures and any restrictvi e timing for shutdown of pipelines.
 
The rate shall include the p「ov閣 on of lights, generator and any facility「equired for necessary works outside normal working hours.
 
The rates shall include for the provision of additional dewatering pumps and protected sump pits for the rapid removal of water during draining of the existing pipelines at the location of dewatering points.
 
The pipeline sizes mentioned in BOQ are for the main pipeline.
 
42. Construction, Installation and Commissioning of Above Ground Temporary Cs Pipeline
 
Construction of temporary above ground CS pipeline shall include for installation of all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces, blank flanges, .. 舍 etc), construction of all concrete supports,  fixing  clamps, pipe cutting, welding, fabrication, including detailed design, preparation of detailed construction drawings, method statements, protection of existing  services, provision of bank  guarantee (if required), safety measures,  additional working
 
hours,  connection/disconnection,   dewatering,   pressure  testing  and  disinfection  of constructed
tempo 「 ary pipeline to successfully commission the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
43. Construction, Installation and Commissioning of Underground Temporary CS Pipeline
 
Construction of temporary underground CS pipeline shall include fo 「 installationof all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces , blank flanges, ...etc), construction of road crossings, pipe protections excavation, backfilling, fixing clamps, pipe cutting, welding,  fabrication,  including  detailed  design,  preparation  of  detailed  construction  drawings, method statements, protection of existing services, provision of  bank  guarantee  (if  required}, safety measures, additional working hours, connection/disconnection, dewatering, pressure testing and disinfection of cons 「t ucted temporary pipeline to successfully  commission  the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
44. Removal/Dismantling and Transportation of Temporary Carbon Steel Pipeline
 
The rates and prices shall include for dismantling, removing and transportation of temporary above ground/undergroundpipes, fittings , valves and all accessories installed for the tempo「ary pipeline including any excavation, backfilling, reinstating of trenches, roads, parking and green areas, connections/disconnection,sdewatering, required additional working hours, multiple cutting, welding, handling, multi transportation, cleaning, repairing and painting where needed, and transportation of material to construction STAGE location within the project area, ADDC store and/or any other location within Abu Dhabi Island assigned by ADDC/ENGINEERas per the project plan and staging construction schedule approved by ADDC/ENGINEER to successfully complete the project scope indicated in the TENDER.
 
The payments for the CONTRACTOR will be equal  installments  for  each  STAGE  as per the project plan and staging construction schedule approved by ADDC/ENGINEER. Payments to the CONTRACTOR  for each stage shall be made only afte「 the successful commissioning of the new permanent waterline  of the intended STAGE.  The final/balance  payment  will be only made after the complete transportation of all materials used for the temporary WORKS to ADDC Store or any other location indicated by ADDC/ENGINEER within Abu Dhabi Island . All materials should be approved by ADDC/ENGINEERafte 「 inspection. The CONTRACTOR shall consider all necessary cleaning ,  repairing,  refurbishment  and  painting  of  the  materials  to  meet  ADDC/ENGINEER approval requirements.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
PROJECT: Planning and
Development of Master Plan Project No.:
Infrastructure (MPIC) for Training Summary 1 of 1
Village I Al Hafar Region
 
 
SUMMARY SHEET
 
BILL NO. DESCRIPTION AMOUNT (DH)
 
1 SITE WORK AND PRELIMINARIES
 
 
2 ROADWORKS
 
 
3 ELECTRICAL WORKS
 
 
4 TELECOM DUCTING WORKS
 
 
5 SECURITY DUCTING WORKS
 
 
6 WATERWORKS
 
 
7 STORM WATER WORKS
 
 
8 SEWERAGE WORKS
 
 
9 IRRIGATION WORKS
 
 
10 LANDSCAPING WORKS
 
 
GRAND TOTAL OHS.
 
 
GRAND TOTAL (IN WORDS):
 
 
N__O__T_E_·_
Preamble to Bill of Quantities/Scheduleof Prices is a part of this specification and should be considered with this document
 
PROJECT
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
DAY WORK SCHEDULE (DW)
 
1) Labou「
 
2) Material
 
3) Plant
 
 
PROJECT: Planning and Development of Master Plan & Infrastructure (MPIC) for T「 aining Village / Al Hafar Region
Project No.· PPC/ Day Works Plot No.
P2 PAGE NO.
 
1 of 2
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
1.01. IPART 1 · LABOURER
 
 
1.01. 1  !Labour, non-skilled
 
1.01. 2 ILabour, semi-skilled (Assisting tradesman)
 
Hour Hour
 
1.01. 3   ILabour,   semi-skilled  (Operating  light power  operated
mechanical plant vis . rammers, concrete
breakers.) I   Hou r
 
 
1.01.  4  ISurveyor
 
1.01. 5  !Chain man
 
1.01. 6  !Carpenter
 
1.01.  7   ICarpenter's Mate
 
1.01. 8 !Trade man (Working with tools)
 
1.01.  9   IConcrete finisher
 
1.01. 10 ISteel bar bender or fixer
 
1.01. 11 IWelder or burner (Where not included with Plant)
 
1.01.  12 IBlacksmith
 
1.01. 13 IBlacksmith's mate
 
1.01. 14 IElectrician
 
1.01. 15 IElectrician's mate
 
1.01. 16 IF仆ter (Not engaged on plant maintenance)
 
1.01. 17 IFitter's mate
 
Hour
 
Hou「Hour Hour Hour Hour Hour Hour Hour
Hou「Hour Hour Hour Hour
 
1.01. 18 IPlumbe 「
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engine 「e
 
DAYWORK  RATES
No work carried out on a day basis will be measured unless, before starting wo 歡 the Contractor  has obtained the written approval of the Engineer
 
2.02 IPART 2·MATERIAL
 
2.02  1  !Water, brackish Imp. Gals.
 
2.02 2   !Water , fresh Imp. Gals.
 
 
2.02  3   !Portland cement  ,  sulphate resisting portland  (with bags) 6 ton loads (metric tons)
 
2.02 4 !Reinforcing steel mild steel complying with Section V , Concrete Works (metric tons)
 
2.02 5 IPVC waterstop, complying with Section V, Concrete Works
 
2.02 6   IPreformed joint filler, 1.2cm thick, as specified I L.M
 
2.02 7   !Steel angles ,   tees,  channel sections   and plates not exceeding  6mm thickness,  (galvanised) complying with! Tons Section XII, Metal Works (metric tons
 
2.02 8   !Ditto, not exceeding 15mm thick I Tons
 
 
2.02 9   !Timber in planking and strutting ,  not exceeding 5cm thick (5cu. metre loads)
 
2.02 10 IDitto, exceeding 15cm thick (5cu. meter loads)
 
2.02 11 IExtra over timbe「 in planking and strutting left in place
 
2.02 12 !Timber in sawn formwork lining
 
2.02 13 !Lined formwork for surface texture specifiedtreatment as
 
2.02 14 IK-140 concrete delivered on site
 
2.02 15 IK-250 concrete delivered on site
 
2.02  16 IBorrow materia,l load bearing
 
2.02 17 IBorrow material non-load bearing
 
2.02 18 IRigid polyvinylchloride (PVC) conduit, 10cm d舊
 
2.02 19 IDitto, 15cm dia
 
DAYWORK RATES
No work carried out on a day basis will be measured unless , before starting wo 水 the Contractor has obtained the written approval of the Engineer
 
 
2.02 20 IDitto, 20cm dia
 
2.02 21 IPerforated Polyvinyl chloride (PVC) pipe wrapped with filter fabric, 10cm dia.
 
2.2 22 IKerb paint
 
Total CARRIED  FORWARD
 
Day Works
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 DA YWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor has obtained the written approval of the Engineer
 
 
 
3.03. 10 IConcrete mixer (5.0 m 叮
 
3.03. 11 IConcrete prams
 
3.03. 12 IConcrete hand trucks
 
3.03. 13 IConcrete finisher, mechanical
 
3.03. 14 IConcrete vibrator, petrol or electric, with stinger CRANES (PETROL OR DIESEL)
3.03.  15 IMobile road type (10 ton)
 
3.03. 16 I D八to (20-ton) - Dragline
 
Hour Hour Hour Hour Hour
 
Hour Hour
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 17 IDitto (50-ton)
 
3.03. 18 IDitto {150-ton)
 
3.03. 19 ICrane bucket (attachment) (under 1 m叮
 
3.03. 20 IDitto (5 m叮
 
3.03. 21 ICrane mounted on truck (20 ton)
 
 EXCAVATORS
 
Hour Hour Hour Hour Hour
 
 
3.03. 22 IMechanical, diesel, face shovels, skimmers, drag- lines or back - acters with single equipment
(Maker's rated capacity 0.5 m3) I  Hour
 
3.03. 23 IDitto {Maker's rated capacity 1.0 m3) I Hour
 
3.03. 24 IDitto (Maker's rated capacity 2.0 m3} I  Hour
 
GENERATING  SETS (Petrol or Diesel)
 
 
3.03.  25 IGenerating sets, complete (3 kVA)
 
3.03. 26 IDitto (10 kVA)
 
3.03. 27 IDitto (15 kVA)
 
GRADERS
 
3.03. 28 IBulldozer complete with bull or angling blade (Equivalent to Caterpillar D4)
 
3.03. 29 IBulldozer (Equivalent to Caterpilla「 06)
 
3.03. 30 IBulldozer complete with bull or angling blade (equivalent to Caterpillar 0 8)
 
3.03. 31 !Tractor type with heavy ripper (Equivalent to Caterpillar DSK/No8)
 
3.03. 32 ITrack-Type Loader , 1.15 m 3 bu c ket (Equivalent to Caterpillar 941 B)
 
3.03. 33 IWheel loader (Equivalentto Caterpillar 966)
 
DAYWORK RATES
No work earned out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 34 IDitto, 1.90 - 2.48 m3 bucket (Equivalent to Caterpillar 977 L)
 
3.03. 35 IWheel tractor-scraper, struck, capacity 16 m3 (Equivalent to Caterpillar 631 D)
 
3.03. 36 IDitto, 24.5 m3 (Equivalent to Caterpillar651 B)
 
3.03. 37 IMotor grader, flywheel h.p.-125 (Equivalent to Caterpillar 651 B)
 
3.03.  38 IDitto, h.p.-150 (Equivalent  to Caterpillar 140 G)
 
3.03. 39 IWheel loader, bucket range 1.15 -1.34 m3 (Equivalent to Caterpillar 920)
 
3.03. 40 IDitto, 3.45 - 4.20 m'(Equivalent to Caterpillar980B) RAMMERS  MECHANICAL
3.03.  41 IMechanical, power rammer
 
3.03.  42 ICompactor, (Equivalent to Caterpillar 816)
 
3.03. 43 ICompactor, vibratory type, (5000 cpm)
 
3.03. 44 IPump (submersible 2" to 6") RQLLERS (Petrol or Diesel Driven)
3.03. 45 IRubber tyre, (25-ton)
 
3.03. 46 ISteel roller, under 5 tons
 
3.03. 47 IDitto, over 5 tons
 
3.03. 48 IDouble drum sheep foot roller with tract rammer
3.03. 49 ICompactor, plate type TRUCKS  (Petrol  or Diesel)
 
 
Hour
 
 
Hour Hour
 
Hour Hour
 
Hour Hour
 
 
Hour Hour Hour Hour
 
 
Hour
Hour Hour
Hour _
Hour  
FOR ENDER 0, L V
PA .
 
3.03. 50 ILand rover or pick-up
 
3.03.  51 IPick-up (3 ton - long bed)
 
3.03. 52 IVan or similar utility vehicle (10-ton)
 
Hour Hour Hour
 
2 2 OCT 2012
.-. . ...一,
TE  OOiN M.E. td.
 
Total CARRIED FORWARD
 
Day Works
 
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 53 IDumper (1 m叮
 
3.03.  54 IDumper (4 m3)
 
3.03. 55 IDumper (8 m 叮
 
3.03. 56 IDumper (20 m 叮
 
3.03. 57 IDumper (30 m 叮
 
3.03. 58 ISelf-propelled water sprayer (1000 gal.) (including water)
 
3.03. 59 IWater tanker (3000 gal.)
 
3.03. 60 IWater tanker (5000 gal.)
 
3.03. 61 IUtility truck with 3-ton hoist
 
 MISCELLANEOUS
 
3.03. 62 IDumpy level, staff and ancillary equipment
 
3.03. 63 ITheodolite, staff and ancillary equipment
 
Hour Hour Hour Hour Hour
 
Hour Hour Hour Hour
 
 
Hour Hour
 
3.03.  64 IOxy-acetylene cutting and welding sets inclusive of oxygen and acetylene (excluding underwater
equipment) I   Hour
 
 
3.03. 65 IElectric welding set , 300 amp. including electrodes for single operator
 
3.03. 66 IDewatering equipment including pump, hoses, well points, earth drilling auger, etc. Dewaters up to 50 s.m.
 
 
Total CARRIED  FORWARD
 
Day Works
上海翻譯公司完成工程類英文翻譯

世聯(lián)翻譯-讓世界自由溝通!專業(yè)的全球語言翻譯供應(yīng)商,上海翻譯公司專業(yè)品牌。絲路沿線56種語言一站式翻譯與技術(shù)解決方案,專業(yè)英語翻譯、日語翻譯等文檔翻譯、同傳口譯、視頻翻譯、出國外派服務(wù),加速您的全球交付。 世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達(dá)流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達(dá)質(zhì)量得到很大提升”

    華東建筑設(shè)計(jì)研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動(dòng)器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強(qiáng),翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)�!�

    諾達(dá)思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時(shí)翻譯質(zhì)量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實(shí)在不敢恭維,所以當(dāng)我認(rèn)識(shí)劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長期合作合同�!�

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實(shí)到位,體現(xiàn)了非常高的專業(yè)性�!�

    南洋商業(yè)銀行

  • “與我公司對接的世聯(lián)翻譯客服經(jīng)理,可以及時(shí)對我們的要求進(jìn)行反饋,也會(huì)盡量滿足我們臨時(shí)緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價(jià)、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)�!�

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強(qiáng),涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對完工資料質(zhì)量的抽查中,我司因?yàn)槎砦姆g質(zhì)量過關(guān)而受到了好評�!�

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經(jīng)理工作認(rèn)真踏實(shí),特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強(qiáng)的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場的同聲傳譯都得到了我公司和合作伙伴的充分肯定�!�

    西馬遠(yuǎn)東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動(dòng)了我。不僅譯件質(zhì)量好,交稿時(shí)間及時(shí),還能在我司資金周轉(zhuǎn)緊張時(shí)給予體諒�!�

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長期合作關(guān)系,這家公司報(bào)價(jià)合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認(rèn)可。”

    北京世博達(dá)科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達(dá)流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非�?�、后期服務(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長久合作,名副其實(shí),值得信賴�!�

    北京塞特雷特科技有限公司

  • “針對我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對我們提出的要求都落實(shí)到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可。”

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項(xiàng)目報(bào)備材料。在經(jīng)過對各個(gè)翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意�!�

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達(dá)落實(shí),準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項(xiàng)目進(jìn)行了幾次詳細(xì)的會(huì)談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達(dá)成了很好的共識(shí)。對貴公司的服務(wù)給予好評!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對此次緬甸語訪談翻譯項(xiàng)目非常滿意,世聯(lián)在充分了解我司項(xiàng)目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文�!�

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時(shí)的完成我們交給的翻譯工作�?蛻艚�(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝。”

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項(xiàng)目與你們相識(shí)乃至建立友誼,你們報(bào)價(jià)合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請?jiān)试S我們借此機(jī)會(huì)向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時(shí),中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實(shí)于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯(cuò)�!�

    TNC大自然保護(hù)協(xié)會(huì)

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象�!�

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作�!�

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項(xiàng)目要求時(shí)間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時(shí)間完成任務(wù)。使我們在世博會(huì)俄羅斯館日活動(dòng)中準(zhǔn)備充足,并受到一致好評�!�

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項(xiàng)目,翻譯過程客戶隨時(shí)查看中途稿,并且與客戶溝通術(shù)語方面的知識(shí),能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量�!�

    日工建機(jī)(北京)國際進(jìn)出口有限公司

尤物波多野结依无码大黄片| 俄罗斯aaaaa特级毛片| 国产精品剧情一区二区av| 久久精品无码亚日韩免费影视观看中文| 99亚洲视频网站| 亚洲午夜AV无码成人福利| 国产不卡免费在线视频| 久久精品亚瑟全部免费观看| 亚洲一日韩中文字暮AV| 免费无码a∨片在线观看| 国国产精品V欧美精品∨日韩| 日韩一区二区三区四区在线播放| 成人国产精品视频| 久久精品99无色码中文字幕| 久久久免费丁香五月| 一区二区三区无码在线| 懂色午夜一区二区三区| 色偷偷AV永久无码精品无码| 国产网友自拍视频| 蘑菇成品人app下载| 草莓视频污污污版下载| 好硬好湿好大再深一点动态图| 亚洲毛片精品二区| 国产亚洲乱码无码www| 亚洲性爱A不卡| 亚洲精品欧美综合久久| 日韩欧美国产手机在线观看| 午夜精品影视网热门电影全集免费播放在线观看 | 久久大屁股白浆一区二区| 美女动态三级在线| 日韩乱女乱妇熟女熟妇av| av无码av高潮av喷吹免费| 精品国产午夜肉伦伦影院| 国产成人AV一区二区三区| 北条麻妃青青久久av| 日韩殴无码中文字幕| 欧美激情自拍偷拍另类| 国产成人无码精品久久久亚洲精品人成无码中文毛片 | 九九热最新国产视频| 国产热无码手机版| 亚洲一级a无码毛片中文国产| 缅甸恐怖网站lomando| 99久久久囯产亚洲精品观看| 国产黄片大全| 日韩精品一区国产偷窥在线| 日韩三级久久| 毛片一区在线播放| 日韩欧美一级成人片免费| 亚洲一区二区一区| 又大又粗又爽国产色欲AV| 欧美亚洲国产中文另类在线观看| 日韩高清一区二区第50页| 亚洲日本韩国成人在线视频| 美女欧美一区二区| 婷庭九月天综合水蜜桃| 超级碰97直线国产免费公开| 91成人精品亚洲高清在线观看 | 免费无码AV片在线观看sm| 一级婬片一级视频| 国产激情一区二区三区成人麻豆| 裸体美女十八禁久久精品| 婷婷六月天激情| 久久午夜青青草原影院| 国产私人尤物无码不卡| 高清人妻无码中文字幕谷本多| 欧美亚州国产精品| 极品人妻videos人妻| 欧美日韩国产激情另类| 国产一级黄aa爽| 性欧美亚洲第一综合天堂另类专| 日韩亚欧无码人妻免费| 欧美第27页网站在线观看| 好爽快点我受不了了视频| 日本中文字幕视频一区欧美激情 | 一级二区在线观看国内精品三级| 国产精品电影不卡无码| 国产αV无码日韩αV无码网站 | 超97视频在线免费观看| 亚洲精品成人一二三区| 国产乱人伦偷精品视频???| 日产棈品一区到六区免费| 益日韩欧群交P片内射中文| 人妻出差精油按摩被中出| 亚洲av无码网站yw尤物| 麻豆精品国产一级| 国产成人在线看片| 无码熟妇一区二区| 国产第一页草草影院ccyy| 亚洲视频在线观看污污的黄 | 亚洲精品无码在线桃色| 国产区沙发午睡系列| 国产刺激一女多男一区二区| 国产午夜福利精品一区二区久久| 在线观看免费人成视频色9| 日本免码va在线看| 成·人免费午夜无码不卡| 牛牛色婷婷在线视频播放| 白洁老师国产麻豆片| 色就色综合偷拍区欧美| 国产欧美va欧美va在观看| 在线观看免费综合亚洲| (愛妃精選)免费无码毛片一区二区| 色就色综合偷拍区欧美| 大香蕉久久综合在| 婷婷深爱亚洲五月| 日本无码一区AⅤ二三区超碰| 色婷婷综合在线视频| 99精品國產高清一區二區三區香蕉| 亚洲永久精品ww47 91一区| 精品妇人妻视在线视频| 电影a区三区四区男人| 亚洲AV片在线观看高清小说| 久久国产精品15色老板| 欧美日韩精选在线观看| 青青青国产免费手机视频在线观看 | 189国产亚洲精品视频第1页| 国产经典无码在线免费看| 日本黄线在线视频免费看| 成人久久久一区二区| 女生奖励自己隐私越狠越安全好| 91精品无码专区免费| 99精品無碼人妻一區二區三區| 影音先锋国产精品天堂| 亚洲欧美另类久久| 中文精品影视日本| 久久人人爽人人澡人人高潮AV| 亚洲三区欧美一区二区在线| a级片在线免费播放| 1024手机在线看片| 国产精品素人亚洲国产| 亚洲综合无码一区二区三区四区| 缅甸恐怖网站lomando| 亚洲三级无码经典三级| 麻豆国产AV超爽| 亚洲中文无码成人网| 中国熟妇色欧美老妇多毛| 国产内地刺激性精品毛片 | 女式开襟游泳衣免费| 亚州中文字幕不卡影院 | 国产精品综合久久| 亚洲āv无码专区在线播放中文| 夜夜操天天爽| 国产激情一区二区三区成人麻豆| 国语自产拍在线观看99网| 免费黄色成年网站| 一级黄片免费1999| 叶玉卿被揉到高潮下不了床| 国内精品久久久久AV福利秒拍| 欧美午夜在线观看免费完整版 | 成人欧美视频免费看黄黄| 中文字幕无码一区二区乱码| 色综合精品视频在线| 国产偷窥成熟女精品视频| 色就色综合偷拍区欧美| 国产特级全黄一级97毛片电影| 榴莲APP下载汅网站进入官网| 成人亚洲色欲色一欲| 黄色成人在线播放| 欧美性爱首页| 欧洲aⅴ无码片一区二区三区| 99re66热这里只有精品66| 黄色一级毛片在线| 2021最新在线无码视频| 91精品国产高潮久久久久| 99久久久国产免费观看精品| 亚洲欧美一区电影| 成人性做爰aaa片免费看不忠| 免费黄色资源| 国产精品日产精品久久| 色情无码WWW视频无码区| 九九爱WWW无码人成| 亚洲欧美中文李幕高清在线| 夜夜添无码试看一区| 1024手机在线看片| 亚洲欧美中文日韩v在线在线观看 91精品国产高清一区二区三密臀 欧美日韩国产三级久久 | 亚洲一区二区一区| 亚洲高清无码操逼视频| 婷婷伊人久久大香线蕉AV| 99在线免费观看黄片| 国产ā v中文字幕乱码| 亚洲麻豆精品久久久| 久久艹这里只有精品| aⅴ色综合久久天堂av色综合| 日日噜噜噜夜夜爽狠狠视频| 色秀视频在线WWW色| 亚洲中文字幕一区二区三区在线91| 国产激烈刺激网站免费观看| 美女乳头阴道搞鸡巴视频| 伊人不卡字幕久久| 超碰真人在线| 动漫播放在线国产成人 | 久久九九精品视频| 国产精品无码一区二区四区免费| 国产激情福利| 亚洲黄片账号免费| 成人a一级毛片免费看视频| 久久久久中文字幕1区| 狠狠躁天天躁无码中文幕| 亚洲欧美日产国产视频| 国产精品99国产精品久久gif| 贵州少妇一级毛片| 91精品无码4k岛国| 韩国三级在线| 成人无码av一区二区三区| 色婷婷久久精品网| 最近最中文字幕视频 | 无码中文字幕aⅴ免费费放| 亞洲國產精品不卡在線電影| 国产黄色在线网站| 精品日韩久久一区| 成人黄片视频免费在线观看| 成人综合在线视频免费观看完整版 | 美女欧美一区二区| 亚洲福利在线视频| 久久精品日产第一区高清版| 久久精品αⅴ无码中文字字幕不卡| 一区二区三区av免费| 欧美精品v日韩精品v| 无码不卡毛片视频免费播放| 久久精品丰满人妻99| 狼群影院中文字幕| 亚洲欧美日韩制服综合| 好了AV第四综合无码久久| 亚洲黄片账号免费| 国产一区二区三区在线观看色网站| 日韩精品国产一区国产二区| 国产精品美女久久久浪潮?v| 国产国产乱熟女视频网站| metart精品白嫩的asspics| 波多野结衣午夜福利| 久久精品aⅴ无码| 欧美激情一区精品| 在线观看午夜国产精品| 午夜福利在线观看不卡| 亚洲精品国产成人影片在线观看| 国产精品久久成年人免费视频| 少妇人妻偷人精品毛片免费√| 国产免费女明星色视频| 亚洲av成人精品日韩在线播放| 国产精品无码天堂2021| 欧美嘿咻嘿咻视频免费| 久久免费视频777| 久久久精品一区二区藌桃| 亚洲精品视频中的话| 网红久久精品一区二区| 正在精品视频第一页| 中文字幕一区二区三区免费大片| 黄片视频免费国产| 国产精品亚洲精品91| 国产黄色一级片在线观看无码高清 | 国产高清av大屁股免费看| 一区二区三区无码精久久| 亚洲日本韩国成人在线视频 | 欧美日韩精选在线观看| 免费夫妻生活片av| 日本加勒比麻豆亚洲精品| 秋霞久久女婷五月综合色啪| 国产亚洲综合秋霞影院国产| 国产精品99欧美在线一区二区| 日韩在线视频中文一区二区视频综合 | 94人妻喷水视频在线| 黄色a级视频免费播放| 91香蕉视频国产免费下载| 亚洲一日韩中文字暮AV| 久久精品日产第一区高清版| 国产羞羞视屏在线观看| 99精品欧美一区二区蜜桃美图| 中国捆绑女裸绳艺视频| 国产欧美91在线| 亚州中文字幕不卡影院| 午夜久久无码成人免费AV| 欧美日韩三级在线观看| 日日狠狠伊人久久| 欧美一区二区三区18禁| 超碰成人在线91| 无码一级午夜福利区久久浪潮av| 电影天堂免费在线观看| 免费在线亚洲| 草莓视频污污污版下载| 亚洲国产1区2区3区| 亚洲色图国产无码| 377p欧洲日本亚洲大胆噜噜| 视频一区亚洲自拍最新国产精品亚洲| 午夜精品福利91| 欧美三级直播美女视频在线观看| 怡红院免费的全部视频国产a| 国产三级片在线观看网站| 四虎国产在线| 久久久久国色aV免费软件| 日韩国产欧美日韩一区二区久久| 亚洲成a∨人片在线观看无码好看| 精品唯美系列最新在线视频| 亚洲丝袜在线观看| 午夜在线不卡精品国产| 久久久久久av无码专区| 91精品國產免費久久國語蜜臀| 99久久99久久久精品| 免费观看又色又刺激的视频| 99re66热这里只有精品66| 亚洲综合另类色区色偷偷TXT| 色情无码WWW视频无码区| 狠狠躁天天躁无码中文幕| 自慰在线观看18p| 497799欧洲版的国产suv| 国产无遮挡又黄又爽在线观看| 9191精品国产免费久久国语| 看全色黄大色大片免费久黄久| 国产女生自慰a级毛片| 国产精品免费播放器大全| 亚洲一区二区三区网站观看 | 国产欧美精品一区二区粉嫩| 中文字幕有码无码人妻?V蜜桃| 免费在线亚洲| 日韩视频 中文字幕在线看| 午夜国产精品福利影院| 好男人社区www神马| 车子越颠进入的更深h| 一级少妇精品视频一区二区| 久久免费视频8| 最近最新的日本中文字幕| 在线观看xxxx国产| 日本黄线在线视频免费看| 欧美巨大激情久久久| 国产精品视频毛片| 日韩欧美女破处视频免费观赏| 国产成人欧美综合在线观看| 人妻丰满妇岳av无码区HD | 丰满少妇猛烈进入无码| 人成午夜日本乱码伦视频亚洲| 欧美视频第2页在线视频| 制服丝袜美腿 AV影院| 国产第一页草草影院ccyy| 中国捆绑女裸绳艺视频| 日韩av三级在线免费观看| 99RE8国产这里只有精品| 免费电影AV网站| 亚洲精品无码av国模| 拔萝卜免费观看高清视频下载| jk制服白丝喷水视频开放| 国产精品素人亚洲国产| 欧美一区二区久久精品| 狠狠色丁香婷婷综合久久网站| 在线观看精品成人综合视频| 人成午夜日本乱码伦视频亚洲| 亚洲成Av人片乱码色午夜在线| 国产乱人视频在线免费观看| 午夜网站永久在线观看| 国产一二一成人观看| 精品99视频国产免费尤物| 大又大粗又爽又黄少妇毛片视频 | 欧美一级aa大片免费看视频| 99精品又大又粗又硬少妇毛片| 国产另类欧美自拍日韩综合| 一区二区成人免费网站大全| 国产福利影视一二三区导航| 亚洲?v无码国产精品色午夜| 一色屋精品无码免费视频| 国产精品美女在线免费| 国产精品va在线观看my| 亚洲成α人V欧美综合天堂| 天堂av在线观看免费| 成年女人喷潮视频免费观看| 拔萝卜免费观看高清视频下载| 男人咬奶边做好爽免费视频| 色欲洲av无码精品国产午夜亚色| 国产国产成人久久精品杨幂| 女人被男人桶| 国产黄色一级片在线观看无码高清| 久久夜色精品国产亚洲| 欧美一级aa大片免费看视频 | 曰本av无码免费不卡| 亚洲成色av网站午夜影视| 老师和学生边上课边做h| 国产av无码变态另类专区| 成人片在线观看亚洲欧美| mmuu55首页 日本系列| 欧美一区二区在线播放免费播放| 好大好硬好深好爽视频h| 蜜柚影院AV免费观看| 黑人又粗又大XXX精品| 久久156精品视频| 完整版av片永久免费| 亚洲国产午夜精品一区二区| 亚州中文字幕| 亚洲AV乱码一区二区三区按摩..| 日韩A∨无码综合久久五月| 亚洲AV乱码一区二区三区按摩..| 被男狂揉吃奶胸高潮视频在线观看 | 91久久成人亚洲精品观看| 亚洲中文字幕第一页adc| 精品亚洲国产aⅴ在线| A级国产乱理伦片喂奶| 色婷婷精品国产黑人一区二区三区 | 日韩中文字幕欧美亚洲第一区| 一级aa免费视频毛片| 亚洲国产激情小说视频| 日本精品在线免费观看| 成人精品aaa亚洲丝袜在线观看| 国产一二一成人观看| 欧美嘿咻嘿咻视频免费| 妓女妓女一区二区三区在线| 中国熟妇乱子hdsex粗| 亚洲色拍国产另类| 精品黄色国产在线观看| 成人做爰视频www爽爽爽文章| 国产性爱一级生活视频片| 餐桌下狂c亲女高辣h文| 一级a爱片国产亚洲精品| 亚洲免费视频免费观看| 成人片在线观看亚洲欧美| 久久久精品一区二区藌桃| 欧美性受XXXX黑人猛交视频| 老司机午夜精品99久久免费| 国产又爽又黄免费网站| 在ktv上班被客人吃奶头| 理论片在线免费观看| 日韩欧美一卡二区| 亚洲va欧美a国产va综合| 日日噜噜噜夜夜爽狠狠视频| 日产一区二区三区精品视频 | 欧美一级欧美一级在线观看| 日本一区二区三区作爱视频| 日韩欧美国产免费一二三区| 国产精品视频免费看人鲁| 丰满多毛xXXⅩ精品视频| 男人扒开女人双腿猛进女人| 日本久久东京热午夜| 国产品国语在线不卡| 久久久亚洲av无码精品色午夜 | 五月天丁香色| 午夜久久无码成人免费AV | 日日摸夜夜添无码无码a∨| 亚洲男男激情videos高清| 欧美精品VIDEOSEX极品| 国产视频亚洲精品| 91在线无码精品秘比基尼| 成人欧美一区二区三区在线观看| 无遮挡美女18禁免费啪啪| 99天天操天天做天天| 又大又粗又爽国产色欲AV| 国产亚洲欧美ai在线看片| 亚洲中文字幕一区二区三区在线91 | 亚洲av永久无码精品视色影视| 免费美女视频一区| 久久爽av鲁丝无码中文| 亚洲av永久无码精品视色影视| 国产网友自拍视频| 在线亚洲資源免費看| 亚洲高清国产拍精品青青草原| 精品91自产拍在线观看99re| 日韩精品中文字字幕有码专区| AV免费不卡国产在线观看| 亚洲精品成人国产| 美女扒开尿眼无遮挡免费视频| 国产成a人亚洲精v| 天天爽天天爽免费视频| 成人国产欧美日本精品久久麻豆| 四川少扫搡BBW搡BBBB| 欧美综合色网| av中文字幕不卡无码| 无码A∨高潮抽搐流白浆8MAV| 91视频欧美青青草| 国内精品视频天天在线观看| 樱桃视频草莓视频幸福宝| 日韩三级片免费观看| 成a人片免费在线观看| 亚洲精品国产专区在线| 国产成年男人裸j网站| 午夜亚洲国产理论片2020| 精性国产在线视频| 18禁止裸身美女动漫网站| 久久精品国产精品亚洲艾草| 久久久久免費精品視頻| 成在线人免费视频播放| 午夜精品人成在线观看| 精品免费一区二区爱| 日韩AAAA级无码专区免费| 国产精品美女在线免费| 怡红院免费的全部视频国产a| 午夜视频成在线人成在线人 | 无码av高潮抽搐流白浆在线 | 作爱激烈叫床视频| 国产欧美VA天堂在线观看视频下载 | 五月丁香色婷婷蜜桃| 男人咬奶边做好爽免费视频| 久久免费视频观看30秒| 韩国羞羞漫画无遮羞在线看| 国产精品电影不卡无码| 99亚洲视频网站| 久久精品囯產亞洲av麻豆色欲| 国产成 人 亚洲 综合| 亚洲欧美伊人久久| 电影a区三区四区男人| 亚洲无码模一级黄片| 菠萝菠萝蜜免费影视在线观看 | 特级毛片?级毛片在线播放| 亚洲电影激情五月激情| 自拍亚洲欧美另类动漫| 亚洲欧美日韩中文高清| 精品一区二区三区国产日韩| 国产免费人成视频不卡顿在线播放播| 久久久久中文字幕1区| 99ER这里只有精品视频8| 国产午夜视频免费观看| AV免费不卡国产在线观看 | 5x性社区免费视频播| 欧美sese尤物一区二区| 人妻丰满妇岳av无码区HD| 插曲免费的视频大全影视| 国产成人精品一二三区| 国产丰满老女人A片免费观看| 粉色视频免费观看下载| 亚洲日本乱码在线观看| 91视频污APP色版下载| 一级做a爱片高潮毛片| 国产无码喷水| 八戒影视大草原久久揄拍片| 欧美经典复古伦理在线| 免费av中文字幕| 一级曰本牲交视频| 男人和女人一起打扑克牌差差差痛游戏 | 成人做爰视频www爽爽爽文章 | 在线a亚洲v天堂网2018影| 亚洲成人激情在线观看| 国产超碰97老师人人看| 果冻国产精品麻豆成人av电影| 老司机午夜精品99久久免费| 青青青免费高清视频在线| 亚洲AV无码AV在线播放野外| 国产人与禽ZoZ0性伦69| 毛片一区在线播放| 欧美亚洲色综久久精品国产91| 亚洲色综合中文字幕在线| 懂色午夜一区二区三区| 久久电影午夜鲁丝片无码| 一级黄色毛片在观看| 日韩av手机在线观看不卡| 精品二区三区在线观看| 久久久精品午夜免费不卡91| 911精品國產91久久久久| 亚洲国产视频二区| 成年人视频久久免费| 妓女精品一区二区| 国产福利一区99| 成人午夜福利小视频 | 污视频在线免费观看| 果冻国产精品麻豆成人av电影| 污污视频免费网站| 歐美性一交激情視頻在線| 欧美日产国产成人免费点| 宝可梦沙奈朵口吐白色液体| 久久99热免费精品久久| 久久99视频丝袜爱| 日韩精品一级一区| 久久精品国产亚洲最新国产| 少妇中文字幕久久精品无码| 日韩国产精品99久久久久| 成人久久久一区二区| 了解最新国产精品视频一区二区三区经| 国产色精品vr一区区三区| 日本无遮挡h肉动漫在线观看| 久久综合综合久久?V在钱| 国产欧美亚洲精选视频| 91久久精品美女高潮| 中文字幕不卡乱偷在线| 人妻系列专区无码在线| 日本天堂成人在线视频| 在线一级国产大片| 久久99成人精一区二区三区| 黄色大片一级毛片视频| 性欧美亚洲第一综合天堂另类专| 最近在线中文字幕更新| 亚洲国产中文字幕在线视频| XVIDEOS免费人成视频网址 | 国产网友自拍视频| 国产一边做一边爱视频| 亚洲一日韩中文字暮AV| 最近的2019中文字幕7| 自慰在线观看18p| 午夜福利啪爽国产片精品| 少妇人妻一区二区视频| 狠狠干经典视频在线观看| 国产强上视频在线观看| 日韩国产精品一级毛片在线| 男女做爰大粗舒服小说| 久久图片视频小说| 国产高清乱码无卡女大生| 中美日韩三级毛片免费观看| 日韩 一国产一无码一日韩| 爱情岛免费视频论坛一路线| 国产成人真人片亚洲精品不卡| 亚洲一区日本在线| 超97视频在线免费观看| 久久综合第一页无码97| 性色aV一区二区三区红粉影视| 日韓歐美一區二區三區不卡| 97超碰国产精品| 国产污污视频在线观看| 亚洲日韩制服另类| 日韩欧美精品一区在线观看 | ..亚洲欧美日韩成人高清在线一区| 欧美成人午夜影院| 国产免费福利片在线视频| 99热国产这里只有精品99| 日本又色又爽又黄的网站免费| 轻轻色国产在线视频| 国产又爽又黄免费网站| 夜鲁夜鲁夜鲁高清免费看| 色婷婷亚洲综合五月| 亚洲性爱A不卡| 成人高清影院| 国产特黄色一级| 黑人巨大无码系列在线| 下载强漫画人物软件| 973午夜伦伦电影论片| 91成人午夜精品福利院| 最新无码国产在线视频2023| 免费在线播放无码黄色片| 亚洲高清国产拍精品青青草原| 999免费观看四虎精品国产| 欧美一区二区三区福利网| 蜜桃臀一区二区三区四区| 国产福利一区二区在线观看| a狠狠久久蜜臀婷色中文网 | 日本中文精品在线观看| 日韩色欲人妻无码精品av| 图片区小说区另类春色蜜芽| 白丝紧致爆乳自慰喷水玩具动态图| 欧洲熟妇精品视频在线成视频| 欧美激情四射一区二区在线| 欧美视频日韩视频国产视频| 成人自拍视频在线观看| 久久 久久 国内精品亚洲| 国产福利一区99| 亚洲欧美日韩另类色图 | 成人免费在线观看高清视频| 在线观看精品一区二区三区 | 18禁止裸身美女动漫网站| 另类亚洲欧美精品综合| 青青草国产成人久久网| 久久精品国产亚洲?V无码偷窥| 黄色视频在线观看视频网站| 激情五月久久国色天香一区| 欧美日韩精品区久久久| a级毛片高清免费视频在线| 在线观看麻豆| av无码免费久久久精品| 日韩一区二区三区视频在线| 亚洲成a人无码无卡| 成人高清毛片视频| 久热国产精品视频一区二区| 国产影视乱伦三级| 在线观看精品一区二区三区| 欧美成人香蕉在线视频| 亚洲精品成人?v在线| 无限看片的视频大全免费下载| 亚洲tv日韩tv国产tv无码综合| 免费在线观看精品亚洲| 亚洲av午夜成人片精品电影| 97视频人人做人人爱免费体验| 我的漂亮女房东完整版在线韩剧| 无码人妻热线精品视频| 亚洲精品国产成人影片在线观看 | 一区二区人人在线| 麻豆视频传媒APP| 国产精品视频色拍拍2021| 欧美另类癖好手机在线网| 久久黄色美女小视频网站| 性XXXXX欧美老肥婆多毛| 亚洲欲色欲色XXXXX在线小说 | 最新全集网电影免费在线看| 国产精品色片免费| 国产特黄a三级三级三级| 亚洲成人激情在线观看| 91麻豆一区二区在线观看| 亚洲日本韩国成人在线视频| 天天做天天干中文字幕| 无码人妻热线精品视频| 曰本av无码免费不卡| 波多野结衣的AⅤ一区二区三区| 欧美日韩中字在线| 四虎sihu新版影院亞洲精品| jizz一区二区在线观看| 国产亚洲桃色| 色网日本在线观看| 激情影院免费视频试看| 国产高清av大屁股免费看| 一区二区三区在线观看欧美| 亚洲影视AV一二三| 天堂a亚洲国产色久在线| 柳州少妇无码一区| 国产福利午夜九二网免费| 91麻豆极品99精品国产综合久久久 | 高清人妻无码中文字幕谷本多| 国产欧美日韩丝袜高跟鞋 | 国产av一区二区三区香焦| 午夜精品一区二区三区在线成人 | 青青青国产女精品视频| mmuu55首页 日本系列| 大家都能看的免费毛片视频| 国产男女嘿咻视频在线| 91精品网站天堂系列在线播放 | 欧美牲交?欧美牲交| 韩国美女一级毛片| 欧美日韩一二区在线观看| 国产免看一级a一片成人AⅤ| 在线观看91精品国产2021| 色婷婷综合在线视频| 亚洲AⅤ成人综合网伊人APP| 在线观看免费的AV网址| 男女视频诱惑国产在线观看| av资源久久免费下载| 色夜av网午夜福利片| 91精品一区国产高清在线GIF| 欧美精品青青久久久久久久久久久 | 成人黄片视频免费在线观看| 四川少扫搡BBW搡BBBB| 草莓茄子丝瓜樱桃鸭脖绿巨人| 日韩人妻无码视频18岁| 国产精品第页婷| 年轻的朋友3完整版在线观看| xxxx欧美丰满大屁股| 亚洲第一aⅴ天堂在线观看| 日本中文精品在线观看| 奇米777四色欧美精品| 中国捆绑女裸绳艺视频| 久久er热这里只有国产中文精品| 成年人视频久久免费| 国产欧美VA天堂在线观看视频下载 | 91香蕉app下载汅api免费网站无限看 | 久久国产午夜精品免费一区二区 | 四虎在线最新地址99| 亚洲av永久无码偷拍另类| 欧美人成一本免费观看视频| 不卡一卡二卡在线视频黄色大片免费在线观看| 国产露脸无码a区久久蘑菇| 婷婷综合六月| 欧美疯狂性受xxxxx另类| 手机在线看片你懂得| zayou亚洲福利一区| 精品一区二区性爱| 中文又粗又大又硬毛 | 黄色美女网站av| heyzo无码综合亚洲精品| 歐美性一交激情視頻在線| 亚洲影库日韩久久久| 男女视频网站一区二区三区免费| 18勿看免费大片1000拍拍| 免费精品美女久久久久久久久久 | ▓草莓视频在线观看▓| 18进黄址app最新版| 丝袜足脚交91精品| 天天噜夜夜噜狠狠噜| 大屁股人妻女教师撅着屁股| 免费黄色成年网站| 中文字幕一区二区高清精品久久久| 91在线无码精品秘比基尼| 欧美黑人又粗又大又硬免费视频| 五月开心中文版在线观看| 惠民福利久久精品国产亚洲7777| 在线观看无码精品秘?日本| 日韩精品一区国产偷窥在线| 免费一级毛片在线播放放| a免费在线观看| 亚洲AV无码AV在线播放野外| 国产亚洲乱码无码www| 黄色成人香蕉视频网站| 欧美一区二区免费播放| 狼友小视频在线观看| 497799欧洲版的国产suv| 人妻有码中文字幕在线不卡| 人妻中文字幕无碼在线| 久久午夜片电影鲁丝午夜精品 | 最近在线中文字幕更新| 中文字幕亚州欧美专区| 国产欧美久久一区| 免費在線一級片| 911永久在线网站| 97一区二区在线播放| 欧美97人人爱人人干| 亚洲欧美精品日韩片| 中国毛片在线观看| 欧洲 亚洲 中日在线观看| 国产羞羞视屏在线观看| 亚洲av中文aⅤ无码av电影| 双乳被快递员揉搓玩弄在线播放| 日韩亚洲色欲色一欲www| 中文字幕乱码一区二区三区蜜桃成熟时| 亚洲色大全在线视频观看| 大奶子视频一区二区| 高清免费人成在线视频观看| 国产 亚洲 欧美 另类中文| 91丨熟女丨丰满熟女| 三级片网站国产欧美日韩| 精品卡通动漫在线观看视频一区| 国产一级婬片免费播放电影 | 午夜精品福利91| 中文字幕无码乱人妻| 国产成人综合在线女婷五月99播放| 国产乱子伦午夜精品视频| 国产经典无码在线免费看| 丝袜在线视频网站| 手机在线看片你懂得 | 国产日韩欧美一区二区四区| k频道国产网红欧美在线视频| 综合亚洲国产日韩欧美在线| 色天堂在线观看视频 | 老外黑人一级毛片| 影视久久夜色国产精品噜噜噜 | 狠狠久久久精品| 成全影视大全| 中文字幕久久精品有码综合网| 亚洲a精品无码毛片色欲av| 成人无码视频在线一区| 91精品国产成人久久久久久| 色综合久久综合中文综合网| 亚洲综合第九十八页| 黄色亚洲黄色日韩| 国产狼友精品视频网| 久久精品人妻中文系列| 一二三四在线色网视频观看社区| 手机在线看片你懂得| 国产天堂在线一区二区三区| 国产精品玖玖玖玖影院| 超碰97人人模人人爽人喝| 久久久久久免费免费麻辣| 黄色一级视频网站| 免费在线播放无码黄色片| 日韩欧美亚洲国产精品| (愛妃精選)免费无码毛片一区二区 | 网红久久精品一区二区| 网页在线观看无码高清| 亚洲AV乱码一区二区三区按摩..| 少妇一区二区三区精品| 中文字幕日本a√在线| 久久精品国产精品亚洲艾草 | 插曲免费的视频大全影视| 少妇人妻偷人精品毛片免费√ | 国产又粗又长又爽黄又硬视频| av蓝导航精品导航| 亚洲高清无码操逼视频| 中文字幕一二区二三| 伊人久久大香线蕉?v男同 | 国产刺激一女多男一区二区| yw尤物久久国产综合| 亚洲色欧美日韩在线影院| 少妇大胆瓣开下部自慰| 久久这里有精品视品| 亚洲一区二区三区日韩国产| 又黄又爽国产免费网站在线观看| 十八禁爽爽爽无遮挡在线观看网站| 精品三级66在线播放| 91精品一区国产高清在线GIF| 中文字幕av免费看网站| 中文字幕美谷朱里精品久久| 国产人与禽ZoZ0性伦69| 亚洲av永久无码偷拍另类| 九九爱WWW无码人成| 欧美丁香五月激情网| 黄人成a动漫片免费网站| 日韩免费不卡视频1| 午夜精品九九九九99蜜桃| 日韩毛片午夜在线观看| 精品香蕉在线观看国产首页| 91影视在线观看| 久久亚洲精品少妇| 国产成人欧美综合在线观看| 在线观看不卡一区二区三区 | 中文字幕久久久久一区| 免费一级黄色网络网站欧美| 亚洲午夜电影欧美整片sss| 成年无码?v片在线无码精品| 亚洲色图一区二区的| 超97视频在线免费观看| 欧美亚洲国产手机在线dvd| 搡老女人老妇老熟女50ⅹxxx| 国产乱子伦在线观看免费| 一二三四在线看日本高清| 亚洲最新av无码中文字幕一区| 日本免码va在线看| 91香蕉app下载汅api免费网站无限看| 亚洲一级视频中文字幕在线播放| 日韩欧美偷拍精品一区| 免费+午夜+亚洲| 在线亚洲資源免費看| 亚洲婷婷影院女优视频网站| 色婷婷国产精品欧美毛片| 国产精品二区在线| 国产农民工简易窝棚嫖妓精彩对白| 1024在线看片你懂的| 国产大尺度无遮挡在线观看| 97精品日韩永久性无码| 欧美日韩三级在线观看| 精品一区二区性爱| 国产亚洲1卡二卡三卡4卡| 久久久888精品视频| 亚洲全部无码中文字幕| 在线观看亚洲欧美一区二区三区| 久久精品丰满人妻99| 樱桃视频草莓视频幸福宝| 69精品久久日日躁夜夜躁| 国语自产精彩视频在线视频| 精品无码久久久久国产| 日韩亚欧无码人妻免费| 97精品一区二区视频观看| 亚洲中文字幕不卡无码| 免费综合日本中文| 益日韩欧群交P片内射中文| 黄色美女免费| 三级大黄片污软件| 欧美老熟妇夜夜爽| 久久国产福利一区二区三区| 免费黄色小说视频| 91精品国产综合久久久亚洲日韩 | 亚洲乱码国产乱码精品精乡村| 国产一级二级三级免费| 麻豆成人在线观看视频| 欧美污污污久久久久久| 香蕉视频免费在线观看| 成人欧美精品久久久久影院| 国产成人av一区二区三区中文精品 | 国产高清无码精品一区| 日本不卡免费新一二三区3| 高清免费人成在线视频观看| 亚洲国产在线精品国自产拍影院| 亚洲色图在线视频| 精品人妻少妇aⅴ免费狠狠| 美女裸体视频在线无卡黄色免费网站| 美女美女一区二区三区| 国产特级全黄一级97毛片电影| 一区二区三区午夜片| 欧美三级日韩国产在线观看| 秋霞久久女婷五月综合色啪| 精品国产日韩在线观看| 国产—久久香蕉国产线看观看 | 伊人丁香五月在线视频| 国产免费观看久久黄AV片| 国产超清无码 片内射免费| 久久精品亚瑟全部免费观看| 91精品无码4k岛国| 嫩模自慰一区二区三区动漫| 欧美日韩精人妻品一区| 欧美男人与动牲交zooz| 精品久久久久久人妻黑人| 成人精品aaa亚洲丝袜在线观看| 黑人又粗又大XXX精品| 亚洲中文字幕丁香婷婷| 日本免费一区二区三区看片| 中文字幕中文乱码51精品| a级片在线免费播放| 国产成a人亚洲精品无码性色 | 欧美XXXXX高潮抽搐免费播放观看等 | 中国熟妇乱子hdsex粗| 午夜精品影视网热门电影全集免费播放在线观看 | 亚洲国产欧洲韩国高清专区| 第三视频午夜福利| 免费啪视频在线观看视频日本| 爱情岛免费视频论坛一路线| 99热在线观看免费精品| 日韩在线欧美在线一区二区三区| 污网站免费观看污网站| 日韩产品和欧美产品的区别| 入禽太深在线色网视频5| 最新国产成人精品区在线观看| 国产日韩欧美啪啪色| 一级毛片av一区| 国产成人福利在线视频播放下载| 国产精品亚洲日韩高清资源| 16处破外女出血视频在线观看| 日本一区二区三区作爱视频| 贵州少妇一级毛片| 日韩精品成人蜜桃| 欧美视频日韩视频国产视频| 精品动漫中文字幕一区| 日韩精品一区二区亚洲A ∨| 黄色视频在线观看视频网站| 瑟瑟视频在线观看| 夜夜欢av一区二区三区| 久久精品波多野结衣中文字幕| 日韓福利一區| 久久精品99无色码中文字幕| 亚洲欧州国产综合不卡在线免费视频| 另类亚洲欧美精品综合| 品人妻VA出轨中文字幕| 最近在线中文字幕更新| 午夜在线不卡精品国产| 国产又黄又骚又猛欧美| 大陆日韩欧美成人| 一进一出把女子干的全身抽搐| 国产成视频在线观看| 精品99视频国产免费尤物| 欧美综合在线观看日本| 国产经典网红福利视频网站| 亚洲午夜精品第一区二区| good电影在线观看三级中文| 夜鲁夜鲁夜鲁高清免费看| 日韓歐美一區二區三區不卡| 男人天堂日韩精品| 国产欧美一区二区日本加勒比| 午夜福利精品视频| 四虎www成人影院观看| 插我一区二区在线观看| 麻豆国产91视频| 久久99人妻精品涩爱噜噜噜蜜臀| 手机在线日本视频| 亚洲av无码网站yw尤物| 日韩黄色高清视频| 91精品无码4k岛国| 伊人不卡字幕久久| 欧美成人专区| 入禽太深在线色网视频5| yw尤物久久国产综合 | 午夜老司机福利日韩视频在线高清| 一区二区三区.在线看| 国产精品综合久久| 国产成人真人片亚洲精品不卡| 牛牛色婷婷在线视频播放| 又大又粗又爽国产色欲AV| 一个人免费视频在线观看高清直播| 欧美亚洲少妇高清| 韩日中文无码在线视屏| 久久精品亚瑟全部免费观看 | 国产无遮挡又黄又爽在线观看| 国产高清无码精品一区| 秋霞在线手机国产在线| 亚洲电影激情五月激情| 亚洲精品免费影院| yy111111少妇影院无码光屁股| 国产精品视频毛片| 亚洲aⅴ女人的天堂在线观看| 国产精品白丝久久久| 女银行员暴行办公室| 惠民福利久久精品国产亚洲7777| 一区二区毛片视频免费看 | 亚洲 综合 视频 一区| 在线免费观看a级片| 东京热无码一区| 久久亚洲欧美精品一| 男女无遮挡动态图| 国产美女白浆视频一区二区| 污污视频免费网站| 亚洲视频在线观看污污的黄| 亚洲国产1区2区3区| 在线亚洲理论午夜AV大片| 久久久综合精品一区二区三区无码| 人人干在线视频| 性欧美一区二区三区在线观看| av无码三级片在线播放| 看中国免费毛片视频| 亚洲无遮挡一级精品视频| 欧美日韩精选在线观看| 精品亚洲国产aⅴ在线| 一级毛片大学生九九精品视频| 日本无码一区AⅤ二三区超碰| 韩日中文无码在线视屏| 又大又黄又爽的成人免费视频| 黄色片久久美女啊啊啊内色| 日韩欧美人妻之中文字幕| 欧美日产国产成人免费点| 双性调教结婚每日淫训| AV乱码一区二区三区| 亚洲制服精品一区二区三区| 欧美猛少妇色xxxx久久久久| 99精品一区二区无码吞精视频| 色呦呦网站免费| 欲乱人妻少妇邻居+毛片| 久久99国产精品二区不卡| 精品国产成a人片在线观看| 成在人线Aⅴ免费观看| 精品一区二区三区播放| 午夜网站黄色在线观看免费完整高清观看 | 国产成人久久99| 亚洲成a∨人片在线观看无码好看| 偷自拍亚洲综合在线| 国产亚洲精品系列| 亚洲AV日韩在线一区二区三区| 波多野吉衣在线A片免费播放| 阿牛影院在线观看视频| 亚洲αv无码不卡一区二区三区| 色影音先锋色资源网站| 最近在线中文字幕更新| 国产在线高清无码视频| 草草影院欧美三级日本 | 亚洲欧美日韩爱爱| a级高清毛片视频免费观看| 亚洲综合另类色区色偷偷TXT| 久久久亚洲av无码精品色午夜| 国内精品久久久久久婷婷| 国产无遮挡裸体免费视频| 成人高清毛片视频| 午夜精品福利波多野结衣| 日日摸夜夜添无码无码a∨| 国产成a人亚洲精品无码性色| 午夜福利精品无码福利| 亚洲中久无码永久在线观看同| 又黄无遮挡无码的免费视频| 亚洲国产精品久久一线APP| 欧美va亚洲天堂网| 国产免费午夜福利在线播放92| 亚洲色图中文在线| 欧美顶级AⅤ高清视频| 制服丝袜物喷水亚洲综合精品| 91久久成人亚洲精品观看| 国产人妻高清国产拍精品| 男人的天堂亚洲一区二区无码| 免费视频成人欧美精品影院| 日韩三级久久| 中文一区二区视频成人二区| v影院一区二区三区自产不卡视频| 久久AV无码三级美式禁忌| 精子射入几天可以着床| 午夜老司机福利日韩视频在线高清| 亚洲AV乱码一区二区三区| yy111111少妇影院无码光屁股| 成人高清毛片视频| 免费观看丰满少妇一级毛片| 国产精品玖玖玖玖影院| 精品无码一区二区三区少妇97| 中文字幕乱码亚洲影视亚洲日本va午夜 | 影音先锋+高潮+痉挛| 色婷婷狠狠干| 亚洲国产自久久婷婷| 国产黄色一级片在线观看无码高清 | 亚洲av永久无码偷拍另类| 青青草中国三级片| 一区二区三区四区在线免费观看| 久久久久免費精品視頻| 在线观看亚洲欧美一区二区三区| 菠萝菠萝蜜免费影视在线观看| 搡老女人老妇老熟女50ⅹxxx | 久久九九精品视频| 1024大香蕉手机看片| 日韩精品一级一区| 久久久一二三区精品| 欧洲另类综合| 污视频网站日本免费| 欧美日在线观看视频| 久久综合成人精品亚洲另类欧美| 国产高清吹潮免费视频| 国产激情福利| 久久亚洲欧美精品一| 国产免费女明星色视频| 国产精品va在线观看my| 三级毛片在线观看av| 国产精品美女在线免费| 中文字幕中文乱码51精品| 亚洲国产成人高清一区在线| 国产在线视频一卡| 国产丰满老女人A片免费观看| 在线播放日韩国产欧美| 污污视频免费网站| 91国内精品视频在线观看| 无遮挡又黄又刺激在线视频| mmuu55首页 日本系列| 隔壁放荡的人妻在线看中文| AV网站国产大全| 婷婷五月深爱五月| 在线亚洲无码| 久久夜色精品国产亚洲| ac网站不卡免费在线观看| 老师和学生边上课边做h| 亚洲最新av无码中文字幕一区| 二区三区中文字幕在线观看| 尊龙凯时·(中国区)人生就是搏! 亚洲乱码国产乱码精品精乡村 | 久久国产精品一国产精| a毛片免费全部播放吃| 极品精品伊人国产| 四虎sihu新版影院亞洲精品| 成人A免费播放网站| 亚洲全部无码中文字幕| 亚洲丝袜在线观看| 亚洲欧美日韩爱爱| 医院人妻隔着帘子被中出| 亚洲精品欧美综合久久| 婷婷六月天激情| 另类小说图片区日本久久大视频| 玩弄粉嫩少妇高潮出白浆AⅤ| 国产高清乱码无卡女大生| 亚洲日韩国产精品久久久综合网| 影音先锋国产在线| 日韩国产亚洲欧美有码| 最近最新的日本中文字幕| av在线免费观看高清| 91精品国产自产老师啪| 扒开老女人p大荫蒂warmth| 欧美va亚洲天堂网| 美女扒开尿眼无遮挡免费视频| ddd54手机免费看| 操小孩污视频在线免费观看| 99视频在线看观免费| 污污视频免费网站| 啪一啪鲁一鲁2019在线视频| 曰本av无码免费不卡| 国产成人AV一区二区三区| 久久婷宗和五月天网拍| 国产国产人精品视频69| 亚洲欧美日韩综合第一| 91香蕉app下载汅api免费网站无限看| 亚洲AV无码AV在线播放野外| 一级曰本牲交视频| k频道一区国产在线观看| 韩国国产一级片在线观看| 97人人超人人超碰超国产| AV东京热影音先锋| 无码AV中文字幕| 餐桌下狂c亲女高辣h文| 久久久7777888精品| 久久66热偷产精品| 婷婷丁香性爱| 久久久久久人妻| 日韩一区二区三区视频在线| 婷庭九月天综合水蜜桃| 电影《色戒》未删减版| 日本免码va在线看| 亚洲AV无码国产精品色午夜久久| ..亚洲欧美日韩成人高清在线一区| 高清国产在线观看| 欧美激情在线播放一区二区 | 国产小视频一区二区三区中文字幕在线播放| 丁香七月婷婷| 日本免码va在线看| 草久在线视频在线观| 欧洲亚洲成人精品| 一区二区三区国产V欧美| 国产制服在线视频| 神马午夜久久久久久| 国产精品黄在线观看免费网站| 超碰97人人天天夜夜| 国产成人精品在线不卡| 4se人人视频在线| 亚洲AV综合色区无码区| 免费AV一区二区三区3ATV| 国产一区二区三区三州在线观看| 欧美二区视频在线观看| 欧美性爱首页| 亚洲精品私拍国产福利88| 高清无码免费不卡视频| 国产成人久久99| 男人你懂的在线观看视频| 亚洲精品一区二区三区不| 欧美综合在线观看日本| 精品亚洲精品在线观看| 欧洲亚洲日本大胆色噜噜| 色欲悠久久久久综合区欧美亚洲日韩| 亚洲性爱视频网站一级看片 | 美女裸体视频在线无卡黄色免费网站| 中文日无码在线观看| 欧美成人自拍| 国产免看一级a一片成人AⅤ | 18禁止裸身美女动漫网站| 黄色视频在线观看视频网站| 亚洲国产精品第一二三区| 后入式肏大屁股眼免费视频| 国产超级va在线观看视频| 国产无码不卡视频| 久久久一二三区精品| 国产亚洲国际精品福利| 亚洲三区欧美一区二区在线| 18观看免费永久视频| 97久久久人妻一区精品| 久久国产这里只精品免费| 视频一区亚洲专区| 国产一国产精品免费播放| 中文字幕二区亚洲综合| 国产成人av麻豆精品| 精品国产午夜肉伦伦影院| 欧美国产直接看的精品A视频| 久久婷婷色中文字幕免费高清| 久久黄色片三级片黄色网址| 自拍欧美亚洲国产成人综合| 91久久成人亚洲精品观看| 日本加勒比麻豆亚洲精品| 榴莲APP下载汅网站进入官网| 奇米一区二区三区四区久久| 日韩AAA久久蜜桃AV| 亞洲一區二區三區免費觀看| 成人无码视频在线观看| 国产精品精品综合在线网址| 自拍亚洲欧美另类动漫| 亚洲欧洲国产韩国va在线| 91短视频在线观看污污污| 好大好硬好深好爽视频h| 午夜精品福利91| 粉色视频免费观看下载| 久久久久国色aV免费软件| 茄子短视频app在线观看| 国产超级无码一极毛片 | 樱花视频网站| 国内精品自线一区二区2021 | 女人19水真多免费毛片| 欧美巨大激情久久久| 欧美一级婬片A片无码专区野结衣| 91影视在线观看| 极品精品伊人国产| 奇米一区二区三区四区久久 | 国产成人合集在线播放| 人人色人人干人操| 亚洲手机在线成人| 中文精品影视日本| 国产日韩欧美啪啪色| 亚洲精品肉丝袜久久| 亚洲tv日韩tv国产tv无码综合| 熟女一区二区天天操夜夜操| 亚洲欧美另类久久| 亚洲国产精品久久一线APP| 中文一区二区视频成人二区| 爱情岛免费视频论坛一路线| 亚洲国产成人mv在线观看| 一级二区在线观看国内精品三级| 中文字幕亚洲无码色网视频| 国产精品66婷婷伊人五月| 三级片欧美在线| 91好色先生下载污| 黄色人成影院一级| 99精品無碼人妻一區二區三區| 色吧超碰97人妻| 曰木一级a级高清毛片| 亚洲日本一区亚洲影院| 免费视频成人欧美精品影院| 中文成人无码国产亚洲| av无码av高潮av喷吹免费 | 人妻夜夜爽天天爽4区| 午夜福利精品视频| 女人被添荫蒂潮喷视频| 张警官撞玻璃9分10秒| 亚洲第一天堂日韩| 色婷婷综合在线视频| 在线观看无码精品秘?日本| 在线观看免费综合亚洲| 国产亚洲精品A片1000| 三级大黄片污软件| 亚洲色综合中文字幕在线| 精品天天做天天爽夜夜爽人妻爽| 国产 亚洲 欧美 另类中文| 午夜福利在线观看不卡| 熟女一区二区天天操夜夜操| (愛妃精選)免费无码毛片一区二区| 国产片精品mv在线观看| 丁香亚洲综合五月天婷婷| 午夜亚洲亚洲精品福利| 丁香五月婷婷污视频在线观看| 女人十八毛片免费观| 免费国产一区二区8X| 精品二区三区在线观看| 亚洲国产欧美在线播放| 亚洲日韩av免费在线观看| 久久无码私人网站| 成人久久一区精品| 66j8午夜电影网| 欧美gαy男男激情1069| 人人干在线视频| 国产成人精品影院网站不卡| 久久成人精品免费国产片| 六十老妇性大啊使劲| 韩国午夜理论a三级在线观看| 偷拍亚洲综合二区| 18禁止裸身美女动漫网站| 国自产拍偷拍福利精品免费一| 欧美日本不卡一二三区| 久久人人爽人人爽av片| 在线观看国产高清a| 老师解开乳罩喂奶我脱她内| 制服丝袜美腿 AV影院| 日本免码va在线看| 偷拍女厕一区二区| 人妻日韩AV无码一区二区| 青娱乐精品视频在线免费观看 | 图片区电影区激情区小说区| 亚洲专区日韩中文在线 | 中文无码一区99xav| 日韩三级手机在线观看不卡| 96久久自偷自偷国产精品| 亚洲欧洲在线观看无码| 亚洲色图一区二区的| 久久精品99毛片免费| 调教.求饶乖腿打开h| 國產精品99久久| 日本中文字幕视频一区欧美激情 | 在线观看自拍无码综合| 日本一区二区三区在线视频观看免费| 久久无码āV中文出轨人妻| 艳妇荡乳欲伦2中文字幕| 日韩特黄精品一在线看| 国产精品丝袜亚洲熟女蜜月| 午夜老司机福利日韩视频在线高清| 亚洲第一aⅴ天堂在线观看| 免费萌白酱国产一区二区三区| 亚洲精品一区二区三区不| (愛妃)久久AV无码精品人妻出轨| 国产精品有码无码脛∨在线 | 国产乱子伦午夜精品视频| 精品一区二区性爱| 久久爽av鲁丝无码中文| 女式开襟游泳衣免费| 午夜精品人成在线观看| 欧美A级毛片免费播敢| 最新无码国产在线视频2023| 国模欢欢销魂全过程| 成人久久久一区二区| av中文字幕不卡无码| 免费av中文字幕| 国产原创剧情情欲放纵| 善良的嫂子高清播放完整版 | 浪潮国产精品久久久久?v浪潮| 国产麻豆成人传媒免费观看| 美腿丝袜诱惑一区2区| 亚洲AV综合色区无码区| 韩国羞羞漫画无遮羞在线看| 欧美亚洲国产另类在线| 一区二区毛片视频免费看| 日本免费无码高清色倩片| 夜鲁夜鲁夜鲁高清免费看| 91k国产在线观看尤物| 色小说色网视频| 亚洲精品视频中的话| 日本特黄特色大片免费在线观看| 三级毛片在线观看av| 欧美阿v高清资源在线| 欧美黄片十分钟不卡一区| 女佣的味道hd中字在线观看| 亚洲AⅤ成人综合网伊人APP| 国产制服在线视频| 欧美日韩中字在线| 久久伊人免费视频| 双乳被快递员揉搓玩弄在线播放 | 午夜精品人成在线观看| 欧美日本在线不卡二区| 国产精品综合久久| 激情丝袜美女视频1区| 青春草五月天婷婷欧美日韩| 成年人国产一级片| 無碼人妻豐滿熟婦精品區| 精品国产青草久久久久福利| 高清免费三级毛片| 绿巨人聚合app入口| 欧美阿v高清资源在线| 韩国午夜理论a三级在线观看| 亚洲丰满少妇色网视频网| 国产成人av国语在线| 激情在线日韩欧美日韩| 永久免费看黄| 高潮时奶水喷出来了| 男女视频诱惑国产在线观看| 久久婷婷色中文字幕免费高清| 亚洲AAA一级无费看| 精品综合久久久久久8888| 亚洲尤物永久无码AV毛片| 茄子短视频app在线观看| 1精品啪国产在线观看免费牛牛| 欧美A级毛片免费播敢| 欧洲精品高清无码一区二区三区| 日韩在线欧美在线一区二区三区 | 无码日韩做暖暖大全免费| 十八禁在线免费观看| 青青青精品大杳蕉| 男女做爰大粗舒服小说| 成人无码视频在线观看| 欧美日韩一区二区视频播放黑人粗 | 久久五月天影院| 无码不卡毛片视频免费播放| 国产一级大片免费视频| 日韩精品亚洲专区在线影院| 亚洲视频欧美在线专区| 快描人成app免费| 年轻的朋友3完整版在线观看| 国产人妻高清国产拍精品| 又黄又爽又硬网站| 丰满少妇猛烈进入无码| 亚洲国产自久久婷婷| 国产91九色在线| 网红久久精品一区二区| 911精品國產91久久久久| 亚洲乱码国产乱码精品精乡村| 午夜久久无码成人免费AV| 久久99国产精品精品国产同意| 亲近相奷对白中文字幕| 亚洲色图中文在线| 日韩亚洲色欲色一欲www| 久久九九精品视频| 亚洲成Av人片乱码色午夜在线| 亚洲āV电影天堂男人的天堂| 精品国产午夜肉伦伦影院| 无码国产精品一区二区蕉蕉免费式 | 欧美疯狂性受xxxxx另类| 国产毛片的高清视频| 亚洲欧洲在线观看无码| 日韩产品和欧美产品的区别| 色综合久久中文字幕无码色欲| av无码av高潮av喷吹免费| va在线看国产免| 欧美激情一区精品| 欧美日本在线不卡二区| 老司机午夜精品99久久免费| 成人自拍视频在线观看| 久久国产这里只精品免费| 国产一级普通话农村毛片| 国产一级国产一级在线观看| 精性国产在线视频| 夜夜操综合网| 99re66热这里只有精品66| 久久精品无码亚日韩免费影视观看中文 | (愛妃精選)免费无码毛片一区二区 | 一区二区成人免费网站大全| 日韩免费福利剧场| 久久综合老色鬼网站| 91久久久韩系亚洲| 又脱又摸下面激烈免费视频| 污污视频免费网站| 越南女子杂交内射BBWBBW| 国产精品喷水综合久久久| 性白俄罗斯高清xxxxx| 91影视在线观看| 女性喷液过程高清免费视频| 日本高潮少妇一区二区三区| 国内a级毛片免费观看| H片在线播放免费观看| 国产熟女精品视频国语| 欧美日韩高清不卡一区| 国产偷窥熟女精品| 无码人妻不卡久久一区二区 | 国产av亚洲v天堂av| 日韩久久精品一区二区| 好色先生日逼的视频| 日韩亚洲色欲色一欲www| 免费A级毛卡片不收费视频| 午夜色a大片在线观看免费| 久久99国产精品精品国产同意| 啦啦啦www在线观看免费视频动漫| 91精品国产一二三产区在线观看| 好色先生日逼的视频| 国产黄色在线观看.| 波多野吉衣在线A片免费播放| 大香蕉久久综合在| 在线免费观看国产视频| 色五月丁香五月综合五月橹| 毛片一区在线播放| 一区二区三区色网视频在线观看| 国产农民工简易窝棚嫖妓精彩对白 | 97人妻人人揉人人躁人人爽动漫| 高清国产美女在线观看| 精品一区二区三区国产日韩| 一区二区成人免费网站大全| 久久综合综合久久?V在钱 | 日韩欧美偷拍人妻丝袜第一页| 亚洲最新无码av网址| 亚洲午夜电影欧美整片sss| 国产av自拍播放| 亚洲精品视频中的话| 国产无遮挡又黄又爽在线观看| 欧洲黑白配一二三四区| 部长侵犯人妻一区二区三区| 巨粗进入警花哭喊求饶| 五月丁香婷婷成人网| 偷自拍亚洲综合在线| 欧美性生活视屏精品| 69国产成人精品午夜在线| 亚洲AV日韩在线一区二区三区| 精品亚洲成av人在线免播网站| 亚洲欧美精品国产电影| 免费网站看v片在线毛| 久久综合综合久久?V在钱| 黄色一级国产精品| 亚洲午夜无码电影| 亚洲精品性美腿丝袜电影| 日韩视频 中文字幕在线看| 97人妻人人揉人人躁人人爽动漫| 大地免费资源| 真实国产乱子伦对白在线播放| 国产人与禽ZoZ0性伦69| 日韩国产精品等最新内容! | 久久精品亚洲精品五月色| 在线国产视频一区二区三区| 欧美日韩一区二区三区一| 成人看片黄在线观看| jk制服白丝喷水视频开放| 午夜最新电影 | 性欧美亚洲第一综合天堂另类专| 99久久国产热无码精品免费久久精品A亚洲国产V高清不卡 | 无码gogo大胆啪啪艺术免费 | 欧美日韩成人精品第一区| 成人A免费播放网站| 日日插人人插天天插| 久久艹这里只有精品| 亚洲私人无码综合久久网| 精品区一区二在线观看| 精品区一区二在线观看| 轻轻色国产在线视频| 女人毛片免费看一分钟| 午夜网站黄色在线观看免费完整高清观看 | 婷婷综合在线视频精品| 189国产亚洲精品视频第1页| 国产精品v欧美| 毛片女人片毛片免费二区| 日韩欧美综合在线二区三区| 亚洲AV无码国产精品色午夜久久| 日韓三級免費看| 国产午夜一区二区在线观看m| 亚洲 欧洲 日产 专区| 午夜精品九九九九99蜜桃| 国产超碰97老师人人看| 国产亚洲精品精品在线精品| 亚洲av无码网站yw尤物| 国产亚洲精品A片1000| 暖暖www视频免费高清最新期| 日韩av中文无码人妻无码 | 国产黄色三级三级三级| 久久精品久久观看| 青青青国产女精品视频| 中文成人无码国产亚洲| 日韩精品毛片无码一区| 男女做爰大粗舒服小说| 亚洲婷婷影院女优视频网站| 久久大屁股白浆一区二区| 老熟女亂伦一区二区| 亚洲人妻久久无码| 国产精品AV毛片免费看观看| 亚洲成人激情在线观看| 日韩欧美综合在线二区三区| ?V无码小缝喷白浆在线观看| 成年人在线观看网站| 欧美一区日本二区| 歐美日韓一區二區視頻免費看| 韩日中文无码在线视屏| 欧美精品v日韩精品v| 秋霞在线手机国产在线| 国产成人福利在线视频播放下载| A级成人婬片免费看无码| 成在线人av免费无码高潮喷水| 亚洲影库日韩久久久| 茄子短视频app在线观看| 久久精品国产AⅤ无码| 99久久精品一区二区毛片下载 | 欧洲免费在线视频| 亚洲欧美日韩制服综合| 丰满爆乳无码专区线一区二区三区| 欧美猛少妇色xxxx久久久久| 麻豆视频传媒APP| 国产综合v亚洲欧美大片| 国产亚洲加勒比久久精品| 缅甸恐怖网站lomando| 成年人视频久久免费| 欧美日在线观看视频| 亚洲欧洲国产精品香蕉网 | 我的漂亮女房东完整版在线韩剧| 免费视频成人欧美精品影院| 人成在线免费观看亚洲| 在线观看亚洲精品视频| 100款禁用黄台网站小黄鸭| 日韩三级手机在线观看不卡| 理论片在线免费观看| 成人亚洲欧美在线观看| 国产激情一区二区三区成人麻豆 | 男生和女生在一起打牌的很痛的app| 亚洲黄色AV电影在线不卡| 国产成人综合亚洲国产vr| 美女黄又色高清视频免费| 玩弄粉嫩少妇高潮出白浆AⅤ| 柳州少妇无码一区| 了解最新国产精品视频一区二区三区经| 日韩毛片午夜在线观看| 在线观看免费国产一区二区| 亲亲发出吧唧吧唧的声音| 日本午夜在线视频| 狠狠躁狠狠躁东京热无码| 欧美一级黄色免费在线观看视频 | 377p欧洲日本亚洲大胆噜噜| 国产91九色在线| 欧美韩国亚洲精品综合a| 国产丰满老女人A片免费观看| 国产成人合集在线播放| 国产免费经典三级| 国产一国产精品免费播放| 欧美日韩精品区久久久| 欧美亚洲免费播放一区| 亚洲中文婷婷丁香五月天| 亞洲國產歐美在線觀看| 91无码久久国产线看观看hd| 国产免费观看久久黄AV片| 国产精品a久久久久| 国产成人av大片大片在线播放| 亚洲āV无码专区国产乱码不卡| 亚洲欧美变态| 亚洲日产精品一二三四区| 无码粉嫩小泬久久久| 日韩亚洲色欲色一欲www| 欧美中文日韩综合在线视频| 国产精品中文字幕一区二区三区视频| 作爱激烈叫床视频| 快描人成app免费| 国产成人午夜一级电影在线 | 一区二区三区人妻免费视频| 国产精品乱人伦丰满电影| 久久精品国产亚洲aⅤ麻豆图片| 国产真实迷奷系列在线看| AV乱码一区二区三区| 亚洲天堂在线观看完整版| 国内一区二区三免费视频| 曰木一级a级高清毛片| 日韩精品老熟女视频网站免费观看| 日本www成人网站在线观看| 好爽快点我受不了了视频| 狼友看视频的网站| 亚洲AⅤ成人综合网伊人APP| 亚洲Av人片另类| 久久大屁股白浆一区二区| 俄罗斯aaaaa特级毛片| 欧美顶级AⅤ高清视频| 无码在线视频免费| 麻豆视频传媒APP| 麻豆精品国产一级| 中文字幕一区二区高清精品久久久| 亚洲视频在线观看污污的黄| 国产亚洲精品成人| 欧美精品v日韩精品v| 极品精品伊人国产| 国产50部艳色禁片无码国产麻豆精品一区二区三区 | 美女视频黄频a免费高清不卡软件| 永久免费毛片久久99| 午夜福利在线观看不卡| 污网站免费观看污网站| 男人你懂的在线观看视频| 国产人妻高清国产拍精品| √天堂亚洲国产传媒在线观看| 日本中文精品在线观看| 国产福利午夜九二网免费| 亚洲人成aⅴ在线播放橙子| 成人无码视频在线观看| 青青青精品大杳蕉| 一女享受夫奴口舌伺候| 一区影院午夜福利擁有海量視資源久| jizz一区二区在线观看| 影音先锋国产精品天堂| 精品国产第一页动漫| 千金去SM体验馆被调教| 91香蕉视频黄版下载| 污软件在线观看软件| 一级婬片一级视频| 日韩精品熟女AA久久毛片| 人妻久久系列精品| 国产在线观看h尤| 二级黄色录像片免费播放| 毛片三级片在线免费观看| 夜夜高潮夜夜爽精品视频| 清纯唯美欧美综合第一页| 亚洲国产中文字幕在线视频| 国产欧美一区二区日本加勒比| 99国产精品视频一区二区69堂| 特级一级毛片视频免费观看| 思思热这里只有精品5| 欧美午夜久久精品另类| 精子射入几天可以着床| 成人网免费视频色呦呦| 天堂国产成人av在线| 久久久精品午夜免费不卡91| 国产精品女同久久久久电影院| 韩国午夜理论a三级在线观看| 国产精品中文一区二区三区| 亚洲av美女在线播放啊| 午夜精品人成在线观看| 国产精品一区二区久久国产抖音| 免费A级毛卡片不收费视频| 久久爽av鲁丝无码中文| 成人国产精品福利视频| av大片在线观看| 秋霞电影午夜伦免费观看| 欧美三级欧美成人高清www| 亚洲欧美日韩制服综合| 久久久免费丁香五月| 中文字幕无码138页| 亚洲午夜AV无码成人福利| 夫の目の前侵犯新婚人妻| 国产刺激精品专区av| 亚洲午夜久久免费| 亚洲国产99在线精品五区| 亚洲一级免费观看高清无码| 一区二区成人免费网站大全| 凹凸在线一区二区三区熟妇 | 内裤堵嘴app高清| 亚洲人成网址在线观看| 天天在线观看日韩免费AV| 做爰高潮a片视频35分钟| 国产精品男人在线播放| 草莓视频app下载18| 国产精品有码无码脛∨在线| 色噜噜中文网在线| 柳州少妇无码一区| 久久图片视频小说| 亚洲AV乱码一区二区三区按摩..| 餐桌下狂c亲女高辣h文| 一区二区三区午夜片| 茄子短视频app在线观看| 国产成人av国语在线| 国产不卡免费在线视频| 无遮挡18禁国产精品| 日韩精品一区国产偷窥在线| 亲近相奷对白中文字幕| 欧美a级片在线观免费观看| 亚洲av成人精品日韩在线播放| 91精品国产福利久久| 中文字幕无码亚洲视频| 日韓中文字幕無碼高清毛片| 超碰成人在线91| 精品国产v无码大片在| 曰本av无码免费不卡| 久久久精品2019中文字幕超碰| va在线看国产免| 杨幂喷水高潮在线观看视频| 大粗鸡巴久久久久| 欧美亚洲国产手机在线dvd| 日韩精品手机在线| 国产精品剧情一区二区av| 国产亚洲国际精品福利| 成人高清影院| 免费在线观看精品亚洲| 免费看美女无遮掩的软件| 2020国产成人精品视频网站| 国产簧片免费在线播放| 亚洲欧美一区电影| 99ER这里只有精品视频8 | 国产精品v欧美| 亚洲永久免费无码打屁股| 亚洲欧美一区二区三区69| 免费视频成人欧美精品影院| 日本丰满护士bbw| 伊人久久大香線蕉AV五月天| 久久久久久av无码专区| 中国无码在线观看| 女生奖励自己隐私越狠越安全好| 亚洲日韩AV无码中文| 497799欧洲版的国产suv| 亚洲国产香蕉视频欧美明星换脸| 亚洲丰满少妇色网视频网| 无码视频一区二区三区六区| 影音先锋+高潮+痉挛| 精品人妻中文无码久热丝袜| 了解最新精品国产拍拍拍无遮挡| 天堂成av午夜电影| AV无码免费1区2区3区| 久久免费视频8| 日韩欧美国产手机在线观看| 粉色视频免费观看下载| 中文又粗又大又硬毛| 国产精品无码天堂2021| 午夜亚洲亚洲精品福利| 在线观看精品一区二区三区 | 樱花视频网站| 久久综合网欧美色妞网| 日韓歐美一區二區三區不卡| 人妻回春按摩肏到中出| 国产精品青草婷婷| 国产精品有码无码脛∨在线 | 麻豆国产一区二区在线观看| 国产免费一级视频播放| 久久久久久无码精品国产小说| 国产欧美VA天堂在线观看视频下载| 国产三级片大全网| 国产精品99欧美在线一区二区| 奖励网站正能量www正能量| 女人用炮机高潮合集视频播放| 午夜精品一区二区三区在线成人| 亚洲无遮挡一级精品视频| 精品国产99国产精2021| 久久久久久a亚洲欧洲A v冫| 91在线无码精品秘比基尼 | 又大又粗又爽国产色欲AV| 日韓三級免費看| 大学生一级毛片全黄真无码| 亚洲综合精品二三区| 免费精品一区二区中文字幕| 欧洲免费在线视频| 欧美日亚洲黄色网站在线观看| 久久sese三级亚洲精彩| av无码av高潮av喷吹免费| 成人性视频欧美一区二区| 亚州中文字幕| 日韩A∨无码综合久久五月| 99爱免费视频在线观看禁| 免费在线播放无码黄色片| 日韩一区二区三区四区在线播放| 亚洲三级毛片一区二区| 日本丰满护士bbw| 成熟少妇av免费网站| 亚洲成人一区久久| 免费+无码+国产www| 亚洲 综合 视频 一区| 少妇无码AV无码专区在线| 日韩人妻熟精品久久无码少年阿宾| 在线亚洲資源免費看| 亚洲精品高清你懂的| 91情侣在线精品国产| 激情在线日韩欧美日韩| 国产中文自拍无码| 欧美日韩二区视频| 亚洲国产在线精品国自产拍影院| 久久五月天影院| 久久精品人妻中文系列葵司| 成人免费在线观看高清视频| 国产欧美AA一区二区三区视频| 手机在线观看的国产网站| 青草影院内射中出高潮| 亚洲一卡2卡三卡4卡127.0.0.1| 国产精品无码久久AV嫩| 国产一级婬片免费播放电影 | (愛妃)久久AV无码精品人妻出轨| 日韩人妻无码视频18岁| 欧美日韩电影码国产| 国产精品网站 夜色| 色综合久久中文字幕无码色欲| 日韩欧美国产免费一二三区| 天堂av在线观看免费| 国产又爽又黄免费网站| 麻豆国产91视频| 中文字幕新无码国产在线视频| 九九热精彩视频| 国产午夜福利精品理论片久久| 国产大尺度无遮挡在线观看 | 欧美激情xxxx孕妇| 国产性欧美疯狂猛交69hd| 亚洲爆乳av一区二区三区| 欧美成人专区| 91欧美激情一区二区三区成人日韩99久久综合狠狠综合久久 | 亚洲欧美中文李幕高清在线| 国产成视频在线观看| 国产精品美乳| 亚洲一品二品三品精区网站| 搡老女人老妇老熟女50ⅹxxx | 国产精品麻豆综合在线| 贵州少妇一级毛片| 欧美色图一区二区| 青青青国产免费手机视频在线观看| 亚洲青青草原男人的天堂| 91超级好看一区二区三区| 国产精品成人嫩草影院| 国产精品视频毛片| 亚洲婷婷影院女优视频网站| 国产香蕉久久精品免费| 亚洲av永久无码精品视色影视| 在线观看精品一区二区三区 | 欧洲亚洲国产综合精品| 日韩美女高清视频在线观看| 中文字幕乱交第9页| 国产美女露底激情视频| 国产精品成人嫩草影院| 韩国三级电影久久久| 亚洲AV无码AV在线播放野外| 日韓福利一區| 黄色一线免费高清在线视频16| 久久九九精品视频| 影音先锋+高潮+痉挛| 国产精品羞羞答答| 亚洲免费视频免费观看| 国产亚洲欧洲无码激情在线观看| 美女制服で視頻網站| 日本三级久久| 亚洲女人视在线| 无码A∨高潮抽搐流白浆8MAV| 99精品又大又粗又硬少妇毛片| 亚洲国产自久久婷婷| 亞洲歐美日韓中文字幕首頁 | 欧美黑人精品一区二区在线| 精品二区三区在线观看| 国产精品大白天新婚身材| 久久精品一区二区三区卡| 日韩免费不卡视频1| 国产精品有码无码脛∨在线| 国产激情在线91| 成人久久久一区二区| 久久66热偷产精品| 国产免费经典三级| 亚洲国产精品第一二三区| 日本中文字幕www| 色情无码WWW视频无码区| 国产香蕉久久精品免费| 欧美大尺度禁片露器官电影观看| 欧洲 亚洲 中日在线观看| 校花高潮抽搐冒白浆| 成熟少妇av免费网站| 日韩一区二区在线视频| ..亚洲欧美日韩成人高清在线一区| 中国熟妇色欧美老妇多毛| 国产成人福利在线观看视频| 丁香亚洲综合五月天婷婷| 亚洲麻豆精品久久久| 国产精品免费播放器大全| 网址你懂得国产精品| 自偷自偷自亚洲首页精品| 女人18毛片18A级水真多| 亚洲午夜福利精品一区| 黄色av网页地址一| 亚洲精品种子网站在线观看| 欧美精品第56页| 波多野结衣电影一区二区| 三级毛片高清一区| 精品国产AⅤ一区二区三区4区| 亚洲av无码不卡无码| 99热手机在线最新地址| 免费看美女无遮掩的软件| 91精品国产自产老师啪| 欧美日本在线不卡二区| 国产成a人亚洲精v| 午夜男女后插入在线免费| 日韩AAAA级无码专区免费| 五月天伊人久久| 久久五月天影院| 在线观看亚洲精品视频| 日本人妻最新在线中| 成人亚洲狠狠一二三四区| 粉色视频免费观看下载| 成人午夜福利小视频| 亚洲成人一区久久| 八戒影视大草原久久揄拍片 | 国产性欧美疯狂猛交69hd| 人妻系列专区无码在线| 丁香七月婷婷| 怡红院免费的全部视频国产a| 中文字幕av免费看网站| 免费国产成人无码学生妹| 欧美中文字幕网站免费| 被男狂揉吃奶胸高潮视频在线观看| 91久久精品国产免费一区| ▓草莓视频在线观看▓| 欧美一级视频高清片| 久久黄色高清视频。| 18勿看免费大片1000拍拍| 午夜久久无码成人免费AV | 在线免费观看国产视频| 国产精品大白天新婚身材| 久久九九精品视频| 无码AV中文字幕| 在线亚洲資源免費看| 亚洲一区二区三区aⅴ无码| 国产99热在线露出| 亚洲一级av无码中文字幕| 大学生一级毛片全黄真无码| 午夜视频成在线人成在线人| 中文字幕人妻毛片av| 亚洲人妻久久无码| 欧码无码久久久| 入禽太深在线色网视频5| 国产精品亚洲综合每日| 天堂网www天堂在线资源| 国产一区二区三区不卡在线| 婷庭九月天综合水蜜桃| 99尹人香蕉国产免费天天拍 | 中文字幕免费日韩中文中文| 日韩AⅤ在线免费观看| 91精品国产高清一区二区三密臀| 久久免费视频观看30秒| 欧美精品第56页| 色综合精品视频在线| 缅甸恐怖网站lomando| 日韩欧群交p片内射中文| 国产高清在线观看AV片| 国产性夜夜春夜夜爽1a片| 久久精品2021国产| v影院一区二区三区自产不卡视频| 日韩三级片免费观看| 日韩在线欧美观看| 亚洲日本欧洲综合| 亚洲国产永久视频免费看| 在线综合亚洲欧美成人影院| av在线免费观看高清| 十大禁止安装app软件入口免费| 亚洲欧美制服专区| 成人av免费网址在线观看| 国产精品第页婷| 久久黄色片三级片黄色网址| 亚洲一区二区三区网站观看| 国产成人合集在线播放| 久久艹这里只有精品| 91久久国语露脸精品国产| 老赵揉着粉嫩的双乳太舒服了秀婷| 日韩一区二区在线视频| 狠狠干2017欧美最新| 高清国产美女在线观看| 草莓视频app下载18| 午夜免费福利av| 国产高清色高清在线观看九在线视频 | 久久精品人妻一区二区三区一| 一区欧美激情桃花| 97人妻人人揉人人躁人人爽动漫| 91香蕉视频国产免费下载| 欧美国产第一区| 精品人妻少妇aⅴ免费狠狠| 欧美特黄三级又爽又粗| 波多野结衣午夜福利| 亚洲日韩成人在线| 动漫播放在线国产成人| 图片区小说区另类春色蜜芽| 欧美日韩aⅴ人妻| 樱桃视频草莓视频幸福宝| 久久国产精品一国产精| 国产精品无码久久A∨不卡| 歐美成人久久久| 欧美亚洲精品另类| 国产羞羞视屏在线观看| 东热亚洲狂野欧美| 亚洲αv无码不卡一区二区三区| 国产精品福利视频一区二区三区| 精品亚洲国产成人无码| 色欲悠久久久久综合区欧美亚洲日韩| 菠萝菠萝蜜免费影视在线观看 | 亚洲欧美日韩中文高清| 无码强姦精品一区二区| 在线亚洲欧美日韩国产| 无码粉嫩小泬久久久| 特级一级毛片视频免费观看| 99视频精品全部免费在线 | 最近最新中文字幕2018| 波多吉野一区二区三区av| 亚洲伊人成久久综合网| 日韩久久精品一区二区| 午夜免费一级av福利毛片| 欧美牲交?欧美牲交| 韩国羞羞漫画无遮羞在线看| 歐美性一交激情視頻在線| 国产午夜刺激视频一区二区| 中国国模无码AV| 色网日本在线观看| 免费无码AV片在线观看sm| 久久久综合视频一本| 国产好大好爽久久久久久久| 日本成a人片在线观看网站 | 国产成人AV一区二区三区| 精品黄色国产在线观看| 日日摸夜夜添无码无码a∨| 亚洲乱码国产乱码精品精乡村| 国产一级A一级裸体片| 国产一级a毛一级a做免费高清视频 | 91短视频在线观看污污污| 94人妻喷水视频在线| 综合欧美在线观看少妇| 一级少妇精品视频一区二区| 欧美jizz18性欧美色天堂综合在线 | 日韩欧美一区二区三区成人精品| 动漫播放在线国产成人| 国国产最新精品盗摄视频| 国产在线看av不卡无码网站免费| 国产成人综合在线女婷五月99播放 | 亚洲午夜一级精品| 亚洲自拍偷拍午夜福利| 欧美一级高清首页蜜桃| 亚洲欧美日韩a∨在线观看 | 亚洲婷婷影院女优视频网站| 黑人和少妇冒白浆了| 爱情岛免费视频论坛一路线| 亚洲人成网站18岁禁止| 日韩精品一区二区在线观看视频| 国产欧美久久一区| 91精品网站天堂系列在线播放| 国产日韩欧美啪啪色| 亚洲欧美国产日日| 国产精品酒店在线观看| 亚洲中文婷婷丁香五月天| 精品99视频国产免费尤物| 欧美粗大猛烈18p图| 日本丰满护士bbw| 欧美综合高清日本| 91亚洲色欲国色天香| 影视久久夜色国产精品噜噜噜 | 欧美在线观看不卡一区二区三区| 日本免费一区二区三区看片| 亚洲精品国产成人影片在线观看| 丰满爆乳无码专区线一区二区三区| 五月婷婷丁香综合| av日韩在线观看一区二区三区 | 国产丰满老女人A片免费观看| 日韩无码高清wwww| 欧美亚洲国产手机在线dvd | 农村少妇野外a片www| 亚洲最新无码av网址| 网址你懂得国产精品| 精品无码国产一区二区三区.闺蜜| 国产欧美精品一区二区粉嫩| 人妖系列在线精品| 国产日韩男女激情视频免费播放| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | 国产成人精品一二三区| 成在线人免费视频一区二区| 狠狠久久久精品| 羞羞视频APP下载网站| 欧美成人xx免费视频| 99国内精品久久久久久| 亚洲一区二区一区| 亚洲熟妇真实自拍另类| 国产成人综合亚洲国产vr| 亚洲一区二区三区av黄片| 美女自卫慰视频福利喷水| 久久精品人妻中文系列| 伊人成综合网| 亚洲欧美一区电影| 国产成人剧情?v麻豆映画| 精品精品男人的天堂在线| 日韩在线视频中文一区二区视频综合| 国产精品视频免费看人鲁| 大香蕉国产综合在线视频| 99久久精品无码一区二区麻豆| 相泽南作品在线观看| 精品国产女主自在线久草| 亚洲国产自久久婷婷| 人妻蜜臀av一区二区| 精品国产第一页动漫| 成人免费在线观看高清视频| 6080YYY午夜理论片免费| 在线播放亚洲黄片| 国自产拍在线亚洲网站| 欧美激情一区精品| 韩国成人AV网站在线观看| 亚洲欧美自拍唯美另类| 色欲国产av一级毛片| 色呦呦网站免费| 老司机在线观看亚洲二区一区| 色婷婷精品国产黑人一区二区三区 | 欧洲熟妇精品视频在线成视频| 亚洲性爱视频网站一级看片| 啊灬啊别停灬用力啊黑人| 超碰97人人天天夜夜| 大黑人交xxxx大黑人交野外| 在线观看精品一区二区三区 | 高清免费三级毛片| 国产网友自拍视频| 惠民福利黄色成人网站免费无码av| 在线亚洲欧美日韩国产| 国产成人AⅤ免费观看| 欧美激情四射一区二区在线| 美女自卫慰视频福利喷水| 谁有操逼毛片网站| 天美传媒mv免费观看| 色偷偷色噜噜狠狠网站野外| 最新无码国产在线视频2023| 国产免费女明星色视频| 亚洲精品成人?v在线| 免费精品无码成人片在线观看| 欧美视频日韩视频国产视频| 日韩欧美亚洲国产精品| 久久精品国产精品亚洲艾草 | 欧美一区二区三区福利网| 日韩台精品电影在线观看网站免费| 秋霞午夜国产一区二区三区| 日韩床上特黄一级片| 超碰成人在线91| 在线精品三级视频在线网| 国产精品玖玖玖玖影院| 国产麻豆精品成人毛片| 神马午夜久久久久久| 99精品無碼人妻一區二區三區| 亚洲人成aⅴ在线播放橙子| 亚洲欧美精品国产电影| 中文字幕二区亚洲综合| 一级无码国产片手机版| 国产91作品一区在线观看| 隔壁放荡的人妻在线看中文| 黄色成人在线播放| 一区二区精品在线| 亚洲100部在线观看| 成年午夜免费aⅴ在线观看| 草莓视频app下载18| 午夜精品人成在线观看| 亚洲一区二区三区中文字幕无码| 日韩黄色高清视频| 久久精品亚洲精品五月色| 91免费免费国产在线观看| 亚洲欧美中文日韩v在线在线观看 91精品国产高清一区二区三密臀 欧美日韩国产三级久久 | 中文字幕精品三级视频| 自偷自偷自亚洲首页精品| 缅甸恐怖网站lomando| 秋霞影院韩国伦片在线播放| 欧美经典复古伦理在线| 国内一区二区三免费视频| 中文字幕日本a√在线| 91精品国产91久久久久久无码天美 | 女人毛片免费看一分钟| good电影在线观看三级中文| 亚洲图片视频欧美日韩| 亚洲高清无码操逼视频| 澳门l永久无码视频| 玩弄粉嫩少妇高潮出白浆AⅤ| 亚洲自拍偷拍午夜福利| 成人中文字幕亚洲乱码| 亲胸揉胸膜下刺激视频试看| 嫩模自慰一区二区三区动漫| 国产av网站高跟丝袜| 497799欧洲版的国产suv| 亞洲Aⅴ无码乱码在线观看| 福利午夜伦理影院| 欧美中文日韩综合在线视频| 日韩久久精品一区二区| 婷婷成人久久精品国产| 四虎在线最新地址99| 国产精品va在线观看my| 国产香蕉久久精品免费| 免费99精品国产一级A大人片 | 欧洲精品一二区无码人妻| 欧洲亚洲激情TV中文字幕| 国产精品午夜不卡在线观看| 亚洲国产成人高清一区在线| 日韩人妻熟精品久久无码少年阿宾| 国产精品无码一区二区四区免费| 自拍影视无码免费| 中文字幕一区日韩无码| 国产黄色三级三级三级| 国产欧美一区二区日本加勒比| 国产精品酒店在线观看| 成人自拍视频在线观看| 在线观看免费综合亚洲| 人人干在线视频| 无套挺进少妇私下处内射| 五月色丁香国产精品白拍| 成人免费毛片日韩毛片| 高潮时奶水喷出来了| 黄色一级视频网站| 国产午夜精品草莓一区二区三区| MM131巨爆乳美女少妇动态图| 国产精品大白天新婚身材| 狠狠干经典视频在线观看| 欧美a级片在线观免费观看| 无码专区 免费在线| aⅴ色综合久久天堂av色综合| 欧美成人在线视频在线| 黄色av网页地址一| 美女动态三级在线| 在线观看免费人成视频色9| 中文字幕乱码亚洲v日本| 日韩欧美亚洲另类激情一区| 99视频日韩三级电影| 国产精品无码αV片在线观看播放| 中文又粗又大又硬毛 | 欧美大尺度禁片露器官电影观看| 国产激情在线91| 色偷偷AV永久无码精品无码| 日韩精品亚洲色大成网站| 久久精品aⅴ无码| 在线喷白浆在线视频| 瑟瑟视频在线观看| 最新av网站网址免费观看| 岳乳丰满一区二区三区| av一av无码免费观看| 亚洲色图中文在线| 国产一级A一级裸体片| 果冻国产精品麻豆成人av电影 | 国产成人69天堂| 精品国产乱码久久久久久166| 老司机带带我精品视频| 91探花偷偷拔套在线播放 | 睡错闺蜜男朋友(高h)| 男女十八禁啪啪无遮挡床震窝窝地| 麻豆视频传媒APP| 国产亚洲精品美女2020久久| 114人体棚拍人体私密大尺度 | 久久精品99国产国产精人s| 女教师一级特黄毛片| 精品视频在线观自拍自拍| 妓女精品一区二区| 在线国产网站中文字幕av| 亞洲歐美日韓中文字幕首頁| 少妇中文字幕久久精品无码| 欧洲成熟女人色惰片| 成人国产一区| 国产精品大白天新婚身材| 黄片视频免费国产| 日韩精品国产另类专区互動交流 | 日韩在线欧美观看| 蜜臀98精品國產免費觀看| 日韩视频 中文字幕在线看| 囯产精品99久久一区二区三区| 亚洲中文无码成人网| 亚洲中文字幕丁香婷婷| 免费乱伦亚洲无码| 欧美牲交?欧美牲交| ass日本丰满熟妇pics| 高潮抽搐流白浆视频在线观看| 日本高清免费中文字幕区dd| www.91大地资源二中文在线观看官网成全更新视频 | 亚洲成人一区久久| 中国熟妇乱子hdsex粗| 日韩欧美自在线观看亚洲精品福利片| 亚洲熟妇无码AV| 浪潮国产精品久久久久?v浪潮| 日产一级毛片免费| 日韩国产精品等最新内容! | 人妻少妇蜜桃一区二区| 欧美精品青青久久久久久久久久久 | chinese熟妇老女人hd视频| 国产精品a久久久久| 国产性欧美疯狂猛交69hd| 午夜APP在线观看| 性XXXXX欧美老肥婆多毛| 黄色一线免费高清在线视频16 | 国产美女白浆视频一区二区| 午夜精品九九九九99蜜桃 | 日韓福利一區| 一级黄色毛片在观看| 男人扒开女人双腿猛进女人| 欧美一级高清首页蜜桃| 欧美一区二区三区18禁| 欧美一区二区亚洲成人| 操小孩污视频在线免费观看| 看中国免费毛片视频| 国产精品剧情在线蜜臀| 亚洲午夜一级精品| 鲁大师视频在线观看免费播放| 欧美日本韩国在线视频| 亚洲国产激情一区在线| va中的国少妇偷人HD| (愛妃精選)免费无码毛片一区二区| 最近最新的日本中文字幕| 很黄很黄的曰批视频| 国产成a人亚洲精v| 欧美日韩成人精品第一区| 一进一出把女子干的全身抽搐| 在线观看自拍无码综合| 日韩成人在线视频观看苍井空| 校花高潮抽搐冒白浆| 高清人妻无码中文字幕谷本多| 亚洲成人激情在线观看| 91天堂一区二区三区在线| 黑人巨大无码系列在线| 激情在线日韩欧美日韩| 国产精品第页婷| 电影天堂免费在线观看| 国产精品日本欧美一区三| 人妖系列在线精品| 精品视频卡1卡2卡3| 欧洲aⅴ无码片一区二区三区| 国产精品国产欧美综合一区| 一区二区三区吞精| 国产性欧美疯狂猛交69hd| 草莓视频app下载18| 天天做天天干中文字幕| 91精品国产一二三产区在线观看| 精品人妻挤奶一二三四区| 欧美激情四射一区二区在线| 91精品一区二区三区久久久久| 欧美日韩中文字幕国产一区| 亚洲āV无码专区国产乱码不卡| 91国自产拍在线天天更新| 欧美一区二区亚洲成人| 美女视频黄a视频全免费观看蜜臀| 中文字幕无码亚洲视频| 人妻少妇精品久久人妻| 久久久久久av无码专区| 69精品久久日日躁夜夜躁| 激情依依av男人的天堂| 久久久久无码精品国产H动漫猫咪 91精品网站天堂系列在线播放 | 亚洲三级无码经典三级| 人妻仑乱少妇a级毛片| 色噜噜中文网在线| 黑人粗大区一区二视频| 久久人人97超碰人人爱百度| 国产精品无码动漫| 免费国产成人无码学生妹| 亞洲歐美偷拍另類| 国产亚洲A v手机在线观看| 九九爱WWW无码人成| 色婷婷精品国产黑人一区二区三区 | 国产欧美日韩丝袜高跟鞋| 亚洲第一aⅴ天堂在线观看| dy888午夜国产精品亚洲| 欧美影视一区| 一区二区三区无码在线| 日韩特黄精品一在线看| 黄色欧美三级在线看| 毛片一区在线播放| 国产 亚洲 欧美 另类中文 | 久久99国产精品二区不卡| 美女美女一区二区三区| 国产精品99国产精品久久gif| 国产精品欧美久久久无广告| 色欲国产av一级毛片| 天堂av2017男人的天堂| 欧美日韩中字在线| 成人无码h肉动漫在线观看站| 久久精品久久观看| AV东京热影音先锋| 调教.求饶乖腿打开h| 在线亚洲資源免費看| 野花日本韩国视频免费高清观看 | 欧美日韩高清不卡一区| 日韩AAAA级无码专区免费| 国模欢欢销魂全过程| 成人自拍视频在线观看| 国产网友自拍视频| 久久精品人妻中文系列葵司| 精品一区二区三区国产日韩| 国产超级无码一极毛片| 亚洲国产自久久婷婷| 精品国产青草久久久久福利| 国产亚洲综合秋霞影院国产| 国产影视乱伦三级| 女性喷液过程高清免费视频| 免费国产自产一区二区三区四区| 少妇太爽了在线观看视频| 在线观看亚洲欧美一区二区三区| 免费国产一区二区8X| 七月亚洲天堂av中文在线官网| 午夜福利男女xx00视频网站 | 永久免费观看的片毛视频| 成人国产精品视频| 手机在线日本视频| 思思热这里只有精品5| 18勿看免费大片1000拍拍| 国产午夜刺激视频一区二区| 中国一级免费黄色电影| 国产一线在线观看| 国产精品AV毛片免费看观看| 蜜柚影院AV免费观看| 又大又粗又爽国产色欲AV| 黄色一级视频网站| 人妻精品久久一区二区| 奖励网站正能量www正能量| 日本羞羞视频在线观看| 国语对白久久精品视频| 国产偷人视频免费观看| 久久久国产精品免费无码| 无码国产福利av私拍导航| 国产露脸无码a区久久蘑菇| 国产aⅤ一二三区无码视频| 韩国美女一级毛片| 超碰97人人模人人爽人喝| 亲胸揉胸膜下刺激视频试看| 人妻被中出不敢呻吟A片视频| 久久久久久人妻| 欧美日韩中文字幕国产一区| 亚洲欧美一区二区三区69| 亚洲一卡2卡三卡4卡127.0.0.1| 日日澡夜夜澡人人| 另类亚洲欧美精品综合| 亚洲狼人制服中文字幕| 国产亚洲欧美日韩网站| 日日夜夜摸多人换着玩| 国产成人在线免费网站| 国产∨a在线观看免费| 免费萌白酱国产一区二区三区| 韩国三级片在线播放| 一级做a爰片久久毛片潮喷无码 | 色噜噜中文网在线| 国产一国产精品免费播放| 国产精品麻豆一区二区三区v视界 国产精品精品综合在线网址 | 人妻撑开合不拢流出白浆视频| 国产精品人妻无码久久久免费看| 亚洲全部无码中文字幕| 在线国语精品视频| 亚洲欧洲日产韩国夜夜高潮| 亚洲综合无码一区二区三区四区 | 久久综合老色鬼网站| 伊人色婷婷五月综合久久97| 亚洲成AV人手机在线观看网站| 国产精品 福利 在线| 国产第一自拍| 亚洲精品日韩专区在线观春| 亚洲欧美日韩制服综合| 亚洲v欧美v国产ⅴ在线成| 爱情岛免费视频论坛一路线| 制服丝袜自拍偷拍av一区| H片在线播放免费观看| 久久久久久免费播放一级毛片| 二级黄色录像片免费播放| 91香蕉视频在线观看分享的内容是很丰富的 | 秋霞久久女婷五月综合色啪| 欧美成人国产精品一区二区| 日韩av三级在线免费观看| 久久电影午夜鲁丝片无码| 日本又色又爽又黄的网站免费| 日产午夜精品一区二区播放| 无码国产精品一区二区蕉蕉免费式| 亚洲在AV极品无码天堂| 亚洲午夜无码毛片Av久久京东热| 国产精品美女在线免费| 日本www成人网站在线观看| 草莓视频免费在线看| 亚洲永久免费无码打屁股| 污软件在线观看软件| 欧美日韩精品第一区二区| 极品精品伊人国产| 亚洲视频在线观看污污的黄| 免费无码AV片在线观看sm| 午间影院又黄又粗又大| 国产精品久久久久久五月天加勒比 | 欧洲亚洲激情TV中文字幕| 中日韩产精品1卡二卡三卡| 天天爽天天爽免费视频| 99不卡亚洲无码视频| 国产成人av国语在线| 亚洲日韩精品人妻| 国产Av激情久久无码天堂| v影院一区二区三区自产不卡视频| 亚洲av福利天堂在线观看| 国产一级普通话农村毛片| 又脱又摸下面激烈免费视频| 欧美三级直播美女视频在线观看| 制服丝袜美腿 AV影院| 成人AV综合一区二区三区| 青青草中国三级片| 日韩久久精品一区二区| 欧美日韩国产三级久久| 日韩美女粉嫩小泬在线精品| 成年人国产一级片| 麻豆国产91视频| dy888午夜国产精品亚洲| 奇米一区二区三区四区久久| 99尹人香蕉国产免费天天拍| 亚洲欧美日韩国产精品中文字幕| 超碰97人人模人人爽人喝| 成人免费a级毛片无码片在线播放 一本久久a久久精品免费不 | 国产乱人视频在线免费观看| 香蕉精品视频一区二区三区| 久久久精品3d动漫一区二区三区| 亚洲精品成人一二三区| 日韩欧美综合在线二区三区| 最近在线中文字幕更新| 6080精品人妻一区| 日韩国产欧美一区免费观看| 久久久人妻无码一区二区三区| 国产精品免费播放器大全| 欧美性爱福利视频| 在线视频精品中文无码| 国产午夜福利在线播放87| 国产91九色在线| 福利社区在线观看| ddd54手机免费看| 18观看免费永久视频| 三级片网站国产欧美日韩| AV乱码一区二区三区| 日本人妻最新在线中| 一区二区三区av免费| 国产日批视频免费在线播放| 欧美日韩国产激情另类| 女人被男人桶| 中文字幕在线不卡观看视频| 2021最新在线无码视频| 先锋影音制服丝袜| 日韩欧美一卡二区| 亚洲av手机在线观看| 秋霞在线手机国产在线| 国产精品有码无码脛∨在线| 人妻系列专区无码在线| 国产性欧美疯狂猛交69hd| 日本特黄特色大片免费在线观看| 国产av剧情精品麻豆| 久久久久久久久久久精品| 中文字幕日韩亚洲视频在线| 久久人人97超碰人人爱百度 | 国产成人无码精品久久久亚洲精品人成无码中文毛片 | 奇米777四色欧美精品| 在线观看精品一区二区三区| 国产污污视频在线观看| 亚洲AV无码乱码忘忧草亚洲| 五月天婷五月天综合网 欧美片区| 免费在线播放无码黄色片| 亚洲日韩成人在线| 国产激烈刺激网站免费观看| 18进黄址app最新版| 草莓视频APP下载官方| 日本高潮少妇一区二区三区| 青春草五月天婷婷欧美日韩| 亚洲高清国产拍精品青青草原| 国产偷人视频免费观看| 少妇一区二区三区精品| 丁香婷婷深情五月丁香中文字幕| 男女高潮吃奶添下面动态图| 一区二区三区色网视频在线观看| 亚洲中文字幕一区二区不卡国产 | 亚洲影视AV一二三| 欧美亚洲国产手机在线dvd| 国产制服在线视频| 丝袜ol美脚秘书在线播放| 久久精品亚洲精品五月色| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | H片在线播放免费观看| 国产成人裸体片免费看| 国产精品高潮在线| 亚洲人成aⅴ在线播放橙子| 自拍亚洲欧美另类动漫| 日本国产我97在线| 美女图片大黄网站永久免费| av大片在线观看| 调教.求饶乖腿打开h| 污视频在线免费观看| 天天操天天曰| 一二三四在线色网视频观看社区| 日本久久一区二区免费| 日本国产一区二区三区在线观看| 国产精品99欧美在线一区二区| 亚洲精品私拍国产福利88| 免费高清国语自产拍视频在线不| 色小说色网视频| 极品人妻videos人妻| 欧美一区二区三区18禁| 久久精品国产99国产精品严洲| 免费一级毛片在线播放放| 成人无码av一区二区三区| 小视频播放亚洲欧美| 最新无码不卡手机在线视频| 人妻回春按摩肏到中出| 国内精品自线一区二区2021| 无码日韩做暖暖大全免费| 伊人久久综在合线亚洲2019}| 制服丝袜物喷水亚洲综合精品| 99RE6国产精品99RE在线| 国产成人av一区二区三区中文精品| 自拍影视无码免费| 杨幂喷水高潮在线观看视频| 了解最新国产精品视频一区二区三区经 | 久久午夜片电影鲁丝午夜精品 | 一区二区三区午夜片| 久久久国产精品免费无码 | 亚洲国产精品香蕉视频| 一区二区三区av免费| 拔萝卜视频直播下载| 999免费观看四虎精品国产| 黄色视频在线观看视频网站| 久久精品久久精品中文字幕| 亚洲欧美日韩精品久久久一区二区| 麻豆视频传媒APP | 最新国产成人精品区在线观看| 欧美亚洲少妇日本| 91亚洲黄色在线看| 国产经典无码在线免费看| 亚洲成人特级毛片| 日韓歐美一區二區三區不卡| 日本电影中文字幕久久| 97久久一精品人妻人人玩| 国产91高潮流白浆在线播放un| 国产在线播放线视频免费| 中文字幕人妻久久精品一区二区| 欧美亚洲国产另类在线| 国产日韩综合一区二区性色?Ⅴ| 伊人久久大香線蕉AV五月天| 精品久久久久久人妻黑人| 中文字幕永久有效丝袜| 欧美日韩在线精品激情福利综合 | 美女内射口爆av在线| 色婷婷国产精品欧美毛片| 国产精品自偷自拍| 好姑娘10影视剧在线观看| 久久久7777888精品| 国产精品成人嫩草影院| 免费真人一对一视频| 亚洲男人的天堂在线va| 国产在线高清无码视频| 国产美女裸乳无遮挡网站| 日韩AⅤ在线免费观看| 性欧美高清短视频免费| 欧美一级二级三级网站大全| 亚洲一日韩中文字暮AV| 91香蕉依人综合久久| 成人精品aaa亚洲丝袜在线观看| 色天堂在线观看视频 | 亚洲911精品影剧| 日韩一区二区在线视频| 手机版亚洲成人网站| 一本无码人妻在中文字幕免费经典| 欧美日韩国产精品动漫精品| 国产精品久久成年人免费视频| 91精品无码4k岛国| 大香蕉久久综合在| 亚洲欧美日韩中文高清| 99精品亚洲国产精品| 2014AV天堂无码一区| 成年人在线观看网站| 四虎国产在线| 国产91高潮流白浆在线播放un| 少妇无码AV无码专区在线| 午夜视频成在线人成在线人| 无码日韩做暖暖大全免费| 十八禁爽爽爽无遮挡在线观看网站| 黄色亚洲黄色日韩| 欧美成人国产精品一区二区| 欧美另类亚洲日韩精品一区二区不卡| 久久免费视频8| 中国熟妇乱子hdsex粗| 国产美女露底激情视频| 无码日韩小说视频| 亚洲国产日韩欧美综合在线一区二区三区| 怡红院免费的全部视频国产a| 亚洲日韩av一区久久精品| 99热国产这里只有精品99| 日韩av在线在线观看| 亚洲婷婷影院女优视频网站| 国产乱码人妻一区二区三区| 八戒影视大草原久久揄拍片| 跪趴着被主人狠狠调教| 焯逼国产精品| 国产成人av一区二区三区中文精品| 国产经典无码在线免费看| 农村少妇野外a片www| 韩国美女精品久久久久久| 鲁大师视频在线观看免费播放| 欧美综合色网| 妓女网一区二区| 欧洲美女一级牲交视频| 成人片在线观看亚洲欧美| 精品唯美系列最新在线视频| 国产成人精品亚洲二区| 电影《色戒》未删减版| 国产内地刺激性精品毛片| 久久一区二区美女视频网| 成熟少妇av免费网站| 正在精品视频第一页| 在线三级网址| 91亚洲色欲国色天香| 99精品一区二区无码吞精视频| 精品国产v无码大片在| 下载强漫画人物软件| 91精品国产福利资源在线观看麻豆| 日韩av手机在线观看| 欧美精品日韩精品在线| 国产三级片在线观看网站| 成人性视频欧美一区二区| 亚洲无遮挡一级精品视频| 久久国产精品15色老板| 国产偷窥熟女精品| 国产精品亚洲日韩高清资源| 欧美日韩精品区久久久| 伊人丁香五月在线视频| 亚洲视频在线观看免费一区| 亚洲va欧美va人人爽老师| 欧美亚洲不卡av免费一二三区| 91短视频在线观看污污污| 日本久久一区二区免费| 亚洲三级无码经典三级| 精品精品男人的天堂在线| 亚洲成年网站| 成在人线Aⅴ免费观看| 麻豆精品在线免费观看| 伊人色婷婷五月综合久久97| 人妻中文字幕专区| 性国产日韩欧美一区二区在线| 欧美粗大猛烈18p图| 亚洲免费视频免费观看| 亚洲专区日韩中文在线| 亚洲色图中文在线| 亚洲人妻精品综合无码专区| 国产美女露底激情视频| 亚洲人成aⅴ在线播放橙子| 韩国三级中文字幕HD久久精品| 国产黄色一级片在线观看无码高清| 欧美日韩国产三级久久| 五月天丁香色| 日韩免费福利剧场| 亚洲卡2卡三卡4卡2021老狼| 大屁股人妻女教师撅着屁股| 有没有免费无码h网站的| 天天爽天天爽免费视频| 特级a毛片免费观看| 亚洲AAA一级无费看| 亚洲AV无码国产精品色午夜久久| 福利社区在线观看| 又大又粗又爽国产色欲AV| 国产欧美精品一区二区粉嫩| 亚洲欧洲日产韩国夜夜高潮| 精品亚洲成av人在线免播网站| 国产中文自拍无码| 亚洲黄色AV电影在线不卡| 国产美女露底激情视频| 被男子脱掉内裤的美女视频| 国产刺激一女多男一区二区| 日本免费一区二区三区看片| 中文又粗又大又硬毛| 丰满多毛xXXⅩ精品视频| 久久伊人毛片视频| l精品国产亚洲区久久99| 97久久久人妻一区精品| 亚洲成片观看四虎永久网站| 欧美亚洲少妇日本| 在线播放国产视频99| 性感日韩在线视频观看| 免費在線一級片| 又色又爽又硬又刺激的视频| 国产网友自拍视频| 白丝被弄羞涩娇喘动态图| 在线观看精品一区二区三区 | 亚洲永久精品ww47 91一区| 国产成人综合亚洲国产vr| 色秀视频在线WWW色| 亚洲 自拍 色综欧美合图区| 精品在线欧美一区二区| 午间影院又黄又粗又大| 扒开老女人p大荫蒂warmth| 欧美二区视频在线观看| 春色 都市 亚洲 小说区 | 亚洲欧美制服专区| 久久成人精品免费国产片| 69国产成人精品午夜在线| 国产亚洲乱码无码www| 精品国产一区二区三区久久狼黑人| 久久久久亚洲精品日久生情| 老司机午夜精品99久久免费| 欧美黑人精品一区二区在线| 国产精品v欧美| 日韩欧美偷拍人妻丝袜第一页| 在线观看国产一区二区三区| 天天做天天欢摸夜夜摸狠狠摸| 偷拍女厕一区二区| 亚洲色欲AV无码专区在线播放| 国产精品中文字幕一区二区三区视频 | 久久电影午夜鲁丝片无码| 老外黑人一级毛片| 欧洲成熟女人色惰片| 无码gogo大胆啪啪艺术免费| 麻豆国产AV超爽| 日韩视频在线观看免费6080| 國產日韓視頻在線| 午夜综合影院欧美聚众性派| 色影音先锋色资源网站| 国产美女露底激情视频| 国产成人福利在线视频播放下载| 久久精品久久精品中文字幕| 久久精品无码亚日韩免费影视观看中文 | 久久免费福利资源站| 医院人妻隔着帘子被中出| 在线看片免费视频国产五月天| 绿巨人聚合app入口| 亚洲精品色无码一二三区| 久久sese三级亚洲精彩| 久久亚洲欧美精品一| 日韩激情偷拍第3页| 免费国产成人午夜在线观看| 年轻的朋友3完整版在线观看| 男女视频诱惑国产在线观看| 欧洲另类综合| 尊龙凯时·(中国区)人生就是搏! 亚洲乱码国产乱码精品精乡村 | 欧美亚洲国产中文另类在线观看| 一区二区三区色网视频在线观看| 超碰97人人天天夜夜| 免费高清国语自产拍视频在线不| 人妻日韩AV无码一区二区| 日韩欧美在线观看一区二区三区| 亚洲色图国产无码| 欧美人妻精品一二三区| av资源久久免费下载| 国产一国产精品免费播放| 国产av亚洲v天堂av| 一级黄片免费1999| 精品在线观看免费一级毛片| 久久99热免费精品久久| 日本一本高清在线观看视频亚洲一区二区三区| 俄罗斯aaaaa特级毛片| 国产乱人伦偷精品视频???| 成年午夜免费aⅴ在线观看| 999免费观看四虎精品国产| 884aa四虎影成人精品| 国产亚洲精品系列| 日韩偷拍一区二区三区| jizz一区二区在线观看| 码 码加勒比国产在线| 高清国产在线观看| 黄色片久久美女啊啊啊内色| 人妻中出中文字幕資源免費看| 欧美三级电影天堂| 女人的天堂毛片AV在线| 日韩无码一区二区高清视频| 国产成a人亚洲精v| 国内高清A自拍视频| 精品久久久久久无码人妻外国| 澳门精品久久国产电影| 亚洲av成人片无码网站动画| 日韩欧群交p片内射中文| 亚洲日韩精品综合| 成人午夜精品網站在線觀看| 中文字幕无码专区dvd在线 | 八戒影视大草原久久揄拍片| 亚洲无码高清国产| 亚洲AV日韩在线一区二区三区| 色戒未删减2小时38分在线| 久久精品国产亚洲Vā香蕉| 天天干天天肏| 国产天堂网www在线资源av网 | 国产欧美日韩丝袜高跟鞋| 亚洲第一aⅴ天堂在线观看| 美女裸体视频在线无卡黄色免费网站 | 久久精品国产亚洲A∨未满十八| 日韩人妻久久久av一区二区| 欧美一级人成视频| 精品国产第一页动漫| 在线亚洲无码| 无人视频免费观看免费视频| 白洁老师国产麻豆片| 日韩av手机在线观看| 成熟少妇av免费网站| 男人天堂日韩精品| 中文字幕一区二区人妻本田岬| 天堂国产成人av在线| 欧美一级人成视频| 亚洲av中文aⅤ无码av电影| 天天看天天噜噜噜在线视频| 91桃色国产精品免费在线观看| xxxx欧美丰满大屁股| 亚洲午夜一级精品| 日本美国一级大片| 日韩国产亚洲欧美有码| 香蕉视频久久免费直播| 亚洲人成网站免费999久久久 | 扒开老女人p大荫蒂warmth| 欧美日韩中字在线| 后入式肏大屁股眼免费视频| heyzo无码综合亚洲精品| 久久久亚洲成人aⅴ| 国产日韩男女激情视频免费播放| 狠狠色狠狠色綜合久久第一次|