国产精品人人爱一区二区白浆_国产我不卡午夜伦理_免费电影亚洲一级黄片_国产午夜福利久久_51视频在线观看免费国产_天堂AV网手机版_国产精品毛片一区二_印度女人性液_日韩大片91免费观看视频播放_日本欧美国产精品第一页久久

手機(jī)版
1 2 3 4
首頁 > 新聞中心 > 行業(yè)新聞 >
行業(yè)新聞

上海翻譯公司完成工程類英文翻譯

發(fā)布時(shí)間:2018-03-15 08:45  點(diǎn)擊:

上海翻譯公司完成工程類英文翻譯
SPECIFICATION FOR SITE OFFICE AND SIGN BOARD GENERAL  PRICING PREAMBLE
BILL OF QUANTITIES
 
SITE WORK AND PRELIMINARIES ROADWORKS
ELECTRICAL WORKS TELECOM DUCTING WORKS SECURITY DUCTING WORKS WATERWORKS
STORM WATER WORKS SEWERAGE WORKS IRRIGATION WORKS LANDSCAPING WORKS
 
SECTION 5
 
SECTION 6
 
SUMMARY OF THE BILL OF QUANTITES (S) DAY WORK SCHEDULE (DW)
 
(a) Manpower
 
(b) Material
 
(c) Equipment
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
Abu Dhabi Police GHQ- Police Projects Committee intends to construct the main infrastructure of the new  Training  Village  at  Al  Hafar.  The pro 丿 ect site is  approximately  1.0  km  by  2.0 km located
approximately 6 km north of Abu Dhabi - Al Ain highway, refer to site location map & Key plan drawings contained in Vol.4 of the tender documents. The project consists of the following zones:
. ZONE A -  Main Administration
. ZONE B - Maintenance and Services
. ZONE C - lndoo 「 Ranges
. ZONE D -  Public Order
. ZONE E - Arms and Explosives
. ZONE F -  Urban Zone
. ZONE G -  Prison Zone
. ZONE I - Anti Narcotics
. ZONE J - Crime Scene ZONE K - Dog Training ZONE L -  F7 Zone
. ZONE M -  Driver Training
. ZONE 0-AirWing Zone
The scope of work includes supply, install, construct, test and commission of the main infrastructure which includes the following disciplines:
 
 
The earthwork for the entire project was part of a separate contract, however Contractor is required to undertake the earthwork related to the installation of the specific infrastructure as per the Tender Documents and the authorities general and standa「ds and guidelines.
 
The scope of work is detailed further in the following sections.
 
Contractor shall read this document in conjunction with the full set of the Tender Documents which includes Tender Drawings and shall comply in all respect to the requirements of the relevant service departments/authorities for these wo「ks.
 
The existing services, if shown, on the drawings are for information purposes only and do not necessarily show exact locations, depths, spacing, smaller branches of utilities and services which are not normally indicated on such drawings, nor the possible existence of other underground utilities and services.
 
The Contractor shall be responsible for investigating the soil / ground conditions and shall make all the necessary soil investigation and subsurface investigation as he may require to fully familiarize himself  with the  properties  of  the  soil and  shall be deemed  to  have included  in  his  tender all
materials, plant services, labour and provisions as may be required for all earthwork to complete the Works.
 
The Contractor shall provide all necessary protection for the existing services as may be requ「i ed by his works operations and to the satisfaction of the owning authorities and the Engineer
 
The Contractor shall carry out all the necessary tests to establish the suitability of the borrow materials, the placed borrow material and the ground exposed as a result of the cut operation shall be evenly compacted in accordance with the relevant terms of the specifications and as directed by the engineers
 
Infrastructure Disciplines:
 
1. Road Works
 
Abu Dhabi Police Training Village (ADPTV) will be constructed on pre-graded area of approximately 1.00km x 2.00km. Grading of village is part of separate contract. Road works include tying into existing road, earthwork, signs and marking, roadside furniture, footpath/sidewalk and other related
construction. Construction shall be according to the drawings & specification included with this tender.
 
Roadway construction shall consist of asphaltic wearing course, asphalt binder course, asphalt concrete base course, aggregate base and granular sub-base. Signage to be provided shall include warning, regulatory signs appropriate to traffic construction: in addition to temporary sign required during construction period. Roadway construction is under this tender is only limited to the entrance of each zone/plot, any details inside the plots even if shown on the drawing shall be considered fo 「information only.
 
Summary of scope of road works includes but not limited to the following
 
13.00 km of single carriageway
 
1.20 km of dual carriageway with
 
1.60 km of access road to utilities building
 
2 no. new access from exiting/upgraded road to ADPTV.
 
2.00m wide footpath/walkway along the road.
 
30 no.s raised pedestrian crossings
 
48 no.s of speed control hump
 
Road signs and marking
 
FOR TENDER ONLV
'""'°"' I  旦 CT
TE巳ODIN M.E . Ltd.
 
 
 
2. Telecom and Electrical Works
 
2.1 11kV Network
 
Supply, install, test and commission the 3CX300 sq.mm Cu/XLPE 11KV cable as per ADDC specifications, from 33/11kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply, install, test and commission the 3CX120 sq.mm Cu/XLPE 11kV cable as per ADDC 的 m Ring main unit up to the transformer as per the d「awings.
 
Supply, install , test and commission 32 core Fibre optic cable from 33/11 kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply and install the Fiber optic cable chambers as per the drawings and as per ADDC standards.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
All the substation equipments, as per pro 」ect requirement shall be supplied and installed by the contractor as per ADDC requirement.
 
Supply, install, test and commission distribution transformers, RMUs, earthing of the equipments, and all necessary fitments including connections to the EFls as per ADDC specification and drawings.
 
All the protection requirements including but not limited to protection setting calculations shall be provided by the contractor as per ADDC specifications.
 
 
 
2.2 Street Lighting System
 
Supply, install, test and comm1ss1on the 3CX10 sq.mm Cu/XLPE cable as per ADM specifications from street lighting control cabinet to street lighting poles as per the drawings.
 
Supply, install, test and commission the street lighting system including street lighting control cabinets, street lighting poles and light fixtures with all the necessary fitments as per ADM specifications, as pe 「 the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADM, client and other authorities.
 
Street lighting system should be fed from the substationTRM04/M. All the LV cables required to be laid between the substation LV panel and the service cabinets should be supplied and installed by the contractor.
 
All the substation equipments shall be supplied and installed by the contractor as per ADDC requirement and as per project requirements.
 
 
 
2.3 Telecom
 
Supply and install the 4-way telecom ducts as per the drawings
 
Supply and install the JRC-12 and JRC-14 manholes as per the drawings
 
Contractor shall supply and install all the cables of telecom system.
 
Preparation of shop drawings and as-built drawings as per the requirements of Etisalat and client.
 
 
 
2.4 Structured Cabling System
 
Supply and install the 9-way security ducts, JRC-12 and JRC-14 manholes and all the cables of structured cabling system as pe「 the drawings and specifications.
 
Construct the Police Main IT building as per the details indicated in the specification and drawings as per project requirement including but not limited to raised floor, cable trays, etc. as
pe「 GHQ specifications as per project requirements.
 
Contractor shall supply, install, test and commission Tetra tower system with all the associated works including the power as per the drawings, specification and project requirement.
 
Preparation of shop drawings and as-built drawings as per the client's requirements.
 
2.5 LV Network
 
Supply, install, test and commission LV service cabinets including earthing and necessary fitments as per ADDC specifications and drawings. The arrangement to feed the  service cabinets from the LV panel in TRM-04 M is also included in the SCOPE. This shall also include supply install test and commission the LV cables as per the ADDC specifications and RSB guide lines. All the necessary calculation to justify the cable size shall be provided by the contractor
 
Supply, install, test and commission 4CX95 sq.mm Cu/XLPE cables as per ADDC/ADM specifications to feed the street lights control cabinets from the service cabinets as per the drawings and as per the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
3. Water Works
 
The scope of for water works shall include but not limited to the following:
 
Supply, installation and construction of new 0D250 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents including all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works as per the details indicated in the specification and drawings
 
Supply, installation and construction of new 0D180 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 0D160 HOPE Pipeline of within the approved pipeline route as pe 「 the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 00110 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply  and installation  of  all  necessary  fittings,  gate  valves,  contro.l  valves ,  Electromagneitc flow meters and 閑 ated accessories as per the details indicated in the Tender Documents.
 
Supply and construction of Road Crossing ducts (concrete encased GRP ducts) as per the details indicated in the Tender Documents.
 
All necessary connections/disconnections to be made between the new/relocated waterlines and the existing system as per the details indicated in the Tender Documents
 
Construction  of  Civil  works  including  valve  chambers,  bulk  consume「  chambers, fire hydrant boxes, protection slabs, water ducts at road crossings, sign posts and marker posts all as pe 「the details indicated in the Tender Documents.
 
Supply and construction of reinforced concrete slabs for waterline under roads and parking areas as per the details indicated in the Tender Documents and/o「 directed by the ENGINEER.
 
Carryout all required safety measures and temporary facilities for pedestrian and vehicles according to HSE requirements and procedures to ensure public safety during the execution of the project.
 
Removal, shifting or transplantation of the trees/plants in conflict with waterline route to the locations as approved by the concerned authorities
 
 
 
Removal and reinstatement of tiles, green and asphalt area, etc.
 
Successfully conducting the preliminary and final hydraulic pressure testing, disinfecting and flushing of the completed waterlines prior to commissioning and connection/disconnection to the existing water network system.
 
With respect to construction, testing, sterilising and commissioning etc. the following shall be taken into consideration:
 
o All construction work shall be conducted with the minimum possible disturbance of the water supply serving consumers who are already connected to the existing system.
 
o The CONTRACTOR shall liaise fully with the ENGINEER and ADDC in order to temporarily shut down existing live pipelines  if necessa ry, in order to carry out the WORKS.
 
All other associated works necessary to successfully  complete all above works
 
 
 
4. Storm Water
 
The objective of the storm wate 「 system of Abu Dhabi Police Training Village is to provide cost efficient means of collecting and disposing storm water run-off to a suitable location (Pond / Lagoon) to prevent flooding as a result of rainfall event as shown in the Tender Documents and bill of quantities.
 
There is existing storm water system (collection & disposal) within and adjacent to the project area and a proposed storm water system to be provided in the future. Howeve 「 Contractor is responsible to examine the area and obtain any information from the authorities on potential existing utilities
befo「e excavation.
 
4.1 Storm water system - Pipes & Manholes
 
The storm water system mainly is divided to two pipelines connected to each others:
 
Collection Lines:
 
Normally have pipe dia. of 300mm with average slope of 0.5%. The collection lines shall have rectangular chambers to be installed as inlets. Majorly, two types of inlets are available in network; Inlet chamber & Catch-basins. Both chambers shall have it own arrangement  in supply, excavation & installation. The required chambers a「 e proposed to be installed in two different locations, on curb edge as kerb inlet and the other within road way as flush inlet
 
Main Lines: Varies as followinq:
 
1. 300, 400 & 500mm diameters-uPVC at average depths of 1.0 - 4.0m with average slope of 0.25%, 0.17% & 0.15%, respectively. The manholes proposed along these pipes are storm water circular manholes (Type-4) with internal dia. of 1.1m. the average distances between manholes aren't exceeding 1OOm , maximum.
 
2. 600, 700 & 800mm diameters-GRP at average depths of 1.0 - 3.0m with average slope of 0.14%. The manholes proposed along these pipes a「 e storm water rectangular manholes with circular  shafts (Type-5)  with internal dia. of 1.1m and intermediate slap as per ADM
standa「ds. The average distances between manholes aren't exceeding 120m, maximum.
 
4.2 Retention / Infiltration Pond:
 
The proposed SW pond is located at North/East corner of PTV area. The pon.d shall work as retention / infiltration pond for the expected amount of flow conveyed through SW pipelines. The out fall pipe discha 「 ging to the pond shall has non-return valve (Flap valve) at its open end. uPVC perforated  pipes  are proposed  surrounding  the  pond  circumference in  order  to  filtrate  SW into
su「r ounding natural ground.
 
5. Sewerage Works
 
The sewerage network of ADPTV is designed to deal with the estimated peak flow  from all zones and to collect the sewage into the temporary proposed holding tank. The collected sewage shall be transferred by tankers to the nearest existing STP in coordinatoi n and approval of the ADSSC.
 
Sewage generated from each zone wilt be collected via manholes insfalled at each zone boundary, then discharging the collected sewage by a system of gravity sewers and manholes into the holding tank. Due to the excessive depth of the inlet pipe of the holding tank, a lifting station is proposed to lift the sewage and discha「ge into the holding tank.
 
The sewerage network contains the following components:
 
5.1 Sewerage Pipelines and Manholes
 
The material of sewerage pipelines is uPVC with diameter varies from  160mm  to 300mm. One typical manhole with internal diamete「 of 1.50m is used.
 
The contractor shall provide / include in his construction works the main supply pipe up to the boundary limit (fence) of the current development providing end cap for future connection
 
5.2 Pump Stations
 
One pumping station is required. The pumping station has 1 duty and 1 standby sub mersible pump installed within a wet well receiving sewerage from a gravity collection network and discharging the flow into the discharge chamber then throughgravity sewers to the holding tank.
 
The type of the station will be type 1 as the flow is less than 100 I/sec.
 
The pumps are selected to delive 「 the required flow at calculated total head. Pumps are of submersible type with non-clogging mixed-flow impellers. Pumps and motor drives are selected to satisfy the final design flow. The internal diameter of the wet well will be 3.2 m as shown in tender drawings.
 
5.3 Holding tank
 
A temporary holding tank is to be constructed in the north side of ADPTV. The holding tank is divided into two compartments.  It will be furnished with inlet pipe receiving flow from the discharge chamber In addition, outlet pipe will be provided and furnished with end cap/plug to allow for future connection once the planned sewerage treatment plant is completed and operated
 
6. Irrigation Works
 
lrriHation Network
 
The scope of works comprises the installation and testing of the irrigation network of the training village as detailed in the Tender Documents. Contractor shall install all the necessary irrigation appurtenances complete in all respect as per drawing details and specificationas follows:
 
1. DN250mm dia. Pipe Class-D (1O")
 
2. DN200mm dia. Pipe Class-D (8")
 
3. DN100mm dia. Pipe Class-D C4")
 
4. DN75mm dia. Pipe Class-D (3")
 
5. DN50mm d舊.Pipe Class-D (2")
 
6. DN38mm dia. Pipe Class-D (1-1/2")
 
7. DN25mm dia. Pipe Class-E (1")
 
8. DN250mm gate valve (1O")
 
9. DN200mm gate valves (8")
 
10. DN100mm gate valves (4")
 
11. DN100mm Zone demand points (4")
 
12. 2" Air-Vacuum valves
 
13. 4" Wash-out valves
 
14. Irrigation decoder cables (AWG #14)
 
15. 4 Station stand alone type controller at the main entrance roundabout
 
16. 1" solenoid valves along the main entrance road
 
17. Drippers and dripline tubing along the main entrance road lrriqation Tank and Pump Room:
The  irrigation  tank  and  pump  room  shall  be  for  future  installation,  howeve「, the  contractor  shall provide/ include in his construction works the main supply pipe (DN250mm) up to the boundary lim 仆(fence) of  the current development  and provide pvc end cap  fo 「 future connection
 
Additional Contractor's scope of work is installation/ construction of the following:
 
 
 
Page 10 of 13
 
 
 
1. DN75mm (3") pvc solenoid valve risers with end cap
 
2. DN25mm (1") pvc quick coupling valves risers/connection with end cap
 
3. Termination of decoder cables at the proposed location of decoder cont「olle「s and the proposed location of solenoid valve risers.
 
4. Provision, installation, testing and commissioning of standard 4 station cont 「 olle 「 at the main entrance road
 
5. p 「 ovision, installation, testing and commissioning of 1" solenoid valves at the main entrance road
 
6. Provision, installation, testing and commissioning of irrigation cables at the main entrance road
 
7. Provision, installation, testing and commissioning of drippers and dripline tubing at the main entrance road
 
The main irrigation network is for futu「e utilization in anticipation when treated sewage effluent (TSE) irrigation water shall become available at the fac小ty. The Contracto「 therefore, shall take every steps and consideration to install the main irrigation network in its fullness, whereby future excavation shall be avoided, except for the installation of the solenoid valves, the two (2) decoder controllers, quick coupling valves, the secondary and tertiary irrigation lines downstream of the solenoid valves.
 
 
 
7. Landscape Works
 
The landscape works shall comprise of soft and hardscape works. The quantity of the landscape drawings have been modified to address the unavailability of treated sewage effluent irrigation water. The modification involves the replacement of softscape with gravel mulching and ornamental pebbles.
 
The only place for softscape is in the main entrance  road of the tac 仆 ity. The 「 est of the previous  area of  softscaping  works are now replace with ornamental  pebbles and gravel mulching.
 
The softscape  works  at  the  main entrance road  comp「ises of  installation and maintaining  for one year the plantation as follows:
 
1. Palm Trees = 9 nos
 
2. Ornamental Trees = 26 nos
 
3. Shrubs and ground cover   = 785 m2
 
Estimate of the gravel mulching quantities to be laid in place of the softscape works are as follows:
 
1. Type 1 Ornamental Pebbles= 450 m3
 
2. Type 2 Ornamental Pebbles= 210 m3
 
3. Type 3 Ornamental Pebbles= 230 m3
 
4. Type 4 Ornamental pebbles= 270 m3
 
 
5. Type 1 Gravel mulch
 
6. Type 2 Gravel mulch
 
7. Type 3 Gravel mulch
 
= 2,270 m3
 
= 1,280 m3
 
= 650 m3
 
 
The ornamental pebbles and gravel mulch we「e estimated at a depth of 75mm and the above figures are indicative only. Con「t actor shall be responsible in verifying the quantities shown above.
 
Included in tender drawings are the original approved landscape drawings. Cont「actor shall take note to disregard the softscape design in these drawings, Contractor shall consider only the hardscape such as trash bins, benches, walkway and pavements, and water feature details as follows
 
1. Trash Bins details
 
2. Benches details
 
3. Roundabout pavement details
 
4. Pavement and walkway details
 
 
 
5. Water feature details
 
6. Fountain at the roundabout
 
7. Electrical landscape lighting at the main entrance of the facility
 
Contractor shall be responsible in assessing the practicality and complicity of the hardscape design on walkways, pavements, water fountain and water feature and accordingly produce its own shop drawings for final approval.
 
The Contractor shall in his own discretion and experience, consider in his bid items that are not shown / mention in any of the tender documents but are necessary in completing the irrigation and landscape works as envisioned in this tender.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
 
Temporary offices at the site for government officials and the consultant Staff
 
Number of offices on the site is depending on the number of consultant's supervision staff. The offices area is as follows:
.Authority Representative
 
Soil Laboratory Room:
 
The area of soil laboratory shall be (18 m2) and the area of restroom shall be (2 m2) with add巾onal room of (20 m2) if needed. All the rooms shall be air-conditioned.
 
These areas do not include the corridors.
 
Offices furniture for government officials and the Consultant Staff
 
Government official Office
 
Large desk and desk chair +4 chairs + center table + corner table.
 
Project Manaqer Office
 
Large desk and desk chair+ 2 chair + Sofa set number 4+ center table + corner table + Documents cabinet.
 
su  ervision en  ineer or surve   or materials  en  ineer Offices: Desk and desk cha 「i + 2 chairs + corner table + Documents cabinet A small desk and cha 「i + Documents cabinet
Laboratory
 
Office and Office Chair + 2 chairs + Documents cabinet  
FOR  TENDER ONLV
2 2 OCT 2012 PAR.
,,, .  .   .. .,.,,, L-
TESOOIN M.E. Ltd.
Page 1 of 2
 
Meetinq Room Table+ 8 Chairs
Kitchen
 
12 ft Refrigerator +2 Flame Cooker+ Plates Cabinet+ Cooking and plates tools to serve the supervision staff (minimum number of 6 people)
 
All offices are air-conditioned SPECIFICATION FOR SIGN BOARDS
The specification of the sign board shall be in accordance with the drawing that is enclosed in Contract Drawings Vol. 4.
 
1. The Bills of Quantities he 面 n, including all notes and instructions shall form an integral part of the CONTRACT. However, the descriptions contained in the Bills of Quantities for each item are not necessarily complete. The CONTRACTOR is referred to the CONTRACT and APPENDICES, SPECIFICATIONS and DRAWINGS as well as the relevant Standards and Codes of Practice for further information, as no claim or VARIATION will be considered on account  of the Contractor's failure  to do so.
 
2. The CONTRACTOR shall familiarize himself with all documents comprising the CONTRACT including, but not limited to, the DRAWINGS and SPECIFICATIONS (o 「 any other information that can be reasonably inferred from any of them)  and  all obligations contained  in  the CONTRACT shall be included in the rates and prices entered herein, even if specific items relating to such obligations are not listed in the Bills of Quantities.
 
3. The CONTRACTOR'S unit rates shall be fully inclusive of the work described and must include all related work, accessories or consumable materials , incidental labou 「 , supervision, administration, tools, construction equipment, overheads,  profit and all costs and expenses  that may be required for the completion of the work described, together  with all costs and expenses in complying with all
genera「l isks, liabilities and obligations set forth or implied in the CONTRACT
 
4. DRAWINGS, SPECIFICATIONS and Bills of Quantities and all other CONTRACT Documents a 飛complementary and if any item is included in any of them, it shall be deemed included in all,
 
5. The CONTRACTOR'S lump sum price for the entire WORKS shall provide for the superv 閣 on of any or all t「 ades that are not intended to be performed with his own forces. No extra compensation for services as a General CONTRACTOR will be paid.
 
6, The lump sum amount entered by the CONTRACTOR  in  the Bills of Quantities shall constitute the entire claim for compensation fo 「 the WORKS under this CONTRACT in accordance with the conditions of contract. The WORKS shall not be re-measured  and  will be subject  to  adjustment  only as a result of VARIATIONS. The Bills of Quantities will therefore be used as a Schedule of Rates to enable pricing of VARIATIONS.
 
7. The CONTRACTOR  shall, prior to submission of his tende「, request w「itten clarification from the ENGINEER of any point he considers being a majo「 omission from the Bills of Quantities, and the ENGINEER shall issue instructions  in response to each  request.  Notwithstanding the  foregoing, the Contractor shall be responsible for ensuring that his Unit Rates and Lump Sum Price are inclusive of all discrepancies in description or quantity contained in these Bills of Quantities, as no adjustment to quantities will be made,
 
8. After submission of Tenders, it will be deemed that the value of  any  discrepancy  has  been included in the Tender sum, that all billed quantities are accepted as co 「 rect, sub 丿 ect to any adjustments  instructed  by the ENGINEER. Consequently,  no claim whatsoever will be entertained in respect of any discrepancy between individual Documents comprised in the CONTRACT.
 
9. The CONTRACTOR is required to check the numbers of the pages of the Bills of Quantities and should any be found missing or in duplicate or the figures or writing indistinc,t the CONTRACTOR shall  notify the  ENGINEER  at once and have the matter rectified before  the date of submission of
Tenders.  No  Liability  whatsoever  will  be  entertained  in  respect   of  a  y  c aim   or  error 1
CONTRACTOR'S  tender resulting from failures to comply with the foregoli: LY
 
10. Unit rates may be used reciprocally in the settlement of accounts unless conflict between them occurs. The CONTRACTOR is, therefore, to ensure that identical items occu 「 ring  in separate Bills are not priced at different rates unless this is his  deliberate intention.
 
11. The Bills of Quantities have been measured generally in accordance with the Rules of POM (I) (as here below defined). In any case in the Bill of Quantities where the  method  differs,  then  the method expressed must be accepted and measured in accordance therewith. Notwithstanding the above, the following Pricing P「 eambles are offered only as an amplification or clarification to billed descriptions.
 
12. Items in the Preambles Section of  these Bills of Quantities are deemed  to qualify and  to form part of every description of measu「ed work to which they refe「 including composite descriptions.
 
13. The CONTRACTOR shall not use the Bills of Quantities as a construction programme or for the purpose of ordering materials or a「 ranging SUBBCONTRACTS. The references for these activities shall be the DRAWINGS, SPECIFICATIONS and instructions issued by the ENGINEER.
 
14. Should the CONTRACTOR consider any further items to the items described in the Bills of Quantities are necessary to complete his pricing then he should identify these  items and include them in his offer.
 
15. Any error in description or in quantity o 「 in omission of items from the Bills of Quantities shall not vitiate this CONTRACT nor release the CONTRACTOR from the execution of the whole  or  any  part of the WORKS comprised therein according to the DRAWINGS and  SPECIFICATIONS  o 「from any of his obligations or liabilities unde 「 the CONTRACT. Any error in or omissions from the Bills of Quantities shall not be corrected by a VARIATION  issued by the ENGINEER
 
16. Lump Sum shall not be given where unit rates are applicable
 
17. Amendments shall not be  made to the Bills of Quantities without the ENGINEE  written permission
 
18. In add 仆 ion   to  common abbreviations, the following have been adopted:
 
 
POM (I):
 
 
 
 
STM: BS:
 
PRINCIPLES   OF   MEASUREMENT (INTERNATIONAL)    FOR    WORKS  OF
CONSTRUCTION dated June 1979 and published by the Royal Institution of Chartered Surveyors, London
 
American Society for Testing Materials. British Standa「d,
 
Dia: diameter
 
Hr hou「
 
mm: millimetre
 
m; meter
 
m2: square meter
 
m3: cubic meter
 
No./Nr.: Number
 
Kg: kilog「am
 
Sq: squa飛
 
Ref: reference
 
PC Sum: Prime Cost Sum
 
PS: Provisional Sum
 
LS: Lump Sum
 
19, Rates shall be comprehensive and include for, but not be limited to, the following:
 
(a) All obligations imposed by the CONTRACT.
 
(b) Complying in every respect with the requirements of the CONTRACT
 
(c) Labou 「 and all costs in connection.
 
(d) Materials and goods and all costs in connection, including samples
 
(e) Fittings and fixing materials and goods in position including hoisting to any height
 
(f) Use of scaffolding, plant, equipment and tools
 
(g) Any additional labours usually associated with measured items.
 
(h) Establishment and overhead charges and profit.
 
(i) Laps, waste and trade or any allowance.
 
20. The pricing of materials shall take account of the following:
 
a. PRICING PREAMBLES and SPECIFICATIONS shall apply reciprocally between sections of the WORKS unless otherwise described.
 
b. Materials shall be of the quality specified unless otherwise directed by the ENGINEER.
 
c. All materials shall be transported, handled, stored and fixed in accordance with the printed instructions or recommendations of their manufacturers or suppliers.
 
d. Protection of completed work, all casings and temporary coverings and  making  good, cleaning and polishing and clearing away upon completion
 
21. Where the word "allow" is used, the cost of such item shall be the responsibility of the CONTRACTOR.
 
22. The amounts set against any items of profit shall include for all costs in connection with letters of credit, bank charges, interest charges and insurance after the materials come under the control of the CONTRACTOR.
 
PilinA / Secant piles:
 
Unless detailed otherwise, rates for piling shall include the following:
 
1. Cost of carrying out structural calculations and obtaining approval from local authority and the Engineer ,
 
2. Mobilization of piling equipments.
 
3. Setting up plant at each pile position including any levelling or site preparation required.
 
4. Supply of all materials including concrete, steel reinfo「cement,etc
 
5. Provision of testing equipments and carrying out the specified tests.
 
6. Cutting back piles to the formation levels and bending steel into pile caps.
 
7. Dc-mobilization of piling equipments.
 
Excavation and earth Works
 
Unless detailed otherwise, rates for excavation and earth works shall include the following:
 
1 Increase 1n bulk.
 
2. Excavation in any material including「ock.
 
3. Upholding sides of excavation with timber or steel sheeting o「 any other means.
 
4. Keeping excavation free from water
 
5. Backfilling where required with approved material compacted  as specified and  approved by the Engineer, all to reach the specified finished levels. Any loss in volume due to compaction and for additional materials required due to penetration  of the filling materials into the ground or any settlement o「 compaction of the original ground levels unde 「 the weight of the materials or due to methods of compaction or construction  traffic shall be accounted for in the rates,
 
6. Disposal of surplus materials to areas designated by Municipality and as approved by the Engineer.
 
7. Forming temporary spoil heaps where required and multiple handling.
 
8. Levelling  and  compacting   the  bottoms  of  all  excavations  to  receive  concrete  or  othe「 construction.
 
PRICING PREAMBLES FOR WATER WORKS
 
1. General
 
The Scope of Work, Specifications, Schedules of Prices and Drawings do not necessarily cove 「 all items to achieve the 「 equirementsof the AGREEMENT. The AGREEMENT rates, however, shall be deemed to include all costs to execute the specified works and all related works, which an experienced CONTRACTOR shall reasonably foresee. Costs of items described or implied in the Specifications and not specifically mentioned in the Schedules of Prices shall be deemed to be included in the rates and prices of other items.
 
Descriptions offered by ADDC/ENGINEER  shall be for  guidance  only. The CONTRACTOR  shall be fully responsible for determining items and quantities as necessary for reaching the lump-sum prices required for performing all the CONTRACTOR's obligations under the AGREEMENT .
 
The CONTRACTOR shall be deemed to have included in his sums for all waste, bulking or compaction factors, dewatering, over pulling and all other like elements or operations required to complete the WORK(S), including all necessary measures to protect or preserve adjacent work or property during such operations, in accordance with the provisions of the AGREEMENT
 
Should any new areas of work transpire which ADDC/ENGINEER consider not envisaged as being part of this AGREEMENT, quantities shall be measured by ADDC/ ENGINEER.
 
The CONTRACTOR shall be given the opportunity, in such cases, to be present during the measurement. Prices for the new work, if any, shall be mutually agreed between ADDC/ENGINEERand  the CONTRACTOR.
 
No request shall be considered for an increase in the unit rates on the grounds that they shall be inadequate to carry out additional wo「k of a similar nature.
 
The CONTRACTOR shall be required to complete, in full, his pricing inclusions in the columns provided as listed in the Schedule of Prices. Items not priced by the CONTRACTOR shall be deemed to be included elsewhere.
 
Prices shall be quoted for each item, even when the quantity of that item is zero. This will enable variation order for unforeseen changes to route o 「 for unexpected obstacles to be priced. TENDERERS are cautioned in respect of the prices quoted for unit rates, as these will be taken into account during the evaluation of the submitted offer and excessive values will not be tolerates
 
The CONTRACTOR shall be deemed to have included for all the necessary information, details, clarifications or drawings and documents of the CONTRACT.
 
The CONTRACTOR shall be 「 equired to take all measures necessary to ensure that the whole of the WORK(S) shall be executed in such a manner so as to minimize the generation of dust and other hazards.
 
The CONTRACTOR  shall execute the WORK(S) in accordance with the specifications, drawings,
 
ADDC/ENGINEER shall have the right to remove any item from the Scope of Work due to operational o「 safety 「 equirements and the appropriate value shall be deducted from the Contract Price without any claim from the CONTRACTOR.
 
No cutting away or welding of any parts of the WORK(S) shall be pe「mitted unless with the written consent of ADDC/ENGINEER.
 
The supply of electricity and water for construction purpose shall be the CONTRACTOR's responsibility.
 
The  TENDERER's  attention  is  directed  to  the  Price  Breakdown  Summary  Sheet,  Schedule of Prices, Progress Schedule, Schedule of Cash Flow, General Conditions, Special Conditions and Requirements,  Technical Specifications and Tender Drawings,  and all these documents are  to be
「 ead in conjunction with the Schedule of Prices (Bills of Quantities) and the relevant notes on the Schedule of Prices (Bills of Quantities). Insofar as these notes on the Schedule of P 「 ices (Bills of Quantities) and Tender Drawings may affect the  execution and pricing  of the WORKS,  they shall be deemed to form part of the Conditions of CONTRACT.
 
General directions and desc 「 iptions of the WORKS and material are not necessarily repeated in the Schedule of Prices (Bills of Quantities) and reference is to be made to the relevant articles of the various sections of the Tender Document for each item of the Schedule of Prices (Bills of Quantities).
 
The TENDERER shall include but not by way of limitation all labou「, materials, tools, equipmen,t plants and appurtenances to perform all the WORKS as required for all water pipeline  work specified in these documents.
 
2. Prices
 
The TENDERER shall quote firm unit prices and based on these firm unit prices and on the estimated quantities, the TENDERER shall quote the total price for all materials C&F Abu Dhabi up to designated site stores and/or the ADDC's stores or other designated location. The C&F unit prices and total prices for all materials shall include, but not be limited to the following:
 
1. Design, manufacture, factory inspection and testing by an independent laboratory, supply, export packing and marking and all transport costs incurred until placing all materials on board the vessel, airplane or truck.
 
2. Freight from port of shipment to port of destination in the U.A.E.
 
3. Patent rights, trade marks, name or other protected rights, royalties etc.
 
4. Responsibility for any loss and/or damage until the material has been installed at the site or placed at the ADDC's storeyards.
 
5. Provision of clear on-board bills of lading.
 
6.
 
7. Dock  dues  and  port  charges,  including  import  duties  at  port  of  destination,  permits, contributions, clearance of goods through customs, off-loading and all incidental expenses
 
8. Transportation to designated stores, unloading at store and storage at stores
 
9. Checking and verifying all shipmentsreceived against shipping documents and issuing receipt and damage report.
 
10. Certificate of origin, or any other documents issued in the country of shipmen,t or those required under Laws of Abu Dhabi and the United Arab Emirates.
 
11. All expenses of the CONTRACTOR'S personnel in connection with the discussion and/or co­ ordination meetings in the ADDC's offices and/or in the ENGINEER's offices in Abu Dhabi throughout the CONTRACT Period.
 
12. The cost of marine insurance from warehouse to warehouse
 
The cost of the Third Party Inspection Authority (TPIA) shall be paid by the ADDC.
 
The TENDERER shall quote firm unit prices for all further services in connection with local transpor,t insurance, facilities  for  the ADDC/ENGINEER  and for all expenses in connection  with erection , construction or exhumation, testing, commissioning or abandonment on the basis of estimated quantities. These unit prices shall be referred to as Local Expenses.
 
The price of the Local Expenses shall include but not be limited to the following:
 
a) Loading at store, transportation from store to the site, unloading at site, handling from site storage to the point of final installation.
 
b) Complete insurance comprising marine transport insurance from warehouse to warehouse, insurance of plant, workman's compensation insurance, third party, public liability and property damage insurance, CONTRACTOR's all risks insurances etc. in accordance with Tender requirement s.
 
c) Construction, erection, installation, exhumation, testing and commissioning or abandonmetn of works and all other expenses arising until Final Acceptance of the WORKS.
 
d) All costs associated with labour and living expenses.
 
e) Cost of local transportation of any indigenous equipment and/or materials
 
f) Costs of providing transport for the supervisory staff on site to carry them from the site office to the site of the WORKS and between the site offices of the Project.
 
g) Costs incurred in providing the services of an engineer, to be made available on site at ADDC's short notice during maintenance period.
 
h) The cost of providing manuals, progress photographs in colour and/or black & white etc. as per specification or as directed by ADDC/ENGINEER.
 
i) Cost of pipeline route survey and any other survey work 「 equ 「i ed fo 「 the execution of the WORKS as per the specification.
 
j) Cost of preparation and submission of pipeline profile drawings, layout drawings, detailed drawings and any other drawings deemed necessary for the construction of the WORKS.
 
k) All  prices  and  rates  shall  include  for  preparation  of  proposals,  drawings,  engineering, calculations, documentation, etc. as shall be「equ「i ed for approval procedure.
 
I}   Any other cost or expense contingently necessary for the proper completion of the WORKS
 
The TENDERER shall quote his prices by filling in the blanks in the Schedule of Prices (Bills of Quantities) of this Section.
 
All prices quoted by the TENDERER shall not be affected by the increase in price level in any country. The lumpsum prices of those items for which a lumpsum has to be quoted and the unit prices (rates) to be entered in the Schedule of Prices (Bills of Quantities) shall be firm prices.
 
3. Scaffolding, Trestles, Ladders, Etc.
 
The CONTRACTOR shall provide at his own cost, means of access to work using scaffolding, trestles, ladders, brackets or whatever equipment the circumstances dictate with "safe" wo「king as the major consideration. Where such access shall be erected or provided for the CONTRACTOR's activities, the CONTRACTOR shall permit reasonable utilisation and use of such facilities by others executing concurrent activities provided that such permission and use shall not cause delay or unreasonable hindrance o「 interruptionof the CONTRACTOR's own operations.
 
The CONTRACTOR's scaffolding and means of access shall be erected for a period prior to commencement of the work if required by ADDC/ENGINEER and shall remain until ADDC/ENGINEER inspection process shall be satisfactorily completed. The period in either case shall not exceed one week.
 
4. Lifting Tackles, Wire Ropes, Etc.
 
All lifting tackles, wire ropes, blocks, shackles etc. including any special equipment for executing the WORK(S) shall comply with the requirements of the appropriate British Standard Specification or equivalent and carry a valid test certificate. Under no circumstances shall chain slings be used.
 
Where there shall be a possibility of damage to material equipment, or its deformation due to slinging from more than one point, ample strutting shall be p「 ovided so as to ensure that perfectly vertical lift shall be obtained.
 
5. Climatic Conditions
 
The CONTRACTOR shall be deemed to have allowed for all effects on the execution and progress Of WO「k s occasioned by climate and prevalent conditions and with specific reference to periods of high humidity and the incidence of wind/air borne dust occurring naturally.
 
Page 4 of 28
 
6. Removal of Debris
 
Accumulated debris or unusable materials shall be removed by the CONTRACTOR to a suitable location off site designated  by Municipality.  The cost of  cleaning  up and removal  shall be deemed to be included in the CONTRACTOR's rates.
 
7. Land Cutting and Filling
 
Where 仆 is necessary the part or all of the project area shall be levelled by means of balancedcut and  fill  with  use  of  the  original  materials  and  the  Contracto「  shall  adhere  to  the  following procedure:
 
a) The Contractor shall survey the original topography of the designated area and provide cross-sections at 25 m intervals and as directed at site by ADDC/ ENGINEER.
 
b) The said area shall be refe「red to a suitable fixed local temporarybenchmark and the cross­ sections shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the future preparation of cross-section profiles after completion of the land cut/f曲 ng operation
 
c) On completion of land cut/filling a 「 esurvey of the designated area shall be made along the same cross-section grid to establish the finished profile and levels of the site as pe 「 the Contract Drawings.
 
d) All elevations shall be referred to the contract datum.
 
The rates and prices for the CONTRACT shall include all costs related to leveling of the pipeline route area by means of the balanced cut and fill that shall be carried out prio 「 to commencement  of excavation fo 「 layingthe pipes.
 
It shall therefore be the TENDERER(S)  sole responsibility to ensu「e that all the necessary information in this respect are duly gathered by him on site prior to establishing his rates and prices for the CONTRACT.
 
8. Embankments
 
In low lying areas where the balanced cuVfilling of the land can not be applied, it is necessary that the pipeline be laid in embankments/bund constructed  from approved imported  fill mate「ials, the CONTRACTOR shall adhere to the following procedure:
 
a) The   Contractor   shall   survey  the   original   topographical   contou「  along   the  proposed centreline of the pipeline and p 「 ovide cross sections at 10 m intervals, or as directed at site by ADDC/ENGINEER.
 
b) The said contour shall be 「 eferredto the corresponding elevation of the edge of the road or other notified refe 「 ence level and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate  the future preparation  of cross section profiles  at 1O metres intervals
afte「 constructionof the embankments.
 
All elevation shall be referred to New Abu Dhabi Datum or as instructed by ADDC/ENGINEER
 
It shall therefore be the CONTRACTOR's sole responsibility to ensure that all the necessary information is duly recorded and certified by ADDC/ENGINEER, prior to the commencement of any work which, for purpose of any payment,  may require compliance  with  the  above mentioned
procedu 飛
 
If the existing surface level is found to 「 equire filling under the pipe in order to give a minimum cover of 1000 mm on top of the pipe, such filling shall be executed to the requiredbottom level of the pipe.
 
The supply, placing and compaction of imported fill material shall be measured per cum as placed into position after compaction.
 
9. Surveying
 
Surveying work shall be carried out in accordance with the relevant specifica tion, clauses and drawings. The cost for such work shall be deemed to be included in the rate of  the  respective  items. Surveying  work shall include, but not be limited to, the following:
 
a) All labour, equipment and materials necessary for the survey and pegging out of  the pipelines and other structures and installations.
 
b) The surveying of the most suitable route bearing in mind the construction and site operating requirements, including trial hand excavation to locate existing unde「ground services etc
 
c) Any deviations or changes from the route or locations shown on the Tender Drawings whether  necessitated by local conditions  or by ADDC's/ENGINEER's requirements
 
d) The pegging out with approved conspicuous pegs at such intervals that when standing  at any peg, both the preceding and following pegs are in view, including maintenance and protection of the pegs.
 
e) The installation or marking and maintenance of a reference benchmark(s) on site, referenced to established site datum, as instructed by ADDC/ENGINEER.
 
f) The preparation of survey route cross section and profile drawings giving all necessary elevations, dimensions and data,「elatedback to the reference benchmark.
 
g) The provision of all necessary assistance, equipment transport etc to ADDC/ENGINEER as specified elsewhere.
 
10. Precast Concrete Items
 
Cost for all required precast concrete items and related works shall be deemed to be included in the rates of the respective items. Cost fo 「 precastitems such as, ARV and valve spindle protection chambers, marker posts, pipe sleepers, pipeline protection slabs, paving elements, kerbstones etc, and shall also include fo 「 the provision of samples if required of each precast item for quality review and approval, and for storage, handling transport, installation in position etc
 
The rates fo「 the chambe「 and valve spindle protection chambe「 shall be per unit and shall include for the supply and installation of all ancillary items as for reinforced concrete chambers.
 
Cost for marker posts shall include for stainless steel plates, painting, markings etc as detailed on the Tender Drawing.
 
The provisions of this clause shall apply equally to proprietary plastic protection or marker boards if approved as an alternative to precast concrete slabs.
 
Cost for paving elements such as concrete slabs, interlocking blocks or pavers etc, shall be inclusive of all retaining kerbs, haunching, bedding, jointing etc.
 
11. Discount
 
If a discount is offered by the CONTRACTOR it shall apply to all Schedules of Prices through establishing the discount percentage in respect of the relevant Agreement price and then applying this percentage to each of the items in the Schedule of Prices. Whenever a general discount is offered affecting the prices, the percentage of such a discount with respect to the total value of the schedule of prices shall be applied to all the items pro rata. Re-adjustment of the prices in any other  manner will not be acceptable.
 
12. Quantities And Rates
 
All the quant 仆 ie s stated in the Schedule of Prices (Bills of Quantities) shall be treated as approximate only and are given to provide a common basis for tendering. The basis of payment shall be the actual quantities of supplied and installed material and works carried out, as measured and accepted by the ENGINEER or his representative and valued at the rates or prices quoted in the Schedule of Prices (Bills of Quantities).
 
The CONTRACTOR shall prepare detailed construction shop drawings based on the CONTRACT Plans  and as directed by the ENGINEER.  The CONTRACTOR  shall  carry  out extensive   field
 
Pag e 7 of 28 TEBOOtN M.E. Ltd.
 
investigation and consider all existing conditions and obstructions for the preparation of shop drawings. Shop d 「 awings should in addition incorporate all required revisions to the CONTRACT Drawings including, but not limited to additions, deletions or route changes of the proposed lines  as directed by the ENGINEER.
 
The CONTRACTOR shall assess the preliminary quantity of materials to complete the WORKS based on the CONTRACT Drawings or shop drawings as considered appropriate by the CONTRACTOR to ensure procurementof materials as early as possible and as demanded by the CONTRACTOR's   construction   time   scheduling.   The   CONTRACTOR's   proposed   materials procurement list identifying the items and quantities should be submitted to the ENGINEER fo 「assessing the availability of 「f ee-issuematerials from the ADDC's con 「t acts and/or ADDC Stores, prior to ordering the materials.
 
The ADDC may supply certain materials as free issue from other contracts and/or from the ADDC stores, if such items are available as surplus. Prior to ordering the materials, the CONTRACTOR shall explore the availability of these free issue materials with the ENGINEER. If it is established that part of the materials are available for free issue, then the ENGINEER will issue the appropriate instructions to the CONTRACTOR for the CONTRACTOR to make a「「angementsto collect the materials and incorporate them into the WORKS. Such material will be in lieu of the materials to be supplied unde 「 BOO No. 1 and shall be transported/constructed/installed in accordance with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) fo「Construction and Installation.
 
After completion of the above steps, the CONTRACTOR should assess the quantities of the remaining materials required to complete the WORKS and, as soon as material data sheets are approved, should proceed with ordering the 「 emaining materials after accounting the free issue items and quantities. To lessen the possibility of procuring surplus materials, which may not be actually required for the WORKS, the CONTRACTOR should finalise and get approval for the shop drawings in a timely manner, prefe「ablyprior to ordering his materials
 
Payment for the CONTRACTOR supplied materials will be made only for the measured installed quantity. If there has been a 汜 vision to design ordered by the ADDC after approval of the shop drawings and after ordering the materials, consideration will be made on paying for the resulting surplus materials based on the ADDC's and/or ADDC's acceptance of a properly documented claim.
 
The responsibility for assessment of Materials Quantity is  with  the  CONTRACTOR CONTRACTOR does not have to wait for either processing his shop drawings or quantity authorisation by the ADDC and/or ENGINEER, for ordering materials once the  material  data sheets are approved. Any material that becomes surplus, due to over estimation by the CONTRACTOR will not be paid for and such materials will be the property of the CONTRACTOR
 
It shall be the CONTRACTOR's sole responsibility to orde 「 a certain amount of material necessary for the uninterrupted completion of the WORKS to compensate for material losses due to cutting of pipes , wastage, at no extra cost to the ADDC
 
The TENDERER shall include extra costs, if any, associated with part ordering of materials.
 
TEliODIN M.E. Ltd.
 
A separate price or rate shall be entered for each item of the Schedule of Prices  (Bills of Quantities) in figures. Items against which no price or rate is entered will be deemed to be covered by rates or prices of other items of the Schedule of Prices (Bills of Quantities). No new items shall be added to the Schedule of Prices (Bills of Quantities) nor shall any alternatives be made thereto.
 
In case of discrepancy between the quoted unit rate or price and the total amount for any item of Schedule of Prices (Bills of Quantities), the unit rate or price shall be binding
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of all costs incurred in any manner whatsoever in complying with the provisions of the Tender Documents , whether or not such items are specifically described in the Schedule of Prices (Bills of Quantities), including all labou「 cost, testing of materials by independent  laboratories, temporary works, erection, testing and commissioning, maintenance, insurance, taxes, duties,  every incidental and contingent cost and charges whatsoever.
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of the cost of all ancillary work and materials not separately mentioned in the Schedule of Prices (Bills of Quantities), but which may  reasonably  be implied to be necessary by the Specification,  Schedule of Prices (Bills of Quantities) or Drawings, or reasonably be inferred to be necessary there f「om, or which are usual or essential to the completion of the WORKS.
 
The prices and rates inserted in the Schedule of Prices (Bills of Quantities) shall be the full inclusive value of the work described under the several items, including all costs and expenses which may be 「 equired in and for the construction and installation of all the work described completely , together with all general risks, liabilities and obligations set forth or implied in the Tender Documents.
 
The rates quoted in the Schedule of Prices (Bills of Quantities) shall include for all costs and shall be deemed to be complete in all respects conforming to the Tender Documents and normal acceptable construction practices fo「 all the WORKS until the date of Final Acceptance Certificate.
 
The work shall be measured net as executed and erected on site unless otherwise specified.
 
All materials brought onto the site by the CONTRACTOR in accordance with the approved shop drawings are the ADDC's property and shall be in CONTRACTOR's custody fo 「 erection and installation.
 
The  ADDC  may provide certain materials  from ADDC's  stores and/or from ongoing  projects for
inco「poration in the WORKS. Such material will be in addition to or in lieu of the materials to be supplied unde「 BOQ No. 1 and shall be transported/constructe/dinstalled in accordance  with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) for Construction and Installation.
 
All materials ordered by the CONTRACTOR before the free issue of certain materials by the ADDC and become surplus due to the free issue, shall be assessed by the CONTRACTOR prior to their shipment to the U.A.E. and returned/deliveredby the CONTRACTOR directly to the ADDC's stores and/or other designated stores at no add仆ion al cost to the ADDC.
 
TEBOO,N  M.E.. Ltd.
 
All unused free issued and/o 「 approved surplus materials shall  be  cleaned/repaired at no extra cost to the ADDC, delive 「 ed and offloaded undamaged by the CONTRACTOR as and  when required by the ADDC to the ADDC's stores within 90 KM or any other place if required. The transportation cost of justified approved surplus materials will be paid in accordance with the relevant item in BOQ No. 3.
 
Should there be any discrepancy between unused free issued quantity, the approved surplus quantity and the quantity of undamaged materials delivered and taken over by the ADDC's Stores and/or other designated stores, then the difference shall be evaluated using the respective  rates and prices in the Schedules of Prices and the amount deducted from the CONTRACT PRICE.
 
13. Working Hours
 
ADDC's working hours at SITE are set out in the TENDER Documents. The CONTRACTOR  shall be allowed to work outside the site working hours and days at the disc 「 etion of ADDC/ENGINEER subject  to security  and  othe 「 rules  at  each  location.  All  extra  costs  incurred  through working
ove 巾 me shall be included in the CONTRACTOR's price. Such costs  shall include, but not limited to travel, overtime, supervision, food and all incidental expenses.
 
14. Safety Provisions
 
Unit Rates and Prices shall include for all site protection as per ADDC Safety Rules  and Regulations, T「 affic Police, Municipality, Oil Companies or other relevant Authorities, including but not limited to provision of metal screens and safety barriers and all measures necessary to protect adjacent structures, properties from the effects  of over spray, paint spatter or drainage  by impact of o「 introductioninto machinery of sand blasting material. All such measures shall be provided  to the satisfaction of ADDC/ENGINEER
 
15. Excavation and Backfilling
 
Unless specified otherwise, the rates given in the Schedule of Prices (Bills of Quantities) fo 「excavation and backfilling of trenches, foundations, etc., shall include, but not be limited to:
 
1. All labour, equipment and materials necessary
 
2. Clearing and grubbing of the site and the pipeline route and「emoval of any obstruction.
 
3. Hand or machine digging and excavation in all type of ground, not specifically mentioned under separate BOQ items, and stacking the spoil adjacent to the excavations in an approved manner. No distinction shall be made between soft, hard or rocky ground even if any of the foundation areas or pipeline routes are changed from those shown on the CONTRACT Drawings to any othe「 route w咖 n the working area of this p「oject.
 
4. Construct   and  maintain  all  ramps,   temporary  access,  safety  barriers,   signs,   lights and
diversion「oads as required by the Traffic Police, Municipality, Oil Companies or other relevant Authorities.
 
 
Page 10 of 28
 
5. Dewatering of excavations and disposal of wate「 by any means  in an approved  manner as directed by the ADDC/ENGINEER and as per the requirements of the concerned Authority.
 
6. Double or multi-handling where necessary in connection with the removal and disposal of surplus o「 unsuitableexcavated materials to a location approved by the ADDC/ENGINEER.
 
7. Working around or under and protecting any ad丿ac ent structures, pipes, cables, ducts or other existing services and structures.
 
8. Any exploratory holes, trenches, etc. that may be required to locate services o「 to test soil characteristic.s
 
9. Supply and placing of pipeline bedding materia,l levelling and compacting the bottom of excavation,s trimming and shoring sides of excavation slopes and placing  backflil in compacted layers over and around the pipeline.
 
10. Completing the backfilling in compacted layers including the provision for importing  an approved backfill material as necessary and restoring the area as directed by the ENGINEER
 
11. Provision of fencing, lighting, watching, temporary reinstatement and maintenance of surfaces other than asphalt roads, parking areas, footpaths, e tc., and every other expense in strict conformity with the Specification.
 
12. Any additional excavation for buried valves, f「i e hydrants, fittings, etc.
 
13. Should the CONTRACTOR over excavate any part of the WORKS either depth wise o「 width wise, such over excavation shall be made good with approved backfill material at CONTRACTOR's  expense.
 
14. Excavation and trenches in the existing and/or proposed roads shall be backfilled to the grade level with thoroughly compacted material approved by the ENGINEER
 
15. Removing all su 「 plus excavated material and levelling and landscaping as directed by ENGINEER
 
16. Reinstatement of road surfaces,  green areas o「 any other buildings,  structures,  pipes, cables or any other services which has been removed or damaged in order to perform the WORKS
 
17. Obtaining necessary permit to work from Oil Companies, Defence/security areas, Traffic Police, Municipality or other Authorities that my be required to perform the wo「ks.
 
18. Provision of shoring and shutting to safeguard against side collapse of excavations and trenches.
 
19. All costs with respect to disturbance of green areas not covered by the 「 egulations of the Agriculture Department.
 
Measurement for excavation, dewate「ing and backfill shall be per metre run (MR) of trenchgiving a minimum cover to the pipe of  as specified in the tende 「 docur:i罕 and is ir「espective of the
 
 
Page 11 of 28
 
TEBO,一DfN M.E. Ltd.
 
trench width for all operations till completion of the CONTRACT. Where add 仆 ion al excavation is necessary, it shall be measured for every additional 500mm depth specified, but shall only be considered valid when the continuous length of trench requiring additional excavation exceeds  thirty (30) metres at any individual location and more than one location along the excavation route shall not be measured cumulatively. Additional excavationless than 500mm shall be deemed to be included in the unit rate for excavation, dewatering and backfilling
 
Extra excavation, dewatering & backfilling required for construction of chambers, pits and thrust block s shall be included in the rates for construction, erection etc. of respectvi e items in BOO No. 2.
 
Excavation, dewatering and backf 曲 ng for any other excavation work as directed by the ENGINEER shall be per cubic metre (Cum) and as specified in the Schedule of Prices (Bills of Quantities)
 
The supply and placing of ex 「t a fill materials shall be measured per cubic metre (Cum) as placed into location afte 「 compactionand include transportof original material to a site approved by the ENGINEER.
 
In low lying areas where it is necessary that the pipeline be laid in embankmenst constructed from
approved  imported   fill   material,   the   rates  fo「  suppyl   of   fill   material   and  construction  of
embankments shall be per cubic metre (Cum). The CONTRACTOR shall adhere to the following procedure:
 
a) The CONTRACTOR shall survey the original topographical contour along the proposed centre line of the pipeline and provide cross sections at 25m intervals.
 
b) The said contour shall be related to the corresponding elevation of the edge of the road and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the  future preparation of cross section profiles at 25m intervals after construction of the embankments
 
c) On completion of the construction of the embankments a survey shall be made to determine the final contours, which shall then be plotted against the original contours to establish profiles at 25m intervals thus determiningthe final volume.
 
Irrespective of the method of measurement adopted by the CONTRACTOR, when preparing his invoices for fill material, the final quantities shall be defined from the results of the application of paragraphs a), b) and c) above.
 
It shall therefore be the CONTRACTOR's sole responsib 仆 ity to ensure that all the necessa ry informationis duly 「 ecorded and certified by the ENGINEER, prior to the commencement of any work,  which, for purposes of  any payment, shall require compliance  with  the above-mentioned procedure.
 
If the existing surface level is found to require filling under the pipe in order to give a minimum cover, as specified in the tender documen,t on top of the pipe , such filling shall be executed to the required bottom level of the pipe
 
 
Horizontally this filling shall be extended up to the nearest「oad ke「bstone, whenever this is 5m o「less from the pipeline. Unit rates for this operation shall include for the supply of suitable fill material.
 
Imported fill material required for embankments shall be measured from the existing surface level or from the bottom of pipe, whichever is the higher, up to the final road level, all as calculated from the results of the route survey mentioned above.
 
16. Concrete Works
 
The rates and prices for all concrete wo「ks shall include but not be limited to:
 
1. Any calculations, detailing and construction drawings, which in the opinion of the ENGINEER are necessary for the proper execution of the WORKS.
 
2. The supply of concrete, reinfo 「 cement, all-necessary labour, equipment and materials required fo「 the preparation, placing and protection of the concrete works.
 
3. The required excavation, backfilling, blinding, formwork, placing of concrete, compaction and vibrating and any additional formwork for the construction of joints, stop ends, building in fittings, pipes, conduits, bolts and the like, which although not specifically mentioned in the Tender Documents or shown on the drawings, are reasonably to be inferred from the specifications or  drawings  and  the ADDC's/ENGINEER'isnstruction.s
 
4. The supply and fixing of formwork and steel reinforcement in accordance with the drawings and specifications, includingall cutting, bending, fixing and provision of all necessary spac 「e bars, saddles, binding wire etc
 
5. Sampling and testing the characteristics of the concrete and concrete materials as per the specfiication.
 
6. The supply/application of protective coatings and waterproofing to cone「ete below ground or exposed to atmosphere as pe「 thespecification or shown on the drawings.
 
7. Supply and fixing of water stop at joints as per the specification or shown on the drawings.
 
In situ concrete shall be measured as the net volume shown on the drawings or variations to the drawings as directed by the ADDC/ENGINEERor his representative,sbut no deductions shall be made for  small chamfe「s,  steel work, reinfo「cement, bolt holes「equiredto be built in,  nor shall extra value be measured for splays or fillets.
 
 
 
17. Supply of Materials
 
Unless specified otherwise, the rates for the supply of all materials shall include all costs in respect of manufacturer's testing, testing by independent laboratory, C&F charges, clearance, all handling and transportation, storage, and any other costs incu「red under the obligations of the CONTRACT
 
The rates for the supply of pipes, valves, fittings etc. shall include for all lubricant, bolts, nuts, washers, gaskets, wheels, extension spindles , extension pieces, warning tapes, polyethylene sleeves, etc. and protective coatings as specified in the Tender Documents.
 
18. Storage, Warehousing, Etc.
 
The CONTRACTOR shall include for all temporary warehousing required by the CONTRACTOR to store his materials etc., in accordance with the CONTRACT, including Vendor's  storage instructions . The CONTRACTOR shall include for the protection and storage of sensitive material including pressurized and/or air-conditioned storage. The protection of all works and material shall be by the CONTRACTOR whether to installed or non-installeditems.
 
19. Pipe Construction
 
Unless otherwise specified or covered by separate BOQ items, the rates for pipe construction shall include, but not be limited to:
 
1. Supply of all labour, tools, equipment, plant and installation
 
2. The installation of polyethylene sleeve and placing of warning tape over the pipeline as per specification.
 
3. Costs for cleaning, jointing and cutting, trimming and otherv-Jise preparing the ends of pipes, hydrostatic pressure testing, flushing, disinfecting, sampling, commissioning and handing over of the completed WORKS.
 
4. All cost「elatedto collection and transportation of the water samples from site to the testing Laboratory and collection of Test results and submission to ADDC/ENGINEER's office
 
5. The water required for testing, flushing and disinfection shall be a「rangedby the Contractor at his  own  expenses.  Contractor  shall  be  responsible   to  arrange  all  ancillaries,  logistics, connections etc. for transmission of water from network point and tankers (certified for potable water) for transmission of water from supply station, if required.
 
The measurement for pipe construction shall be per metre length (MR) of pipeline including all valves and fittings, measured along the axis of the line before backfilling
 
 
20. Valves and Flowmeters
 
The supplies of gate valves and butterfly valves shall be measured per unit of each type and size. The prices for the supply of material shall be inclusive of, but not be limited to the following
 
1. A stem coupling of standard dimensions.
 
2. An extension spindle with standardised cap extending to approximately 150mm below the surface box cover.
 
3. Supply of hand wheel for butterfly valvesfor operation from inside the chamber.
 
4. Supply of bolts, nuts and washers or other approved bolt systems and rubber gaskets.
 
The TENDERER shall also include in his rates for the supply of 1 (one) number "tee" handled operating keys for every 10 (ten) valves supplied with a minimum of one.
 
The installation of valves, flow meter, flow control valves, etc. shall be measured extra over the appropriate item for installation of straight pipe for each type and size and shall include for installation of all accessories.
 
21. fittings
 
The supply of fittings shall be measured per unit of each type and size. Flanged items shall include all necessary bolts, nuts, washers and gaskets .
Should certain items described not be  available, the CONTRACTOR  shall propose  alternatives. The unit rates listed in the Schedule of Prices (Bills of Quantities) for both supply and installation shall in these cases are deemed to cover all components of any such  proposed alternative. The alternative  proposals are subject to the ADDC's/ENGINEER'sapproval.
 
The installation of fittings shall be measured extra over the appropriate item for installation of straight pipe fo 「 eachtype and size fully installed and readyfor operation.
 
22. Covers and Surface Boxes
 
The supply of D. I. or Aluminium covers and surface boxes shall be measuredpe「 unit of each type and size complete with frame.
 
The rate shall include for lettering on covers and surface boxes, coating, supply of lifting keys, etc all as pe「 specificationand as shown on the drawings.
 
The cost of installation of covers, frames and surface boxes shall be included in the cost of the construction of the「elevantconcrete s「t ucture.
 
 
23. Crossing of Oil/Gas Pipelines
 
The crossing of oil/gas pipelines shall be per crossing of oil/gas pipeline measured ex 「t a over the appropriate item fo「 the installation of straight wate「 pipelinefor each size
 
The rates for the crossing of existing oil/gas pipelines shall included but not limited to taking all precautions   and   safety  measu「es  and   compliance   with  the  owner   of   the  oil/gas  pipeline requirements and as per the specification.
 
24. Non Disruptive Road Crossing (NDRC)
 
NDRC shall be paid by meter run (MR) of pipeline to be constructed by NDRC fo 「 each diameter as described in the BOO. The length of the pipeline shall be measured along the centre line of the casing pipe.
 
A maximum time period of 35 working days will be allowed for NDRC pits (with specific fencing) to remain open. The ADDC reserve the right to deduct an amount pro rata and in accordance  with the Schedule of Prices for each NDRC pit that remain open beyond the maximum 35 working days specified. This 35 days period includes for everything necessary to complete the whole work at each NDRC pit including site restoration.
 
The unit rates for NDRC works shall include for all soil investigation necessary prior/during the NDRC work, field testing, laboratory testing, submission of design and method statement for the NDRC work, obtaining No Objection form the concerned Authorities, obtaining existing utility information, p 「 eparation and submission of detailed construction drawings, surface movement points, fencing of working area and pit locations, construction of thrusUreception pits, installation of
D. I. restrained water pipeline including restraining set (as supplied unde 「 BOONo. 1), provision of bentonite slurry, supply and installation of approved casing pipe, provision of grouting for casing pipe, grouting of annular space between the water pipeline and casing pipe,  excavation, dewatering, backfilling, pressure testing and disinfection of completed pipeline sections  and surface reinstatement  all as per the specification.
 
25. Concrete Chambers and Boxes
 
25.1 Chambers for Valves
 
The unit rates for construction of reinforced concrete watertight chambers shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved materials in compacted  laye「s,  removal  from  the  site  of  excess  materia,l  preparation  of  foundation,  all measures to protect the existing waterlines du 「 ing construction, supply of all materials complete with precast concrete cove「 slab,factory applied fully epoxy coated lifting hooks, supports for valve spindle  extension  (if  required), bituminous painting,  waterproof membrane,  asphalt  hardboard, sealing compound etc.; casting in of anchor flange and sealing flange (waterstops) as supplied in BOO No. 1, casting in of access covers, frames and surface box as supplied in BOO No. 1, bolting of aluminium ladder as supplied in BOQ No. 1, all as shown on Tender Drawing but excluding D.I pipes, fittings, sleeves, valves, water meters, and strainers.  Details  of lifting hooks, ladder, vent pipe, waterstops & valve chamber protection are shown on the Tender Drawings. All concrete works shall be according to specification
FOR TENDER ONLY
 
 
25.2 Marker Posts for Chambers
 
The unit rate for marker posts shall include but not be limited to the supply of all materials, 100mm (4") dia. hot dipped galvanised steel pipe (950mmlong, wall thickness minimum 6mm) complete with painting, concrete foundation, filling of pipe with concrete, excavation, backfilling  etc. all as shown on Tender Drawing.
 
26. Concrete Slabs For Pipeline Protection
 
The unit rates for construction and installation of precast reinforced concrete slabs for protection of waterlines shall also include but not be limited to the supply of all materials, excavation to the required level, excavation to determine  the location of the waterline, dewatering, transport to the site, placing of slabs, installation of warning tape, backfilling with approved  fill  material  in compacted layers to the required grade, all as per specification and shown on Tender Drawing.
 
27. Concrete Ducts for Waterlines
 
27.1 Circular Ducts
 
The unit rate for construction of reinforced concrete encased 450mm, 600mm, 800mm, 1000mm, 1200mm & 1500mm diameter G.R.P. ducts shall include but not be limited to submission of structural design calculations fo 「 ADDC/ENGINEER approval, p「 ovision of construction drawings, supply   of  all  materials   inclusive   bituminous   coating,  excava tion,  dewatering,   backfilling   in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
27.2 Box  Ducts and Box Culverts
 
The unit rate for construction of reinforced concrete box ducts and box culverts shall include but not be limited to submission of structural design calculations for ADDC/ENGINEER approval, provision of constructiondrawings, supply of all materials inclusive bituminous coating, waterproof membrane, asphalt hardboard, waterstops at expansion joints, sealing compound, construction of access shafts, installation of auxiliary items (covers & frames, ladders, etc.), excavation, dewatering, backfilling in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts/culverts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
28. Concrete Slab for Protection of Surface Box
 
The unit rate for construction of reinforced concrete valve spindle protection slab, shall include but not be limited to the supply of all materials, installation of surface bo x as supplied in BOQ No. 1, supply and installation of valve spindle protection tube with dust cap, excavation and backfilling all as shown  on Tender Drawing
 
 
29. Instrumentation Devices for Sector Measuring Point
 
Unit price for the instrumentation devices required at each bulk consumer and sector-measu 「 ing point  shall  be  ente「ed in  the  Schedule  of  Prices  (Bills  of Quantities)  under  separate  items  for supply and installation. The unit rate per set shall include but not be limited to the items as in BOQ No. 1 and mentioned in the specifications for bulk consumer measuring point and for sector measuring point.
 
30. Unit Rates for Manpower Equipment and Material
 
Unit rates in the Day Works Bill shall only be applied in connection with any work, as may be
requ「i ed by ADDC/ENGINEER outside the contractual agreed price.
 
Unit rates in the Day Works Bill for manpower and equipment shall be completed by the TENDERER(S) and submitted together with and as part of his TENDER. The TENDERER($) shall extend these rates and enter total amounts based on the estimated quantities.
 
Labour rates shall include all wages, bonuses, allowances, supervision, overhead cost, social premiums, profits, insurance, travel and accommodation etc. The labour rates shall also include for all hand tools and appliances.
 
Unit rates for equipment shall include the operator, fuels, lubricants, auxiliary equipmen,t service and repairs, insurance, transport, etc. The CONTRACTOR shall fill in the size and type of equipment which are not listed under this CONTRACT and which he might be 「 equ 「i ed to use in the execution of the works.
 
Reimbursement for labour and equipment usage under these rates shall only be made if the work involved is authorised or instructed by ADDC/ENGINEER against signed labour and equipment return s. It shall be the sole responsibility of the CONTRACTOR to ensure that all the necessary information is duly recorded and certified by ADDC/ ENGINEER during the progress  of  the relevant work.
 
Price s for materials supplied on unit rate basis shall include for all loading, transporting, unloading, storage, overhead and profits and all other associated costs. Prio「 approval of ADDC/ENGINEER shall be obtained for materials「equiredto be supplied for which no unit rates are ente「ed.
 
Under-utilizationor non-utilization of these unit rates shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the Contract Value.
 
31. Charges for  Disturbing And/Or Removal of Grass, Trees
 
The current regulations of the Agricultu「al Section of the Abu Dhabi Municipality dictate that before any pipe laying activities in green areas are allowed to start, charges at the current applicable rate for  disturbing,  removing  and  reinstallation  of  plantations shall  be paid  by  the CONTRACTOR
d「i ectly to the mentioned section.
 
Solely the representative of the Agricultural Section will determine the extent of affected green area.
 
The CONTRACTOR will be reimbursed the actual amounts paid, net, on presentation of proof of payment, subject to the ADDC's/ENGINEER's approval. All overheads, handling charges and all other costs involved shall be included in the other rates for local expenses. The Agricultural Section will perform removal, preservation if any, transportation and reinstallation of plantations as required.
 
The CONTRACTOR shall comply with the most recent regulations issued by concerned authorities regarding working in  the vicinityof planted areas
 
32. Reinstatement of Asphalt Road Surfaces
 
Unit 「 ate for reinstatement of asphalt road surfaces shall be measured per metre run with a maximum width of 2.0m and shall be paid as per CONTRACTOR'S quoted rate. The TENDERER's attention is drawn to Abu Dhabi Municipality Road Section regulations. The mentioned Section may order asphalt reinstatement to be carried out by specialised roadwork contractor approved by the Abu Dhabi Municipality. Contractor to price the item for reinstatement of existing asphalt road in accordance with the current practice being followed by the Abu Dhabi Municipality. The unit price  quoted  against  this item  shall  include for  mobilization/demobilization,  supply  of materials, reinstatement, protection works, detour, traffic control, warning systems, supervision by specialist consultant, main contractor's over head etc. The CONTRACTOR, while pricing this item, is deemed to be aware of the current practice and requirement of the Abu Dhabi Municipality for cut and reinstatement of existing asphalt road surfaces.
 
33. House Connection Arrangements
 
33.1 Concrete Water Meter Box
 
The unit rate for construction of reinforced concrete water mete「 boxes  shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess materia,l preparation of foundation, supply of all materials complete with 160mm diameter uPVC inlet and outlet pipes with temporaryend caps, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, transport to site, installation  of a watertight connection between 160mm diameter duct and water mete「 box, adjusting cover and frame (as supplied in BOO No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawings.
 
 
33.2 Wall Mounted GRP Water Meter Box
 
The unit rates for the supply of wall mounted GRP water meter box shall include but not limited to the supply of stainless steel fixing bolts, lettering on the box in Arabic and English, lockable main door, lockable water meter reading door, provision of key for the lockable door, etc all as per the specification and as shown on the Tender Drawings.
 
The unit rate for installation of the wall mounted GRP water meter box shall include but not be limited to the supply of all materials, installation of the GRP box (as supplied in BOO No. 1) into position, replacement of tiles, bricks or concrete that is damaged during the box installation and
「epainting of the wall as all as per specification and shown on the Tender Drawings.
 
The unit rate for installation of large radius VC bend shall include but not be limited to the supply of all materials , supply and installation of the uPVC bend into position, concrete work, bituminous painting, excavation, backfilling, end capping of the bend, supply and installation  of  protection tube, supply and installation of brass brackets, supply and installation of stainless steel fixing bolts, replacement of tiles, bricks or concrete that is damaged during the bend installation and repainting of the wall as required all as pe「 spec巾cation and shown on the Tender Drawing s
 
33.3 Concrete Stopvalve Box
 
The unit rate for construction of「einforced concrete stop valve box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, preparation of foundation, supply of all materials complete with 110mm or 160mm diameter uPVC inlet and outlet pipes with temporary end caps, bituminous painting, transport to site, installation of a watertight connection between 110mm o「 160mm diameter duct and stop valve box, adjusting cover and f 「 ame (as supplied in BOQ No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawing
 
33.4 Pulling Box
 
The unit rate fo 「 construction of reinforced concrete pulling box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess material, preparation of foundation, supply of all materials complete with 110mm o「 160mm diameteruPVC inlet and outlet pipes, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, installation of a watertight connection between 110mm o「 160mm diameter duct and pulling box, adjusting cover and frame (as supplied in BOQ No. 1) to sidewalk level etc., all as shown on the Tende「 Drawing.
 
33.5 uPVC Ducts (0 110mm & 0 160mm)
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, sealing of duct entrances with end caps, 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backf 曲 ng with approved material in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing
 
33.6 Reinforced Concrete Encased uPVC Ducts (0 110mm & 0160mm}
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, reinforced concrete encasemen,t bituminous painting, sealing of duct entrances with end caps, marking of duct ends with concrete blocks carrying the letter 'W", 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backfililng with approvedmaterial in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing.
 
33.7 7 Polyethylene House Connection Pipes with Auxiliary Items
 
Rates for installation of house connections from distribution mains up to the consumer facility shall be entered in the Schedule of Prices (Billsof Quantities) as a unit rate.
 
No differentiation is made between the installation costs for½", ¾", 1" and 1½" diamet 「e house connections.
 
The unit rate shall include but is not limited to:
 
1. All costs related to providing under pressure-tapping machines inclusive spare parts as described in the specification.
 
2. All costs related to the acceptance tests as described in the specification.
 
3. Excavation necessary to locate the existing wate「 mainfor makni g the tapping.
 
4. Excavation , dewatering, backfilling, and under pressure installation of tapping, with stopcock and coupling, including supply and installation of the wrapping of the ferrule and the saddle strap.
 
5. Excavation, installation and backfill in compacted layers for the polyethylene pipes under unpaved areas between tapping and duct and/or between duct entrances.
 
6. Installation of polyethylene pipes through ducts to water meters; or through ducts and pulling boxes to water meter boxes.
 
7. Closing duct ends after installation of polyethylene pipes.
 
8. Installation of stop valve, non-return valves, lockablevalve, water meter, fittings, couplings etc in the relevant water meter boxes, all as shown on Tender Drawings.
 
9. Supply and installation of water meter support and watertight closing of 110mm or 160mm diameter outlet holes in water meter box wall
 
10. Testing, disinfection, flushing, commissioningetc. of polyethylene pipes including supply and installation of cap (temporary) at the end of the line.
 
11. Installation of warning tape (as supplied under BOQ No. 1) above polyethylene house connection pipes in unpaved areas.
 
12. All costs related to disconnection of existing consumer connection and connection of newly installed house connection to consumer premises, including mobilisation and demobilisation costs of the house connection crew.
 
The details of the tapping machine(s), which will be used by the CONTRACTOR, shall be submitted fo「 approval to the ADDC /ENGINEER.
 
33.8 Rate for Excavation to Locate Existing House Connections
 
The rates for excavations to locate the existing polyethylene pipes and ferrules for house connections shall be per linear metre given in the relevant Schedule of Prices (Bills of Quantities). The rate shall also include the preparation of drawings and sketches showing the locations of the existing house connection lines including the position of ferrules on the distribution lines and existing consumer water meter, tanks and pumps.
 
34. Exhumation, Reconditioning and Dumping of Pipes and Acces sories
 
The unit rate for exhumation shall include excavation, dewatering, recovery of pipes and fittings, cleaning of pipes and fittings by means of brush for initial inspection and backfilling of 「t enches and plugging off any D.I. o「 A.C. lines left in the ground as directed by the ADDC/ENGINEER. Whenever these excavations are made in the existing and/or proposed roads the backfilling shall be made with thoroughly compacted material approved by the ADDC/ENGINEER to the grade level of the road.
 
The unit rate for recond 幾 ionin g shall include but not be limited to loading/unloading, packing and stacking at site stores, cleaning by means of brush, inspection of material, supply and application of coating/liningmaterial, sand blasting of material as directed by ADDC/ENGINEER
 
The unit rate for transportation of rejected pipeline materials to a Municipality approved dump site or other designated site shall include but not be limited to loading and unloading, costs related to obtaining permission of dumping on the dump site or any other designated site.
 
The unit rate for transportation of surplus o 「 exhumed pipeline materials to ADDC stores and/or ADDC approved site or othe 「 designated area shall include but not be limited to loading and unloading, prepa 「 ation for inspection, double handling, costs related to obtaining permission of dumping on the designated dump site or any other site.
 
The unit rates for collection and transportation to site ADDC free issued D.I. pipeline materials or other materials/accessoriesshall  include, but not be limited  to, loading  and unloading, multiple handling, packing and stacking, transportation to and from Contracto'rs workshop/store, cleaning by means of brush, inspection of material. The rates shall also include supply and application of coating/lining material for repairing/touch-up work upto max. 25% of the total working length/surface area of D.I. pipes and fittings and total area of other materials and accessories.
 
The quantities fo 「 the above mentioned unit rates shall be measured according to the working lengths (for example face to face dimensions for flanged valves).
 
35. Safeguarding of Materials
 
The TENDERER shall allow for all costs involved in safeguarding materials in the ground du 「 ing the period after construction and before the Provisiona l Acceptance Certification. All costs incurred in respect of insurance, secu 「 ity, fencing, lighting, watchman and such like shall be CONTRACTOR's responsib小ty, including for replacement of any materials damaged
 
36. Additional Works Due to Existing Pipework
 
The rates for the WORKS shall include for any costs incurred while liasing with the Operation and Maintenance and Field Services Sections of the ADDC in order to shut down existing live pipelines to carry out the WORKS.
 
37. Alternative Methods of Construction
 
The Schedule of Prices (Bills of Quantities) and drawings are based on an acceptable technical solution to the necessary works. The TENDERER shall price the WORKS in accordance with the specified details but he may also propose alternative details. For such alternatives a fully detailed and priced desc「iption of the work shall be incorporated with his Tende「
 
38. Provisional/Alternative Items
 
Certain items listed in the Bills of Quantities are identified as "開ovisional"or "Alternative" items. It is to be understood that these items may or may not be required to be carried out and shall require the written instruction of the ADDC/ENGINEER before being carried out. The non-utilisation of these items shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the CONTRACT value. The TENDERER shall enter prices o「 rates against these Provisional Items in accordance with other clauses of these preambles. All "Provisiona"l items shall be priced, extended and taken to the 間 evant summary for inclusion in the total price for the purpose of bid evaluations. For "Alternative" items, prices shall be mentioned in brackets, but it shall not be considered for inclusion in the totals; only the prices of the base item shall be considered for inclusion in the totals.
 
39. Rates Analysis
 
Upon request of the ADDC/ENGINEER, the TENDERER/CONTRACTOR shall produce a detailed analysis of any or all of his tendered and other rates within two working days  of  being  so requested. The rates inserted by the CONTRACTOR for the different items in the respective Schedule of Prices shall be used as basis for any additions/deletions of the respective items.
 
The CONTRACTOR shall, when directed by ADDC/ENGINEER, submit detailed supplementary schedules  breaking down  the rates for composite  units of wo「ks in the Schedules of Prices into their component elements in such detail as shall be required by ADDC/ENGINEER.
 
40. Cad   Drawings  & Word Processing  for  Specifications and Documents
 
Unless otherwise approved by ADDC/ENGINEERdrawings shall be prepared in AutoCAD drafting system conformable to ADDC GIS System in accordance with specifications. The cost items for as-built  drawings  shall  include  the  cost  of  required  prints,  transpa「encies  and  computer floppy diske ttes/CD for the same as detailed in the Schedule of Prices (Bills of Quantities).
 
The Operation and Maintenance Manual, Record Books, etc. shall be prepared as maximum as possible on MS Word or similar computer word processing
 
41. Pipeline Connection I Discinnection
 
The rate for connections / disconnections includes for additional excavations, dewatering, backfilling,  required  additional  working  hours, multiple  cuttings and  multiple  connections  in  any configuration on main and branch lines including removal of pipes, fittings, valves, flow meters, accessories etc., and transport to store, installation of pipes, fittings, valves, flow meters, accessories etc., and all associated works for each tie in point to the new pipeline
 
Pipeline connection / Disconnection shall include the items listed below:
 
The rates for these works shall include for any costs incurred in supporting/liaising with the Operations and Maintenance section of ADDC in order to temporarily shutdown or trial shutdown and carry out the Connection I Disconnection works to DI, HOPE, CS or AC pipelines.
 
In all cases the rates shall include for all costs associated with meeting the requirements of ADDC, Operation and Maintenance section of ADDC in respectof shutdown procedures and any restrictvi e timing for shutdown of pipelines.
 
The rate shall include the p「ov閣 on of lights, generator and any facility「equired for necessary works outside normal working hours.
 
The rates shall include for the provision of additional dewatering pumps and protected sump pits for the rapid removal of water during draining of the existing pipelines at the location of dewatering points.
 
The pipeline sizes mentioned in BOQ are for the main pipeline.
 
42. Construction, Installation and Commissioning of Above Ground Temporary Cs Pipeline
 
Construction of temporary above ground CS pipeline shall include for installation of all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces, blank flanges, .. 舍 etc), construction of all concrete supports,  fixing  clamps, pipe cutting, welding, fabrication, including detailed design, preparation of detailed construction drawings, method statements, protection of existing  services, provision of bank  guarantee (if required), safety measures,  additional working
 
hours,  connection/disconnection,   dewatering,   pressure  testing  and  disinfection  of constructed
tempo 「 ary pipeline to successfully commission the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
43. Construction, Installation and Commissioning of Underground Temporary CS Pipeline
 
Construction of temporary underground CS pipeline shall include fo 「 installationof all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces , blank flanges, ...etc), construction of road crossings, pipe protections excavation, backfilling, fixing clamps, pipe cutting, welding,  fabrication,  including  detailed  design,  preparation  of  detailed  construction  drawings, method statements, protection of existing services, provision of  bank  guarantee  (if  required}, safety measures, additional working hours, connection/disconnection, dewatering, pressure testing and disinfection of cons 「t ucted temporary pipeline to successfully  commission  the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
44. Removal/Dismantling and Transportation of Temporary Carbon Steel Pipeline
 
The rates and prices shall include for dismantling, removing and transportation of temporary above ground/undergroundpipes, fittings , valves and all accessories installed for the tempo「ary pipeline including any excavation, backfilling, reinstating of trenches, roads, parking and green areas, connections/disconnection,sdewatering, required additional working hours, multiple cutting, welding, handling, multi transportation, cleaning, repairing and painting where needed, and transportation of material to construction STAGE location within the project area, ADDC store and/or any other location within Abu Dhabi Island assigned by ADDC/ENGINEERas per the project plan and staging construction schedule approved by ADDC/ENGINEER to successfully complete the project scope indicated in the TENDER.
 
The payments for the CONTRACTOR will be equal  installments  for  each  STAGE  as per the project plan and staging construction schedule approved by ADDC/ENGINEER. Payments to the CONTRACTOR  for each stage shall be made only afte「 the successful commissioning of the new permanent waterline  of the intended STAGE.  The final/balance  payment  will be only made after the complete transportation of all materials used for the temporary WORKS to ADDC Store or any other location indicated by ADDC/ENGINEER within Abu Dhabi Island . All materials should be approved by ADDC/ENGINEERafte 「 inspection. The CONTRACTOR shall consider all necessary cleaning ,  repairing,  refurbishment  and  painting  of  the  materials  to  meet  ADDC/ENGINEER approval requirements.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
PROJECT: Planning and
Development of Master Plan Project No.:
Infrastructure (MPIC) for Training Summary 1 of 1
Village I Al Hafar Region
 
 
SUMMARY SHEET
 
BILL NO. DESCRIPTION AMOUNT (DH)
 
1 SITE WORK AND PRELIMINARIES
 
 
2 ROADWORKS
 
 
3 ELECTRICAL WORKS
 
 
4 TELECOM DUCTING WORKS
 
 
5 SECURITY DUCTING WORKS
 
 
6 WATERWORKS
 
 
7 STORM WATER WORKS
 
 
8 SEWERAGE WORKS
 
 
9 IRRIGATION WORKS
 
 
10 LANDSCAPING WORKS
 
 
GRAND TOTAL OHS.
 
 
GRAND TOTAL (IN WORDS):
 
 
N__O__T_E_·_
Preamble to Bill of Quantities/Scheduleof Prices is a part of this specification and should be considered with this document
 
PROJECT
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
DAY WORK SCHEDULE (DW)
 
1) Labou「
 
2) Material
 
3) Plant
 
 
PROJECT: Planning and Development of Master Plan & Infrastructure (MPIC) for T「 aining Village / Al Hafar Region
Project No.· PPC/ Day Works Plot No.
P2 PAGE NO.
 
1 of 2
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
1.01. IPART 1 · LABOURER
 
 
1.01. 1  !Labour, non-skilled
 
1.01. 2 ILabour, semi-skilled (Assisting tradesman)
 
Hour Hour
 
1.01. 3   ILabour,   semi-skilled  (Operating  light power  operated
mechanical plant vis . rammers, concrete
breakers.) I   Hou r
 
 
1.01.  4  ISurveyor
 
1.01. 5  !Chain man
 
1.01. 6  !Carpenter
 
1.01.  7   ICarpenter's Mate
 
1.01. 8 !Trade man (Working with tools)
 
1.01.  9   IConcrete finisher
 
1.01. 10 ISteel bar bender or fixer
 
1.01. 11 IWelder or burner (Where not included with Plant)
 
1.01.  12 IBlacksmith
 
1.01. 13 IBlacksmith's mate
 
1.01. 14 IElectrician
 
1.01. 15 IElectrician's mate
 
1.01. 16 IF仆ter (Not engaged on plant maintenance)
 
1.01. 17 IFitter's mate
 
Hour
 
Hou「Hour Hour Hour Hour Hour Hour Hour
Hou「Hour Hour Hour Hour
 
1.01. 18 IPlumbe 「
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engine 「e
 
DAYWORK  RATES
No work carried out on a day basis will be measured unless, before starting wo 歡 the Contractor  has obtained the written approval of the Engineer
 
2.02 IPART 2·MATERIAL
 
2.02  1  !Water, brackish Imp. Gals.
 
2.02 2   !Water , fresh Imp. Gals.
 
 
2.02  3   !Portland cement  ,  sulphate resisting portland  (with bags) 6 ton loads (metric tons)
 
2.02 4 !Reinforcing steel mild steel complying with Section V , Concrete Works (metric tons)
 
2.02 5 IPVC waterstop, complying with Section V, Concrete Works
 
2.02 6   IPreformed joint filler, 1.2cm thick, as specified I L.M
 
2.02 7   !Steel angles ,   tees,  channel sections   and plates not exceeding  6mm thickness,  (galvanised) complying with! Tons Section XII, Metal Works (metric tons
 
2.02 8   !Ditto, not exceeding 15mm thick I Tons
 
 
2.02 9   !Timber in planking and strutting ,  not exceeding 5cm thick (5cu. metre loads)
 
2.02 10 IDitto, exceeding 15cm thick (5cu. meter loads)
 
2.02 11 IExtra over timbe「 in planking and strutting left in place
 
2.02 12 !Timber in sawn formwork lining
 
2.02 13 !Lined formwork for surface texture specifiedtreatment as
 
2.02 14 IK-140 concrete delivered on site
 
2.02 15 IK-250 concrete delivered on site
 
2.02  16 IBorrow materia,l load bearing
 
2.02 17 IBorrow material non-load bearing
 
2.02 18 IRigid polyvinylchloride (PVC) conduit, 10cm d舊
 
2.02 19 IDitto, 15cm dia
 
DAYWORK RATES
No work carried out on a day basis will be measured unless , before starting wo 水 the Contractor has obtained the written approval of the Engineer
 
 
2.02 20 IDitto, 20cm dia
 
2.02 21 IPerforated Polyvinyl chloride (PVC) pipe wrapped with filter fabric, 10cm dia.
 
2.2 22 IKerb paint
 
Total CARRIED  FORWARD
 
Day Works
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 DA YWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor has obtained the written approval of the Engineer
 
 
 
3.03. 10 IConcrete mixer (5.0 m 叮
 
3.03. 11 IConcrete prams
 
3.03. 12 IConcrete hand trucks
 
3.03. 13 IConcrete finisher, mechanical
 
3.03. 14 IConcrete vibrator, petrol or electric, with stinger CRANES (PETROL OR DIESEL)
3.03.  15 IMobile road type (10 ton)
 
3.03. 16 I D八to (20-ton) - Dragline
 
Hour Hour Hour Hour Hour
 
Hour Hour
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 17 IDitto (50-ton)
 
3.03. 18 IDitto {150-ton)
 
3.03. 19 ICrane bucket (attachment) (under 1 m叮
 
3.03. 20 IDitto (5 m叮
 
3.03. 21 ICrane mounted on truck (20 ton)
 
 EXCAVATORS
 
Hour Hour Hour Hour Hour
 
 
3.03. 22 IMechanical, diesel, face shovels, skimmers, drag- lines or back - acters with single equipment
(Maker's rated capacity 0.5 m3) I  Hour
 
3.03. 23 IDitto {Maker's rated capacity 1.0 m3) I Hour
 
3.03. 24 IDitto (Maker's rated capacity 2.0 m3} I  Hour
 
GENERATING  SETS (Petrol or Diesel)
 
 
3.03.  25 IGenerating sets, complete (3 kVA)
 
3.03. 26 IDitto (10 kVA)
 
3.03. 27 IDitto (15 kVA)
 
GRADERS
 
3.03. 28 IBulldozer complete with bull or angling blade (Equivalent to Caterpillar D4)
 
3.03. 29 IBulldozer (Equivalent to Caterpilla「 06)
 
3.03. 30 IBulldozer complete with bull or angling blade (equivalent to Caterpillar 0 8)
 
3.03. 31 !Tractor type with heavy ripper (Equivalent to Caterpillar DSK/No8)
 
3.03. 32 ITrack-Type Loader , 1.15 m 3 bu c ket (Equivalent to Caterpillar 941 B)
 
3.03. 33 IWheel loader (Equivalentto Caterpillar 966)
 
DAYWORK RATES
No work earned out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 34 IDitto, 1.90 - 2.48 m3 bucket (Equivalent to Caterpillar 977 L)
 
3.03. 35 IWheel tractor-scraper, struck, capacity 16 m3 (Equivalent to Caterpillar 631 D)
 
3.03. 36 IDitto, 24.5 m3 (Equivalent to Caterpillar651 B)
 
3.03. 37 IMotor grader, flywheel h.p.-125 (Equivalent to Caterpillar 651 B)
 
3.03.  38 IDitto, h.p.-150 (Equivalent  to Caterpillar 140 G)
 
3.03. 39 IWheel loader, bucket range 1.15 -1.34 m3 (Equivalent to Caterpillar 920)
 
3.03. 40 IDitto, 3.45 - 4.20 m'(Equivalent to Caterpillar980B) RAMMERS  MECHANICAL
3.03.  41 IMechanical, power rammer
 
3.03.  42 ICompactor, (Equivalent to Caterpillar 816)
 
3.03. 43 ICompactor, vibratory type, (5000 cpm)
 
3.03. 44 IPump (submersible 2" to 6") RQLLERS (Petrol or Diesel Driven)
3.03. 45 IRubber tyre, (25-ton)
 
3.03. 46 ISteel roller, under 5 tons
 
3.03. 47 IDitto, over 5 tons
 
3.03. 48 IDouble drum sheep foot roller with tract rammer
3.03. 49 ICompactor, plate type TRUCKS  (Petrol  or Diesel)
 
 
Hour
 
 
Hour Hour
 
Hour Hour
 
Hour Hour
 
 
Hour Hour Hour Hour
 
 
Hour
Hour Hour
Hour _
Hour  
FOR ENDER 0, L V
PA .
 
3.03. 50 ILand rover or pick-up
 
3.03.  51 IPick-up (3 ton - long bed)
 
3.03. 52 IVan or similar utility vehicle (10-ton)
 
Hour Hour Hour
 
2 2 OCT 2012
.-. . ...一,
TE  OOiN M.E. td.
 
Total CARRIED FORWARD
 
Day Works
 
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 53 IDumper (1 m叮
 
3.03.  54 IDumper (4 m3)
 
3.03. 55 IDumper (8 m 叮
 
3.03. 56 IDumper (20 m 叮
 
3.03. 57 IDumper (30 m 叮
 
3.03. 58 ISelf-propelled water sprayer (1000 gal.) (including water)
 
3.03. 59 IWater tanker (3000 gal.)
 
3.03. 60 IWater tanker (5000 gal.)
 
3.03. 61 IUtility truck with 3-ton hoist
 
 MISCELLANEOUS
 
3.03. 62 IDumpy level, staff and ancillary equipment
 
3.03. 63 ITheodolite, staff and ancillary equipment
 
Hour Hour Hour Hour Hour
 
Hour Hour Hour Hour
 
 
Hour Hour
 
3.03.  64 IOxy-acetylene cutting and welding sets inclusive of oxygen and acetylene (excluding underwater
equipment) I   Hour
 
 
3.03. 65 IElectric welding set , 300 amp. including electrodes for single operator
 
3.03. 66 IDewatering equipment including pump, hoses, well points, earth drilling auger, etc. Dewaters up to 50 s.m.
 
 
Total CARRIED  FORWARD
 
Day Works
上海翻譯公司完成工程類英文翻譯

世聯(lián)翻譯-讓世界自由溝通!專業(yè)的全球語言翻譯供應(yīng)商,上海翻譯公司專業(yè)品牌。絲路沿線56種語言一站式翻譯與技術(shù)解決方案,專業(yè)英語翻譯、日語翻譯等文檔翻譯、同傳口譯、視頻翻譯、出國外派服務(wù),加速您的全球交付。 世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達(dá)流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達(dá)質(zhì)量得到很大提升”

    華東建筑設(shè)計(jì)研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動(dòng)器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強(qiáng),翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)�!�

    諾達(dá)思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時(shí)翻譯質(zhì)量和速度也得到我司的肯定和好評(píng)!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實(shí)在不敢恭維,所以當(dāng)我認(rèn)識(shí)劉穎潔以后,對(duì)她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長(zhǎng)期合作合同。”

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對(duì)我行提出的要求落實(shí)到位,體現(xiàn)了非常高的專業(yè)性�!�

    南洋商業(yè)銀行

  • “與我公司對(duì)接的世聯(lián)翻譯客服經(jīng)理,可以及時(shí)對(duì)我們的要求進(jìn)行反饋,也會(huì)盡量滿足我們臨時(shí)緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價(jià)、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)�!�

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強(qiáng),涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對(duì)完工資料質(zhì)量的抽查中,我司因?yàn)槎砦姆g質(zhì)量過關(guān)而受到了好評(píng)�!�

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評(píng)。貴司經(jīng)理工作認(rèn)真踏實(shí),特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強(qiáng)的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場(chǎng)的同聲傳譯都得到了我公司和合作伙伴的充分肯定。”

    西馬遠(yuǎn)東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對(duì)工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動(dòng)了我。不僅譯件質(zhì)量好,交稿時(shí)間及時(shí),還能在我司資金周轉(zhuǎn)緊張時(shí)給予體諒。”

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長(zhǎng)期合作關(guān)系,這家公司報(bào)價(jià)合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對(duì)方也很認(rèn)可。”

    北京世博達(dá)科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達(dá)流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非常快、后期服務(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長(zhǎng)久合作,名副其實(shí),值得信賴�!�

    北京塞特雷特科技有限公司

  • “針對(duì)我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對(duì)口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對(duì)我們提出的要求都落實(shí)到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可�!�

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項(xiàng)目報(bào)備材料。在經(jīng)過對(duì)各個(gè)翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意�!�

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達(dá)落實(shí),準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對(duì)翻譯項(xiàng)目進(jìn)行了幾次詳細(xì)的會(huì)談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對(duì)待工作熱情,專業(yè)度高,我們雙方達(dá)成了很好的共識(shí)。對(duì)貴公司的服務(wù)給予好評(píng)!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對(duì)此次緬甸語訪談翻譯項(xiàng)目非常滿意,世聯(lián)在充分了解我司項(xiàng)目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文。”

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時(shí)的完成我們交給的翻譯工作�?蛻艚�(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝�!�

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項(xiàng)目與你們相識(shí)乃至建立友誼,你們報(bào)價(jià)合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請(qǐng)?jiān)试S我們借此機(jī)會(huì)向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時(shí),中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實(shí)于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯(cuò)�!�

    TNC大自然保護(hù)協(xié)會(huì)

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象�!�

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對(duì)客戶的承諾,出色地完成了我公司交予的翻譯工作�!�

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項(xiàng)目要求時(shí)間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時(shí)間完成任務(wù)。使我們?cè)谑啦⿻?huì)俄羅斯館日活動(dòng)中準(zhǔn)備充足,并受到一致好評(píng)。”

    北京華國之窗咨詢有限公司

  • “貴公司針對(duì)客戶需要,挑選優(yōu)秀的譯員承接項(xiàng)目,翻譯過程客戶隨時(shí)查看中途稿,并且與客戶溝通術(shù)語方面的知識(shí),能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量�!�

    日工建機(jī)(北京)國際進(jìn)出口有限公司

精品天天做天天爽夜夜爽人妻爽| 国产成人av一区二区三区中文精品| 爱丫爱丫影院电视剧免费| 最新av网站网址免费观看| 国产一区二区三区三州在线观看 | 在线观看免费的AV网址| 国产又黄又爽的免费视频| 成码无人av片在线电影软件| 永久免费毛片久久99| 亚洲av成人在线观看| 性欧美亚洲第一综合天堂另类专| 亚洲一卡2卡三卡4卡127.0.0.1| 国语对白久久精品视频| 日韩2022中文字幕| 国产三级片大全网| 久久黄色高清视频。| 老赵揉着粉嫩的双乳太舒服了秀婷| 高清少妇欧美中文| 精品免费一区二区爱| 尊龙凯时·(中国区)人生就是搏!| 狼友久久国产精品| 亚洲aⅴ女人的天堂在线观看| va中的国少妇偷人HD| 免费AV无码不卡在线网站| 亚洲国产欧美在线播放| 国产精品香港三级国产| 国产精品有码无码脛∨在线 | 大香蕉久久综合在| 无码不卡毛片视频免费播放| 欧美一区二区三区18禁| 国产毛多水多女人A片色情| 亚洲中文字幕不卡无码| 欧洲精品aaa一区二区| 黄色a级视频免费播放| 俺也去精品视频在线观看| 91香蕉视频一区二区在线观看国产b站视频 | 无码人妻侵犯一区侵犯| 无人视频免费观看免费视频| 黄色美女免费| 男女十八禁啪啪无遮挡床震窝窝地| 精品国产网红主播在线观看| 日韩精品一区二区在线观看视频| 午间影院又黄又粗又大| 亚洲人妻久久无码| 国产日韩综合一区二区性色?Ⅴ | 无码粉嫩小泬久久久| 欧美极品jizzhd欧美仙踪林| 在线不卡一区二区三区免费| 日本大乳高潮视频在线观看亚洲欧美人成人让影院 | 日本香蕉视频在线观看| 成年人视频久久免费| 亚洲全部无码中文字幕| 欧美成人国产精| 国产精品免费久久久久影院周| 国产精品成人嫩草影院| av午夜福利精品一区| 91精品国产一二三产区在线观看| 影视亚洲欧美中文| 日韩国产精品99久久久久| 网页在线观看无码高清| 日本一本一道久久香蕉男人的天堂| 成人免费在线观看高清视频| 亚洲国产自久久婷婷| 日韩免费不卡视频1| 看中国免费毛片视频| 日韩和的一区二区| 国产大尺度无遮挡在线观看 | 亚洲综合男人的天堂色婷婷| 国产小视频一区二区三区中文字幕在线播放 | 国产成人福利在线视频播放下载| 亚洲av成人片无码网站动画| 日韓三級電影在線觀看| 波多野结衣电影一区二区| 大乳爆乳无码一区二区三区| 成人午夜精品網站在線觀看| 国产黄色一级片在线观看无码高清| 中文无码一区99xav| 欧美日韩国产三级久久| 国产成人av麻豆精品| 妓女网一区二区| 亚洲欧美日韩爱爱| 无码视频一区二区三区六区| av无码三级片在线播放| 中文人妻久久| 日韩欧美人妻之中文字幕| MM131巨爆乳美女少妇动态图| 成人在线免费观看黄片| 成人久久久一区二区| 欧美jizz18性欧美色天堂综合在线 | 影音先锋国产精品天堂| 国内真实刺激对白自拍视频 | 欧美日韩性视频在线| 免费国产福利一区二区| 国精一二二产品无人区免费应用| 动漫av观看网站不卡无码| 人妻少妇精品久久人妻| 高清av中文字幕无码| 又色又爽又硬又刺激的视频 | 柳州少妇无码一区| 国产亚洲桃色| 色婷婷亚洲综合五月| 无码不卡毛片视频免费播放| 亚洲日韩精品人妻| 在线播放第一页国产自拍手机直播| 日本精品在线免费观看| va中的国少妇偷人HD| 国产日韩欧美一区二区四区| 国产97精品一区二区在线观看| 亚洲国产一级精品毛一级精品看免费视频| 日本国产我97在线| 春色 都市 亚洲 小说区| 在线综合亚洲欧美成人影院| 草莓视频免费在线看| 亚洲日产精品一二三四区| 91老师秘片黄在线观看| 成人av免费网址在线观看| 久久影院午夜未满十八勿入| 最近最中文字幕视频 | 久久精品99毛片免费| 色欲久久国产色av免费看老司| 国产黄色三级三级三级| 一区二区三区欧美午夜免费| 午夜福利男女xx00视频网站| aⅴ色窝窝男女爽爽a片| 中文又粗又大又硬毛 | 国产精品无码久久A∨不卡| 精品亚洲精品在线观看| 精品久久久久久人妻黑人| 国产精品免费久久久久影院周| 91超级好看一区二区三区| 欧美大尺度禁片露器官电影观看| 好色先生日逼的视频| 激战雪姨后厨2最新版本更新内容| 欧美综合自拍亚洲综合网| 色噜噜国产精品视频一区二区互动交流| 色天堂在线观看视频| 亚洲无码aⅴ色图| 亚洲精品国产专区在线| 国产天堂在线一区二区三区| 性国产日韩欧美一区二区在线 | 人妻蜜臀av一区二区| 国产区沙发午睡系列| 欧美视频在线观看精品一级| 少妇极品美軳人体337p| 久久久久久久久av毛片| 最新无码不卡手机在线视频| 91香蕉app下载汅api免费网站无限看| 国产精品精品综合在线网址| 亚洲特级毛片无码免费观看| 四虎影视国产免费| 国产精品无码久久AV嫩| 香蕉视频免费在线观看| 亚i洲成色在线综合网站| 青青青国产免费手机视频在线观看| 天堂成av午夜电影| AV免费不卡国产在线观看 | 女佣的味道hd中字在线观看| 国产强奷在线播放免费重| 亚洲中文字幕在线有码| 18+视频在线观看| 人妻被中出不敢呻吟A片视频| 欧洲黑白配一二三四区| 2022AV天堂高清视频在线| 黄色片久久美女啊啊啊内色| 91情侣在线精品国产| 插曲免费的视频大全影视| 189国产亚洲精品视频第1页| 日韩国产精品等最新内容!| 午夜精品一区二区三区成人| 国产乱妇乱子视频在线观看免费 | 亚洲av福利天堂在线观看| 伊人蕉影院久亚洲影院| 无码区一二区mv| 日韩精品老熟女视频网站免费观看| 韩国激情三级做爰观看极限| 成人网免费视频色呦呦| 超97视频在线免费观看| 国产精品男人在线播放| 国产亚洲精品美女2020久久| 18禁美女裸体无遮挡的网站| 午夜精品人成在线观看| 91麻豆精品国产自产91成人久久| 18进黄址app最新版| 女银行员暴行办公室| 欧美色吧久久综合| 午夜福利精品无码福利| 精性国产在线视频| 亚洲欧洲日产韩国夜夜高潮| 无码日韩中文专区视频| 黄色片久久美女啊啊啊内色| 无码不卡毛片视频免费播放| 欧美日韩最新精品一二区热热 | 亚洲午夜一区二区三区福利| 中文字幕久无码免费久久| 亚洲欧美一区二区三区69| 91精品国产一二三产区在线观看| 午夜毛片精彩毛片| 男人的天堂亚洲一区二区无码| 秋霞电影午夜伦免费观看| 男生和女生在一起打牌的很痛的app | 免费高清国语自产拍视频在线不 | 55夜色66亚洲精品| 成人免费毛片日韩毛片| 巨粗进入警花哭喊求饶| 久久精品亚瑟全部免费观看| 444kk免费看片在线观看| 双乳被快递员揉搓玩弄在线播放| 国产超碰97老师人人看| 这里只有好看的a视频| 日韩在线精品一二三区| 神马午夜久久久久久| 亚i洲成色在线综合网站| 无码熟妇一区二区| 国产成人综合在线女婷五月99播放| 一级做a爱片高潮毛片| 国产成a人亚洲精品无码性色| 桃子视频APP在线下载污| 日韩偷拍一区二区三区| 又黄又爽免又刺激费视频网站| 亚洲国产成人高清一区在线| 亚洲一区二区精品按摩| 麻豆精品国产一级| 国产精品青青草原免费无码中国| 日韩精品一级一区| 久久亚洲欧美精品一| 国产免费观看久久黄AV片| 中文字幕一二区二三| 四川少扫搡BBW搡BBBB| 一级黄片免费1999| 99久久免费只有精品国产在 | 国产天天精品视频| 一级黄色片免费观看| 国产免看一级a一片成人AⅤ| 欧美成人国产精| 国产精品午夜不卡在线观看| 91精品一二区久久无码电影| 国产曰韩ai一区二区三区| 91精品一二区久久无码电影| 91丨熟女丨丰满熟女| 激情在线日韩欧美日韩| 奇米777四色欧美精品| 不卡av在线播放| 中文字幕理论片在线高清| 亞洲Aⅴ无码乱码在线观看| 亚洲a精品无码毛片色欲av| 天天操天天曰| 综合亚洲高清国产| 亚洲色图在线视频| 国产91对白在线播放边| 无码人妻侵犯一区侵犯| 91香蕉app下载汅api免费网站无限看| 69精品久久日日躁夜夜躁| 欧美午夜福利视频| 久久久888精品视频| 美女视频黄a视频全免费观看蜜臀| 先锋影音制服丝袜| 精品综合久久久久久8888| 亚洲三区欧美一区二区在线| 欧美日韩三级在线观看| 女生奖励自己隐私越狠越安全好 | 精品无码一区二区三区少妇97| 日韩欧美精品亚洲一区二区| 一区二区三区av免费| 国产精品人人爽人人做| 国产精品看片在线| 色情无码WWW视频无码区| 18进黄址app最新版| 欧美视频第2页在线视频| 18勿看免费大片1000拍拍| 美女视频一区二区三区在线 | 日日狠狠伊人久久| 成人久久免费视频| 睡错闺蜜男朋友(高h)| 搡老女人老妇老熟女50ⅹxxx| 91精品手机国产在线GIF图片| 隔壁放荡人妻bd高清| 久久免费视频8| 99久国产久精品视频| 亚洲人成网站在线播放青春| 国产成人综合精品视频| 欧美日韩中字在线| 深夜福利视频在线一区| AV乱码一区二区三区| 性高湖久久久久久久久| 成人网免费视频色呦呦| 草莓视频APP下载官方| 国产丰满老女人A片免费观看| 国国产精品V欧美精品∨日韩| 人妻一区在线播放| 91精品无码4k岛国| 一区二区三区不卡中文字幕| 国产精品老师好紧好爽最新毛片| 免費在線一級片| 久久青青草原精品国产APP| 欧美性猛交xxxxx水多| 国产精品剧情一区二区av| av无码免费久久久精品| 成人国产一区| 三级在线观看mmm| 日本成a人片在线观看网站 | 九九爱WWW无码人成| 少妇婬乱全过自慰www| 中文字幕无码乱人妻| 日韩欧美精品亚洲一区二区| 亚洲中文字幕不卡无码| 在线观看精品一区二区三区| 久久九九青青国产精品| 国产一级A一级裸体片| 国产一二三区 韩国女主播| 老师和学生边上课边做h| 高清区一区二区在线播放| 亚洲欧美日韩制服综合| 日产精品一二三四区国产亚洲| 国产午夜视频免费观看| 中文字幕理论片在线高清| 精品国产AⅤ一区二区三区4区| 亚洲欧美一区二区三区69| 成人自拍视频在线观看| 伊人蕉影院久亚洲影院| 亚洲欧美变态| 精品人妻少妇aⅴ免费狠狠| 亚洲色图在线视频| 孕妇动漫精品国产一区二区三区| 成在线人免费视频一区二区| 绯色AV视频精品一区二区| 日本久久东京热午夜| 青青国产91久久久久| 99久久免费只有精品国产在| 狠狠久久久精品| 亚洲欧美制服专区| 久久久久亚洲精品日久生情| 污视频在线免费观看| 青青青精品大杳蕉| 免费观看又色又刺激的视频| 亚洲日本日本精品18不卡| 亚洲高清美女在线| 中文字幕 亚洲 一区二区三区| 高清免费三级毛片| 91精品国产福利久久| 国产特黄a三级三级三级| 91国自产拍在线天天更新| 亚洲综合第九十八页| 日产精品一二三四区国产亚洲| 亚洲国产制服在线观看| 色午夜天香婷婷丁香| 亚洲 综合 视频 一区| 国产av最新网址| 韩国国产一级片在线观看| 69国产成人精品午夜福无毒| 成人自拍视频在线观看| 国产成人av麻豆精品| 亚洲一品二品三品精区网站| 亚洲精品日韩专区在线观春| 秋霞在线手机国产在线| 国产黄A片免费网站免费| 夜夜操天天爽| 日本人妻最新在线中| 在线国产视频一区二区三区| 国产或人精品日本亚洲77美色| 免费真人一对一视频| 欧美大尺度禁片露器官电影观看| 电车痴汉侵犯短裙人妻| 好色先生日逼的视频| 国产aⅤ一二三区无码视频| 欧美婷婷综合| 伊人蕉影院久亚洲影院| 久久精品人妻一区二区三区一| 欧美在线免费亚洲| 中文字幕二区亚洲综合| 日本天堂影音资源在线观看| a级毛片无码真人版| 中文字幕理论片在线高清| 91超级好看一区二区三区| 国产女生自慰a级毛片| 久久久精品3d动漫一区二区三区 | 欧洲精品一二区无码人妻| 美女欧美一区二区| 免费高清国语自产拍视频在线不| 国语自产拍在线观看99网| xxxx黄色网站在线观看| 国产精品亚洲精品91| 三级日韩在线不卡| 免费播放黄色叫床露脸对白影片| 福利午夜伦理影院| 亚洲av成人片无码网站动画 | v影院一区二区三区自产不卡视频| 亚洲国产福利精品一区二区| 韩国三级在线| 日本天堂成人在线视频| 国产成人在线看片| 国产成人剧情Av麻豆嘿嘿| 国产又粗又长又爽黄又硬视频| 欧美成人专区| 日韩美女自慰又黄又粗| 久久国产福利一区二区三区| 免费+无码+国产www| 亚洲人成aⅴ在线播放橙子| 国产91九色在线| A级国产乱理伦片喂奶| 免费啪视频在线观看视频日本 | 亚洲最新无码2021| 国产美女裸乳无遮挡网站| 欧美精品第56页| 免费+无码+国产www| 无码AV中文字幕| 国产熟女一区二区三区灬| 亚洲av美女在线播放啊| 国产精品二区三区四区| 亚洲av成人片无码网站动画| 日韩一区二区三区在线看| 无码一级午夜福利区久久浪潮av | 亚洲色拍国产另类| 成人AV综合一区二区三区| 欧美日韩国产激情另类| 九色91POPNY蝌蚪新疆| 久久 久久 国内精品亚洲| 亚洲 综合 视频 一区| 久久99视频丝袜爱| 亚洲中文字幕丁香婷婷| 日韩毛片午夜在线观看| 韩国成人AV网站在线观看| 色欲?ⅴ精品一区二区三区四区| 国产精品久久成年人免费视频| 激情依依av男人的天堂| 日韩国产精品等最新内容!| 麻豆精品国产一级| 亚洲AV乱码一区二区三区按摩..| 99热在线观看免费精品| 国产日韩欧美啪啪色| 女人被添荫蒂潮喷视频| 老子影院午夜伦手机不卡无码| 欧美一区二区久久精品| 欧美国产第一区| 欧美日韩国产在线一区二| 一级理论片免费观看在线| 国产精品久久久久浪潮av| 韩国三级中文字幕HD久久精品| 丰满少妇强烈进入高清视频| 国产小视频一区二区三区中文字幕在线播放| 亚洲人成色7777在线观看不卡| 亚洲精品成人?v在线| 免费黄色资源| 天天摸日日摸狠狠添高潮喷| 国产乱婬AV麻豆剧传媒牛牛影视| 欧美日本不卡一二三区| 亚洲午夜一区二区三区福利| 成人a一级毛片免费看视频| 狠狠干2017欧美最新| 亚洲欧美精品国产电影| 草莓视频APP下载官方| 特级a毛片免费观看| 91精品无码专区免费| av无码av高潮av喷吹免费| 亚洲国产欧美在线播放| 亞洲國產歐美在線觀看| 久久无码私人网站| 国产成人精品影院网站不卡| 色网在线观看| 黄色电影免费在线| 青春草五月天婷婷欧美日韩| 国产欧美VA天堂在线观看视频下载| 国产精品亚洲自拍| 精品国产v无码大片在| 日韩精品一级一区| 国产强上视频在线观看| 国内精品视频天天在线观看| 一级?性色生活片毛片| 亚洲自拍偷拍午夜福利| 欧美牲交?欧美牲交| 亞洲國產歐美在線觀看| 女性高爱潮免费有声视频网站| 国产A级无码一级毛片| 精品国产日韩在线观看| 日本丰满护士bbw| 欧美另类癖好手机在线网| 这里只有好看的a视频| 杨幂喷水高潮在线观看视频 | 亚洲AV乱码一区二区三区按摩.. | 一级做a爰片久久毛片潮喷无码| 一级aa免费视频毛片| 久久夜色精品国产亚洲| 91探花偷偷拔套在线播放| 天堂网2021天堂手机版| 国产精品sea8视频| 亚洲av永久无码精品视色影视| 88AV葵司便利店侵犯堕落| 国产91在线中文字幕无码| k频道一区国产在线观看| 亚洲无码高清免费视频亚洲| 中文字幕人妻毛片av| 欧美视频在线观看精品一级| 香蕉国产人午夜视频在线| 二次元人物桶二次元人物免费网站 | 少妇一区二区三区精品| 成人无码av一区二区三区| 久久精品人妻中文系列葵司| 免费AV无码不卡在线网站| 欧洲黑白配一二三四区| 国精产品一区一区三区m| 精品视频在线观自拍自拍| 五月天日韩AV电影| 在线观看AV无毒网站| 丝袜ol美脚秘书在线播放 | 办公室a片在线观看| 狠狠干经典视频在线观看| 亚洲无码aⅴ色图| 亚洲AV无码国产精品色午夜久久 | 自拍欧美亚洲国产成人综合| 又黄又爽国产免费网站在线观看| 国产免费人成视频不卡顿在线播放播| 日本免码va在线看| 国产国产成人久久精品杨幂| 欧美猛少妇色xxxx久久久久| 在线观看国产高清a| 日日夜夜摸多人换着玩| av无码av高潮av喷吹免费| 餐桌下狂c亲女高辣h文| 國產精品99久久| 亚洲āv无码专区在线播放中文| 97久久一精品人妻人人玩| 加勒比在线看毛片| 日韩免费高清一级毛片久久| 性奴秘书裸侍跪趴等主人玩| 亚洲欧美日韩另类色图| 无码gogo大胆啪啪艺术免费| 免费无码AV片在线观看sm| 女人18毛片18A级水真多| 亚洲精品久久久久毛片A级牛奶| 黄人成a动漫片免费网站| 日韩黄色高清视频| 久久久免费丁香五月| 亚洲影库日韩久久久| A级成人婬片免费看无码| 亚洲欧美一区电影| 日韩精品一区二区亚洲A ∨| 黑人和少妇冒白浆了 | 国产精品亚洲日韩高清资源| 中文字幕日本a√在线| 青青草无码精品伊人久久网站| 一区二区三区不卡中文字幕| 国产亚洲乱码无码www| zayou亚洲福利一区| 成码无人av片在线电影软件| AV东京热影音先锋| 国产成a人亚洲精品无码性色| 久久精品无码亚日韩免费影视观看中文| 亞洲國產精品不卡在線電影| 99RE8国产这里只有精品| 亚洲成人一区久久| 欧美一区二区免费播放| 黄色片久久美女啊啊啊内色| 国产内地刺激性精品毛片| 亚洲成片观看四虎永久网站| 八戒影视大草原久久揄拍片| 高清免费人成在线视频观看 | 少妇的丰满3中文字幕电影| 夜夜操综合网| 有没有试过一前一后两个人| 亚洲人成网址在线观看| av无码免费高潮喷水不卡| 亞洲國產歐美在線觀看| 久久午夜福利久久网| 在线美女一区二区三区四区| 国产十五十八娇小摘花| 车子越颠进入的更深h| 男女做爰猛烈吃奶吃出乳液| 国产精品老师好紧好爽最新毛片 | 午夜视频成在线人成在线人| 91国自产拍在线天天更新| 成人A免费播放网站| 无码AV中文字幕| 水蜜桃视频污在线观看| 免费黄色小说视频| 成人午夜精品網站在線觀看| 欧美一区手机在线观看视频| 亚洲女人自熨在线视频| 成人看片黄在线观看| 91久久久韩系亚洲| 伊人查蕉在线综合| 拔萝卜免费观看高清视频下载| 浪潮国产精品久久久久?v浪潮| 一区二区放荡亚洲人妇| 久久精品国产亚洲Vā香蕉| 欧美男女精品一区二区| 亚洲第一aⅴ天堂在线观看| 人成午夜日本乱码伦视频亚洲| 国产在线播放线视频免费| 国产一区二区精品久久小说| 国产成人精品一区二三区韩国| 欧美成人精品一区二区男人看| 国产精品第页婷| 成全影视大全| 午夜毛片精彩毛片| 国产成人精品在线不卡| 人妻日韩AV无码一区二区| 亚洲色图一区二区的| 午夜国产精品福利影院| 91麻豆一区二区在线观看| 久久五月天影院| 69国产成人精品午夜福无毒| 国产精品免费播放器大全| 五月天丁香色| 国内9l视频自拍老熟女九色| 午夜福利精品视频| 美女动态三级在线| 前后夹击征服骚女完美爆| 欧美私人网站| 亚洲国产欧洲韩国高清专区| 狠狠噜天天噜日日噜视频跳一跳| 日韩无码一区二区高清视频| 国产99热在线露出| 臭小子快拔出来我是你嫲视频| 青青国产91久久久久| 日本在线一级| 草久在线视频在线观| 日韩欧美自在线观看亚洲精品福利片| 日产午夜精品一区二区播放| 精品国产午夜肉伦伦影院| 黄片视频免费国产| 丝袜在线视频网站| 亚洲中文字幕不卡无码| 后入式肏大屁股眼免费视频| 69国产成人精品午夜在线| 思思热视频精品在线观看| 国产在线视频一卡| 成人久久久一区二区| 国产免费经典三级| 欧美成人aa久久狼窝五月 | 久久国产精品一国产精| 一级黄片免费1999| 皮衣战神聂小雨1080p黑椒不打烊| 秋霞影院韩国伦片在线播放| h工口福利里番库全彩| 性欧美一区二区三区在线观看| ..亚洲综合无码一区二区痴汉| 亚洲一卡2卡三卡4卡127.0.0.1 | 三级在线观看mmm| 欧美老熟妇夜夜爽| 久久草福利视频国产| 免费综合日本中文| 亚洲视频在线观看免费一区| 国产日潮亚洲精彩视频| 成人无码h肉动漫在线观看站| 中文字幕無碼亂碼人妻系列蜜桃| 了解最新精品国产拍拍拍无遮挡| 亚洲猛男男同| 亚洲精品欧美综合久久| 日本一区二区三区作爱视频| 歐美性一交激情視頻在線| 欧美性猛交xxxxx水多| 污网站免费观看污网站| 人妻中文字幕无碼在线| 午夜福利精品无码福利| 国产亚洲欧洲无码激情在线观看| 野花日本韩国视频免费高清观看| 中文字幕 亚洲 一区二区三区| 国内真实刺激对白自拍视频 | 亚洲精品国产导航一区二区| 国产欧美精品一区二区粉嫩 | 国产午夜福利红色一片精品| 成人中文字幕亚洲乱码| 亚洲天堂在线观看免费更新| 麻豆国产一区二区在线观看| 玩弄粉嫩少妇高潮出白浆AⅤ| 青青草中国三级片| 亚洲电影激情五月激情| 亚洲黄色AV电影在线不卡| 蜜桃臀一区二区三区四区| 亚洲熟妇无码AV| 亚洲国产自久久婷婷| 欧美性色aⅴ视频一区日韩精品| 毛片无遮挡高清免费久久| 成人毛片视频亚洲| 大香伊蕉最新视频国产| 日韩精品中文字字幕有码专区 | 日本久久一区二区免费| 亞洲A∨精品一區二區三區下載 | 影视亚洲欧美中文| 一区二区毛片视频免费看| 欧美成人专区| 五月色丁香国产精品白拍| MM131巨爆乳美女少妇动态图| 亚洲日本欧洲综合| 久久精品亚瑟全部免费观看| 亚洲人成网站在线播放青春| 作爱激烈叫床视频| 91久久久韩系亚洲| 国产或人精品日本亚洲77美色| 夜夜操天天爽| 欧美一级高清首页蜜桃| 手机在线看片亚洲一区| av午夜福利一片看久久| 99久久国产综合精品尤物婷婷| 中文字幕一区二区高清精品久久久 | 暖暖www视频免费高清最新期| 熟妇av日韩不卡| 草久在线视频在线观| 日韩av中文无码人妻无码| 国产特黄色一级| 91久久打屁股調教網站| 2014AV天堂无码一区 | 91成人午夜福利在线观看国产| 综合欧美在线观看少妇| 樱花视频网站| 在线播放国产女同闺蜜| 亚洲国产午夜精品一区二区| 亚洲麻豆精品久久久| 国产精品亚洲综合每日| 亚洲日韩av一区久久精品| 欧美另类亚洲日韩精品一区二区不卡| 免费看美女无遮掩的软件| 草莓茄子丝瓜樱桃鸭脖绿巨人| 亚洲高清国产拍精品青青草原 | 国产91黑人在线| 欧美日韩aⅴ人妻| 先锋影音制服丝袜| 色网日本在线观看| 日韩2022中文字幕| 久久66热偷产精品| 跪趴着被主人狠狠调教| 人妻丰满妇岳av无码区HD | 国产偷窥熟女精品| 午夜精品福利波多野结衣| 精品..久久久久久| 99久久精品无码一区二区麻豆| 国产亚洲欧洲无码激情在线观看| 日本国产一区二区三区在线观看| 综合色久七七综合七七网站| 亚洲欧美精品日韩片| 人妖系列在线精品| 草莓视频APP下载官方| 日韩精品人妻av一区二区三区 | 中文久久三级欧美| 国产精品电影不卡无码| 精品99视频国产免费尤物| 973午夜伦伦电影论片| 无码日韩中文专区视频| 手机在线观看的国产网站| 亚洲黄片账号免费| 国产免费人成视频不卡顿在线播放播| 亚洲视频在线观看免费一区| 真实的国产乱ⅹxxx66v| 久久久精品3d动漫一区二区三区| av午夜福利精品一区| 99奇米a影色777四色在线观看| 日韩乱女乱妇熟女熟妇av| 日本欧美一区二区| 狠狠色狠狠色綜合久久第一次 | 日韩欧美国产手机在线观看| 国产成人福利在线视频播放下载| 蜜桃一区二区百万视频| 大又大粗又爽又黄少妇毛片视频| 成人丝袜18秘 视频在线观看| 国产成年男人裸j网站| 欧美成人aa久久狼窝五月| 中文字幕人妻毛片av| 国产在线高清无码视频| 中文字幕久无码免费久久| 日本精品在线免费观看| 亚洲亚洲国产精品| 青娱乐精品视频在线免费观看| 夜夜欢av一区二区三区| 婷婷六月天激情| 午夜福利在线免费看| 免费黄色资源| 国产黄色三级三级三级| 久久久久av綜合網成人| 国产第一页草草影院ccyy| 国产农民工简易窝棚嫖妓精彩对白| 丰满熟女亚洲图片综合图区| 日韩中文字幕欧美亚洲第一区| 亚洲国产日韩欧美综合在线一区二区三区 | 国产麻豆成人传媒免费观看| 中文字幕免费日韩中文中文| 美女视频黄a视频全免费观看蜜臀 国产精品免费播放器大全 | ac网站不卡免费在线观看| 狠狠躁天天躁无码中文幕| 日韩美女粉嫩小泬在线精品| 性欧美高清短视频免费| 四虎在线最新地址99| 久久精品无码亚日韩免费影视观看中文| 免费视频成人欧美精品影院| 国产热の有码热の无码视频| 亚洲人成网站在线播放青春| 中国毛片在线观看| 日韩三级黄片免费观看| 精品亚洲精品在线观看| 日本一区二区三区作爱视频| 伊人成综合网| 羞羞视频在线观看免费视频| 日本高清在线视频无码| 国产精品老师好紧好爽最新毛片| 国产精品美乳| 三级片欧美在线| 網友分享国产一区精品在线心得 | 国产精品亚洲日韩高清资源| 欧美黄色变态免费观看| 欧美亚洲国产另类在线| 久久精品囯產亞洲av麻豆色欲| 亚洲?V伊人久久综合密臀性色| 毛片女人片毛片免费二区| 欧美亚洲国产中文另类在线观看| 91精品国产成人久久久久久| 五月开心中文版在线观看| 亚洲国产激情一区在线| 三级毛片在线观看av| 91麻豆精品国产自产91成人久久| 亚洲国产欧洲韩国高清专区| 亚洲欧美日韩精品专区52| 久久美女视频黄片| 国产高清乱码无卡女大生| 无码高清在线不卡一区二区| 亚洲tv日韩tv国产tv无码综合| 亚洲欧美一区二区三区69| 韩国美女精品久久久久久| 国产精品美女久久久久久大全| 在线a亚洲v天堂网2018影| 日韓歐美一區二區三區不卡| 污视频网站日本免费| 午夜色a大片在线观看免费| 亚洲黄色AV电影在线不卡| 久久久精品3d动漫一区二区三区 | 日韩国产欧美日韩一区二区久久| 久久久7777888精品| 亚洲一区二区精品久久av女优| 美女裸体视频在线无卡黄色免费网站| 日韩人妻久久久av一区二区| 亚洲日韩精品人妻| 欧美亚洲免费播放一区| 超级极品白嫩美女在线| 亚洲性爱A不卡| 欧美丁香五月激情网| 91精品国产高清自| 亚洲一级日本在线播放| 巨粗进入警花哭喊求饶| 国产成人69天堂| 亚洲性爱A不卡| 亚洲高清国产拍精品青青草原| 日韩欧美综合在线二区三区| 四虎国产在线| 国产∨a在线观看免费| 99尹人香蕉国产免费天天拍| 在线国产网站中文字幕av| 无限看片的视频大全免费下载| 囯产精品99久久一区二区三区| 国产午夜精品草莓一区二区三区| 国产欧美久久一区| 国产亚洲欧洲无码激情在线观看| 国产无遮挡又黄又爽在线观看| 国产美女露底激情视频| 91天堂一区二区三区在线| 91伊人久久大香线蕉网站| 亚州中文字幕| 中文字幕日本a√在线| 伊人直播黄版APP入口| 国产精品99久久久久久宅男小说 | 大家都能看的免费毛片视频| 亚洲影库日韩久久久| 女人毛片免费看一分钟| 制服丝袜自拍偷拍av一区| 扒开老女人p大荫蒂warmth| 欧美亚洲自偷自偷图片| 韩国美女精品久久久久久| 性国产天堂VIDEOFREE高清| 久久免费视频8| 瑜伽裤透明全毛露丁字裤| 日韩一级色网中文字幕| 亚洲āV无码专区国产乱码不卡 | 国产精品麻豆一区二区三区v视界| 日本中文字幕视频一区欧美激情| 最近最中文字幕视频| 少妇一区二区三区精品| 这里只有好看的a视频| 55夜色66亚洲精品| 亚洲中文无码日韩A∨精品亚洲免费观看网| 国产在线高清无码视频| 国产在线看av不卡无码网站免费| 日本在线视频色综合| 国产99热在线露出| 欧洲精品高清无码一区二区三区| 在线播放亚洲黄片| 国产精品欧美日韩视频播放一区| 日韩精品视频无码一区我們每天24小時不間斷 | 国产成人AV一区二区三区| 国产91高潮流白浆在线播放un| 精品无码国产一区二区三区.闺蜜| 射射射天天射| 久久亚洲乱码一区| 一区二区人人在线| 好紧好湿好爽免费视频美女做 | 久久久久久久久av毛片| 一级免费十八岁无毛毛片视频| 欧美日韩精品第一区二区| 手机在线日本视频| 午夜激情无码| 亚洲欧洲AVAV天堂系列| 少妇白浆一区二区| 影视久久夜色国产精品噜噜噜| 无码gogo大胆啪啪艺术免费 | 双腿被绑成M型调教PⅠAY照片| 日韩精品一区国产偷窥在线| 狠狠色狠狠色綜合久久第一次 | 日韩殴无码中文字幕| 字幕大全网址撩人精品磁力视频二区| 亚洲欧美自拍唯美另类| 精品国产99国产精2021| xxxx黄色网站在线观看| 亚洲精品性美腿丝袜电影| 老司机在线永久免费视频观看| 玩弄粉嫩少妇高潮出白浆AⅤ| 激情五月久久国色天香一区| 美女图片大黄网站永久免费| 啊灬啊别停灬用力啊黑人| 114人体棚拍人体私密大尺度| 国产又黄又爽的免费视频| 99视频日韩三级电影| 久久精品国产亚洲A∨未满十八 | 亚洲国产一级精品毛一级精品看免费视频| 91xav在线免费观看| 人妻蜜臀av一区二区| 在线播放国产视频99| 亚洲国语毛片在线看国产| 一级黄色片免费观看| 黄色AAA大片免费| 国产av亚洲v天堂av| 人妻丰满妇岳av无码区HD| 黄色成人香蕉视频网站| 亚洲国产在人线播放午夜免费| 久久久精品一区二区藌桃 | 亚洲日韩成人在线| 欧美大乳中文字幕在线| 91丨熟女丨丰满熟女| 美女裸体视频在线无卡黄色免费网站| 亚洲中文无码日韩A∨精品亚洲免费观看网| 色午夜天香婷婷丁香| 91天堂一区二区三区在线| 精品在线欧美一区二区| 一级特级女人18真人片免费视频| 日本在线一区二区三区免费| 精品卡通动漫在线观看视频一区| 绿巨人聚合app入口| 97精品日韩永久性无码| 884aa四虎影成人精品| 黄色片久久美女啊啊啊内色| metart精品白嫩的asspics| 黄色美女免费| 亚洲免费成人在线| 亚洲av成人片无码网站动画| 91精品国产高清一区二区三密臀| 牛牛色婷婷在线视频播放| 精品天天做天天爽夜夜爽人妻爽| 在线播放第一页国产自拍手机直播| 97人人视频波多野结衣蜜月| 日本精品在线免费观看| 成人无码视频在线播放| 女教师一级特黄毛片| 日产精品一二三四区国产亚洲| 99精品無碼人妻一區二區三區| 精品无码久久久久国产| 午夜网站永久在线观看| 亚洲女人自熨在线视频| 狼友看视频的网站| 老师解开乳罩喂奶我脱她内| 成人自拍视频在线观看| 成人久久免费视频| 日本久久高清一区二区三区| 在线综合亚洲欧美成人影院| 无码熟妇一区二区| 日韓歐美一區二區三區不卡 | 国产一级做?爰片久久毛片野外| 淫荡人妻在线视频| 欧美一区二区亚洲成人| 国产精品美女久久久浪潮?v| 亞洲A∨精品一區二區三區下載| 亚洲视频欧美在线专区| 色天堂在线观看视频 | 日本午夜色噜噜| 污视频在线免费观看| 人妻精品久久一区二区| 国产精品人人爽人人做| 无遮挡18禁国产精品| 973午夜伦伦电影论片| 18进黄址app最新版| 亚洲精品成人一二三区| 国产性夜夜春夜夜爽1a片| 天天躁夜夜躁狠狠躁综合真实| 午夜男女后插入在线免费| 中文字幕新无码国产在线视频| 国产aⅤ一二三区无码视频| 久久精品国产亚洲A∨未满十八 | av在线免费观看高清| 6080精品人妻一区| 女人毛片免费看一分钟| 在线观看免费国产一区二区| 超碰成人在线91| 岳乳丰满一区二区三区| 春色 都市 亚洲 小说区| 高清免费人成在线视频观看| 色夜av网午夜福利片| 伊人蕉影院久亚洲影院| 高清无码免费不卡视频| 4se人人视频在线| 超碰真人在线| 亚洲中文字幕一区二区三区在线91 | 免费电影AV网站| 久久综合网欧美色妞网| 91久久久久久国产免费| 欧美韩国亚洲精品综合a| 日韩欧美精品亚洲一区二区| 免费成人三级电影在线观看| 欧美专区一区二区三区| 亞洲A∨精品一區二區三區下載| 国产精品免费播放器大全| 99热手机在线最新地址| 国产网友自拍视频| 黄色人成影院一级| 精品综合在线99亚洲青草91| 成人性毛片免费观看黄| 亚洲全部无码中文字幕| 亚洲亚洲国产精品| 五月丁香色婷婷蜜桃| 天堂av2017男人的天堂| 精品国产成a人片在线观看 | 伊人久久大香线蕉?v男同| 亚洲va欧美va国产va天堂影| 三级在线看中文字幕完整版| 无码不卡毛片视频免费播放| 中文字幕av美利坚合众国无码| 免费国产成人午夜在线观看| 欧洲亚洲成人精品| 波多野结衣加勒比| 皮衣战神聂小雨1080p黑椒不打烊| 黄色一级视频网站| 国产精品久久久久桃色tv| 丰满少妇猛烈进入无码| 无码A∨高潮抽搐流白浆8MAV| 日韩一区二区三区在线观看照片| 亚洲一级日本在线播放| 久久99成人精一区二区三区| 91xav在线免费观看| 日韩av手机在线观看| 亚洲av永久无码偷拍另类| 日本在线一区二区三区免费| 少妇挑战黑人4p惨叫| 日本高清中文无卡| 澳门精品久久国产电影| 在线观看自拍无码综合| 高潮抽搐流白浆视频在线观看| 国产内地刺激性精品毛片 | 青青草中国三级片| 久久久久久久久av毛片| 久久久久中文字幕1区| 亚洲欧美日韩免费在线播放| 日韩欧美亚洲国产精品| 欧美激情在线播放一区二区| 综合亚洲伊人午夜网| 图片区小说区另类春色蜜芽| 国产超清无码 片内射免费| 日韩欧美亚洲另类激情一区| 久久成人精品免费国产片| 看中国免费毛片视频| 国产第一页草草影院ccyy| 欧美精品青青久久久久久久久久久| 草久在线视频在线观| 国产精品久久成年人免费视频| 色噜噜国产精品视频一区二区互动交流 | 好爽快点我受不了了视频 | av天堂av亚洲啪啪久久无码| 又大又粗又爽国产色欲AV| 国产高清A片视频一| 秋霞电影午夜伦免费观看| 夜夜操天天爽| 亚洲无码免费看在线视频| 欧美jizz18性欧美色天堂综合在线| 亚洲永久免费无码打屁股| 国产乱人伦av在线a三方| 办公室a片在线观看| 国产欧美精品一区二区粉嫩| 国产精品66婷婷伊人五月| 高清 无码 自拍 日韩| 亚洲一区国产区羞羞视频| 日韩毛片午夜在线观看| 亚洲日韩AV无码中文| 入禽太深在线色网视频5| 人成午夜日本乱码伦视频亚洲| 性高湖久久久久久久久| 一区二区影院| 日韩殴无码中文字幕| a毛片免费全部播放吃 | 人妻中文字幕无碼在线| 国产精品无码一区二区四区免费| 97视频人人做人人爱免费体验| 理论片在线免费观看| 国产精品???a片在线观看原神| 今日亚洲2021在线观看| 日韩av在线在线观看| 日韩一区二区三区四区在线播放| 隔壁放荡的人妻在线看中文| 美国日本韩国精品在线| 欧美视频第2页在线视频| 夫の目の前侵犯新婚人妻| 美女我无遮挡被艹网站自慰| 国语自产拍在线观看99网| 夜色www中国精品视频网站| 亚洲丝袜在线观看| 日韩欧美偷拍精品一区| 網友分享免费福利资源站在线视频心得 | 四虎www成人影院观看| 成人亚洲欧美在线观看| 日韩黄色高清视频| 污网站免费观看污网站| 好了AV第四综合无码久久| 亚洲国产的精品太乱码一区二区| 久久五月一区二区精品| 激情婷婷丁香五月| 国产精品大白天新婚身材| 国产1区2区精品自拍| 精品国产青草久久久久福利| 亚洲va欧美a国产va综合| 欲乱人妻少妇邻居+毛片| 美女任你摸免费视频| H片在线播放免费观看| 辣妹子影院电视剧免费播放视频大全在线观看 | 丝瓜草莓www在线观看| (愛妃精選)免费无码毛片一区二区| 一级做a爰片久久毛片免费看| jizz成熟丰满老女人| 国产在线观看h尤| 在厨房拨开内裤进入在线视频| 日韩欧美一卡二区| 男女视频诱惑国产在线观看| 国产精品66婷婷伊人五月| 国产男女嘿咻视频在线| 国产91高潮流白浆在线播放un| 亚洲日本精品va中文字幕| 中文字幕新无码国产在线视频| 调教.求饶乖腿打开h| 日韩激情一级毛片| 国产精品日本欧美一区三| 久久精品aⅴ无码| 成年无码?v片在线无码精品| 黑人粗大区一区二视频 | 后入式肏大屁股眼免费视频| 高潮喷水女仆流白浆| 国产一级精品精品精品| 亚洲成人激情在线观看| 蘑菇成品人app下载| 超97视频在线免费观看| 黄色a级视频免费播放| 被男子脱掉内裤的美女视频| 一级黄片免费1999| 码 码加勒比国产在线| 人妻中文字幕一区二区不卡| 91超级好看一区二区三区| 91香蕉app下载汅api免费网站无限看 | 日日夜夜摸多人换着玩| 国产成人精品在线不卡 | 国产精品美乳| 亚洲人成网址在线观看| 欧美在线Vs免费一级片| 久久精品視頻只有這里| 歐美成人久久久| 欧美日韩国产性爱| 日韩免费无码| 欧美.久久久.精品| 奇米777四色欧美精品| 亚洲午夜一级精品| 巨粗进入警花哭喊求饶| 亚洲色图一区二区的| 精品人妻少妇aⅴ免费狠狠| 亚洲一级皇色大片蜜汁满满| 一区二区影院| 亚洲欧美一区二区在线观看| 蜜臀98精品國產免費觀看| 夜夜操天天爽| 日韩台精品电影在线观看网站免费| 国产一级A一级裸体片| 在线观看xxxx国产| 亚洲影视AV一二三| 亚洲天堂久久精品9966| 人妖系列在线精品| 国产亚洲国际精品福利| 久久精品洲AV无码四区| 草草影院欧美三级日本| 鲁丝片一区二区在线观看| 神马午夜久久久久久| 亚洲欧美变态| 国产欧美va欧美va在线动漫| 1024手机在线看片| 亚洲日产精品一二三四区| 色欲?ⅴ精品一区二区三区四区| 果冻国产精品麻豆成人av电影| 日韩精品成人蜜桃| 亚洲国产日韩欧美综合在线一区二区三区 | 91精品无码4k岛国| 免费综合日本中文| 五月丁香色婷婷蜜桃| 亚洲国产成人mv在线观看| 国产黄色在线观看.| 99久久久囯产亚洲精品观看| 日韩无码高清wwww| 一进一出把女子干的全身抽搐| chinese熟妇老女人hd视频| 蜜桃一区二区百万视频| 精品成在人线AV免费| 中文字幕亚洲无码色网视频| 歐美日韓一區二區視頻免費看| 久久久综合精品一区二区三区无码| 欧美巨大激情久久久| 中文字幕久久久久一区| 精品久久久久久人妻黑人| 99热在线观看免费精品| 国产日韩欧美啪啪色| 亚洲有码精品视频在线观看| 欧美性生活视屏精品| 色吧超碰97人妻| 国产热无码手机版| 久久毛片免费一区二区三区电影 | 国产精品男人在线播放| 久久五月一区二区精品| 成人片在线观看亚洲欧美| 无码在线视频免费| 肉色丝袜超薄一区二区三区| 久久午夜福利久久网| 色秀视频在线WWW色| 国产亚洲欧美ai在线看片| 国产精品二区三区四区| 18禁裸乳無遮擋啪啪無碼免費| 97人人超人人超碰超国产| 国产亚洲加勒比久久精品| 中文字幕久久第13页| 国产这里有精品视频互動交流| 97久久一精品人妻人人玩| 日韩中文无线码免费观看| 国产91对白在线播放边| 少妇的丰满3中文字幕电影| 日产一级毛片免费| 奇米一区二区三区四区久久 | 亚洲综合无码一区二区三区四区 | 国产免费女明星色视频| 一区二区成人免费网站大全| 韩国美女精品久久久久久| 益日韩欧群交P片内射中文| 日韩欧群交p片内射中文| 八戒影视大草原久久揄拍片 | 久久五月一区二区精品| 亚洲国语毛片在线看国产| 亚洲国产精品久久一线APP| 亚洲国产成人mv在线观看| 国产乱码人妻一区二区三区| 免费无码在线aⅴ| AV东京热影音先锋| 成人久久免费视频| 黄色一级国产精品| 乡村女教师艳妇欲爱| 久久156精品视频| 一级不卡无码免费黄片| 在线观看亚洲精品视频| 国产天堂网www在线资源av网| 三级在线免费a免费看| 狠狠躁狠狠躁东京热无码| 辣妹子影院电视剧免费播放视频大全在线观看 | 久久综合九色综合欧美婷婷| 国产三级片在线观看网站| 蘑菇成品人app下载| 无码av高潮抽搐流白浆在线| 国产毛片的高清视频| 欧美三级直播美女视频在线观看| 国产成视频在线观看| 国产成人真人片亚洲精品不卡 | 97人人视频波多野结衣蜜月 | 亚洲欧美日韩另类色图 | 欧美一级aa大片免费看视频| 日韩国产欧美一区免费观看| 黄色a级视频免费播放| 中国无码在线观看| 亚洲国产小u女在线| 成·人免费午夜无码不卡| 国产欧美VA天堂在线观看视频下载| 无码中文字幕aⅴ免费费放| 91影视在线观看| 国产高清永久免费| 精品在线观看免费一级毛片| 国产麻豆成人传媒免费观看| 色呦呦网站免费| 国产偷人视频免费观看| 国产成 人 亚洲 综合| 国产午夜一区二区在线观看m | 色情无码WWW视频无码区| 激情五月久久国色天香一区| 精品精品男人的天堂在线| 国产天堂网www在线资源av网| 国产精品欲AV麻豆网站| 久久午夜福利久久网| 日韩美女粉嫩小泬在线精品| 狼群影院中文字幕| 国内高清A自拍视频| 人妻日韩AV无码一区二区| 成人毛片免费aa级 | 二区三区精品| 狼友久久国产精品| 国产无遮挡无码免费视频在线抪| 国产特黄色一级| 午夜福利在线免费看| 黄色人成影院一级| av午夜福利精品一区| 久久人人爽人人澡人人高潮AV| 特级西西西4444大胆无码| 黄到让你下面湿的视频| 一区二区三区在线观看欧美| 日产午夜精品一区二区播放| 做爰高潮a片视频35分钟| 高清免费人成在线视频观看| 国产精品小姐久久久久久| 一区二区影院| 激情在线日韩欧美日韩| 亚洲第一天堂日韩| 日韩精品老熟女视频网站免费观看| 亚洲色图一区二区的| 国产精品免费播放器大全| 成人免费毛片日韩毛片| 亚州中文字幕不卡影院 | 亚洲精品无码av国模| 久久久久久av无码专区| 张警官撞玻璃9分10秒| av日韩色情三级在线看| 国产一级婬片免费播放电影| 国产又爽又黄免费网站| 亚洲三区欧美一区二区在线| 无码熟妇一区二区| 国产精品玖玖玖玖影院| 国产毛片久久久久久久久久久久| 亚洲AV无码国产精品色午夜久久| 日本高清在线视频无码| 亚洲一级日本在线播放| aⅴ色窝窝男女爽爽a片| 久久综合老色鬼网站| 女人十八毛片免费观| 国产精品麻豆一区二区三区v视界| 久久一区二区美女视频网| 欧美视频日韩视频国产视频| 爱情岛免费视频论坛一路线| 亚洲成熟妞人婬i片在线观看| 国产免看一级a一片成人AⅤ | 国产精品香港三级国产| 欧美成人国产精品一区二区 | 國產精品三級在線觀看| 青青草国产成人久久网| 亚洲AⅤ成人综合网伊人APP | 青青青国产免费手机视频在线观看 | 国产免费人成视频不卡顿在线播放播| 青青青国产免费手机视频在线观看 | 一区二区三区在线观看欧美| 欧美在线免费亚洲| 欧美成人做爰a片免费看美七烈| 国模欢欢销魂全过程| 鲁丝片一区二区在线观看| 成人国产经典精品视频| 2021国产高清自在线拍| 色呦呦网站免费| 成人看片黄a免费看视频| 91精品导航在线观看| 最近最新的日本中文字幕| 欧美黑人精品一区二区在线| 亚洲AV片在线观看高清小说| 欧洲美女一级牲交视频| a级毛片高清免费视频在线| 国产视频精选全网| 青青青精品大杳蕉| ddd54手机免费看| 日本中文字幕www| 被仇人狠狠开发了by小小巴士| 曰韓無碼二三區中文字幕| 免费网站看v片在线毛| 无遮挡18禁国产精品| 欧美激情自拍偷拍另类| 午夜福利精品无码福利| 中文字幕一本久久综合| 国产精品一二三级视频| 国产91对白在线播放边| 中文字幕av免费看网站| 五月丁香色婷婷蜜桃| 亚洲三级视频在线播放| 成人免费在线观看高清视频| 中国熟妇乱子hdsex粗| 欧美激情一区精品| 东热亚洲狂野欧美| 国产盗摄精品一区二区酒店等 | 国产成a人亚洲精品无码性色| 善良的嫂子高清播放完整版| 欧美在线免费亚洲| 国产欧美日本韩国高清视频一区二区三区免费在线 | 双性调教结婚每日淫训| 亚洲人妻精品综合无码专区 | 黄色成人在线播放| 国产成a人亚洲精v| 男人你懂的在线观看视频| 尊龙凯时·(中国区)人生就是搏!| 免费av中文字幕| 成人看片黄在线观看| 欧美激情在线播放一区二区| 久久无码āV中文出轨人妻| 欧洲毛片自拍偷拍网站| 91香蕉app下载汅api免费网站无限看 | 无码在线视频免费| 神马午夜久久久久久| 奶水美人双性h美人多汁| 久久成人精品免费国产片| 嫩模自慰一区二区三区动漫| 亚洲性爱A不卡| 在线观看免费的AV网址| 成人免费在线观看高清视频| 久久婷婷色中文字幕免费高清| 电影a区三区四区男人| 亚洲全部无码中文字幕| 国产精品影音先锋69| 国产精品66婷婷伊人五月| 偷拍女厕一区二区| 欧美精品青青久久久久久久久久久| a级高清毛片视频免费观看| 久久免费看少妇高潮XXX| 人妻出差精油按摩被中出| 免费国产福利一区二区| 日韩欧美高清在线播放| 虎白女粉嫩粉嫩的18在线观看| 久久156精品视频| 中文字幕久无码免费久久| 中文字幕二区亚洲综合| 国产簧片免费在线播放| 国产精品v欧美| 成人无码视频在线观看| 亚洲一级免费观看高清无码| 午夜国产一级大片免费观看| 亚洲色欲或高潮影院伊人| 阿牛影院在线观看视频| 亚洲影视AV一二三| 国产天堂网www在线资源av网| 精品综合国产亚洲欧美久久| 午夜毛片精彩毛片| 国产一级黄aa爽| 国产亚洲精品系列| 日本一区二区三区在线视频观看免费| 久久夜色精品国产亚洲| 免费无码a∨片在线观看| 久久九九青青国产精品| 国产精品看片在线| 曰本大码熟中文字幕| 免费av中文字幕| 欧美亚洲日本色图片网| 国产黄A片免费网站免费| 午夜老司机福利日韩视频在线高清| 国产成人在线免费网站| 人妻中出中文字幕資源免費看| 免费av中文字幕| 永久免费观看的片毛视频| 久久精品亚洲精品五月色| 亚洲图片视频欧美日韩| 丝瓜草莓www在线观看| 日韩免费福利一区八区| 亚洲αv无码不卡一区二区三区| 青草久久在线免费观看视频| 久久99国产精品精品国产同意| 免费A级毛卡片不收费视频| 欧美经典复古伦理在线| 在线观看午夜国产精品| 天天干天天肏| 天天被干免费观看视频| 久久久久中文字幕1区| 国产精品久久久久片免费又是看| 国产免费福利片在线视频| 色婷婷综合激情蜜桃tv| 日本加勒比麻豆亚洲精品| 黄色人成影院一级| 日韩欧美国产三级一区| 婷婷丁香性爱| 亲近相奷对白中文字幕| 一区二区毛片视频免费看 | 一区二区三区在线观看欧美| 成人高清影院| 国产福利一区二区在线观看| 国产精品一区二区久久国产抖音| 中文精品影视日本| 啊灬啊别停灬用力啊黑人| 497799欧洲版的国产suv| 日韩精品熟女AA久久毛片| 免费一级毛片在线播放放| 138亚洲福利视频一区二区| 久久艹这里只有精品| 亚洲日韩精品人妻| 奇米777四色欧美精品| 久久精品成人免费看| 大地免费资源| 在线无码无码播放视频| 最新欧洲日韩在线播放| 18禁动漫一区二区三区| 亚洲最新无码av网址| 日韩精品国产另类专区互動交流| 永久免费看黄| 欧美.久久久.精品| 国内高清A自拍视频| 在线观看亚洲欧美一区二区三区| 97久久一精品人妻人人玩| 91精品国产高清自| av高清理伦片在线观看| 午夜精品一区二区三区在线成人 | 女人18毛片18A级水真多| 精品二区三区在线观看| 国产高清在线观看AV片| 亚洲欧美中文日韩v在线在线观看| 国语对白国产精品一区| 亚洲AV乱码一区二区三区| 私人影院午夜在线观看| 亚洲精品成人国产| 天天在线观看日韩免费AV| 人妻蜜臀av一区二区| 人妻夜夜爽天天爽4区| 国产精品二区在线| 午夜网站永久在线观看| 我的好妈妈6高清在线观看| 日韩偷拍一区二区三区| 亚洲男男激情videos高清| av无码三级片在线播放| 搡老女人老妇老熟女50ⅹxxx| 日本乱中文字幕系列在线看| 日韩一二区无码精品一区| 一区二区影院| 精品一区二区三区免费在线视频 | 久久久精品一区二区藌桃| 中文字幕无?v免费久久| 无人视频免费观看免费视频| 国产黄色在线观看.| 91精品国产综合久久久亚洲日韩| 日韓三級電影在線觀看| 不卡一卡二卡在线视频黄色大片免费在线观看 | 欧美在线天堂视频不卡| 日韩欧美国产免费一二三区| 日本高清在线视频无码| 亚洲AV综合色区无码区| 欧美日韩精选在线观看| 麻豆精品国产一级| a狠狠久久蜜臀婷色中文网| 欧洲另类综合| 国产羞羞视屏在线观看| 蜜桃一区二区百万视频| 大香蕉久久综合在| 青草影院内射中出高潮 | 黑人巨大无码系列在线| 暖暖www视频免费高清最新期| 国精产品一区一区三区m| 福利姬白浆AV导航| 国产午夜福利红色一片精品| 国产偷窥成熟女精品视频| 91成人精品亚洲高清在线观看| 亚洲黄片账号免费| 在ktv上班被客人吃奶头| 国产亚洲精品成人| 91精品无码4k岛国| 老外的大狼色在线| 午夜亚洲乱码伦小说区| 亚洲影视AV一二三| 欧美在线免费亚洲| 樱花视频网站| 亚洲丝袜在线观看| av日韩在线观看一区二区三区| 丰满少妇猛烈进入无码| 福利视频日韩欧美国产| 色戒未删减2小时38分在线| 欧美一区手机在线观看视频| 国产区成人在线观看| 久久精品αⅴ无码中文字字幕不卡| 亚洲日本乱码在线观看| 精子射入几天可以着床| 亚洲av福利天堂在线观看| 成人免费a级毛片无码片在线播放| 最近更新中文字幕大全| 国产精品久久秘 A级| 欧美亚洲精品另类| 国产精品1区2区3区4级网站| 无遮挡美女18禁免费啪啪| 日韩欧美亚洲另类激情一区| 特级一级毛片视频免费观看| 亚洲精品私拍国产福利88| 91视频欧美青青草| MM131巨爆乳美女少妇动态图| 欧美大乳中文字幕在线| 亚洲有码精品视频在线观看| 国产精品看片在线| 天天看天天噜噜噜在线视频| 亚洲AV乱码一区二区三区按摩.. | 二次元人物桶二次元人物免费网站| 亚洲私人无码综合久久网| 亚洲一区二区三区av黄片| 欧美日韩一区二区视频播放黑人粗| 久久人人爽人人澡人人高潮AV| 亚洲经典国产av| 欧美第27页网站在线观看| 国产午夜福利影音| 亚洲中文字幕在线观看视频特物资| 国产亚洲精品成人| 午夜精品福利波多野结衣| 亚洲欧美一区二区三区69 | 国产91在线中文字幕无码| 2022久久最新国产精品| 日韩欧美偷拍人妻丝袜第一页| 久久午夜片电影鲁丝午夜精品| 欧美日亚洲黄色网站在线观看| 日本午夜在线视频| 成年无码?v片在线无码精品| 国产中文在线精品一区| 很很鲁免费视频在线观看| 亚洲精品私拍国产福利88| 国产超碰97老师人人看| 国产性欧美疯狂猛交69hd| 韩国成人AV网站在线观看| 惠民福利久久精品国产亚洲7777 | 91精品国产综合久久久亚洲日韩| 四虎sihu新版影院亞洲精品| 日韩免费高清一级毛片久久| 成a人片免费在线观看| 天天在线观看日韩免费AV| 欧美日韩一区二区三区一| 鲁大师视频在线观看免费播放| 青青国产91久久久久| 中文字幕乱码一区二区三区蜜桃成熟时 | 91香蕉视频下载安装| 国产精品素人亚洲国产| 女人被男人桶| 18禁黄网站禁片无遮挡观看APP免费| 国产一级黄aa爽| 思思久久96麻豆| 一女享受夫奴口舌伺候 | 中文字幕久无码免费久久| 欧美另类性视频| 虎白女粉嫩粉嫩的18在线观看| 手机在线看片你懂得| 国产精品喷水综合久久久| 精品91自产拍在线观看99re| 欧美日本不卡一二三区| 884aa四虎影成人精品| 国产精品美女久久久久久大全| 久久久一二三区精品| 午夜福利导航APP| 99国产精品视频一区二区69堂| 亚洲福利片欧美日韩一线相关内容首页| 夜夜欢av一区二区三区| 国产免看一级a一片成人AⅤ| 亚洲综合五月天激动情网| 日本中文字幕www| 99国内精品久久久久久| 伊人查蕉在线综合| 人妻中文字幕一区二区不卡| 在线亚洲理论午夜AV大片| 亚洲日本精品va中文字幕 | 秋霞在线手机国产在线| 91精品国产91久久久久久无码天美 | 亚洲伊人成久久综合网| 尹人在线视频| 精品久久久久久无码福利片| 另类亚洲欧美精品综合| 午间影院又黄又粗又大 | 成人女人在线观看| 亚洲国产在线精品国自产拍影院| 国产盗摄精品一区二区酒店等 | 久久精品99国产国产精人s| 久久久一二三区精品| (愛妃視頻)无码精品人妻一区二区三区中| 老师解开乳罩喂奶我脱她内| 日本久久久久精品免费| 无码专区 免费在线| 岳乳丰满一区二区三区| 青青青精品大杳蕉| 久久精品国产亚洲av夜色九虎| 午夜福利精品无码福利| 国产一级免费视频观看| 国产原创剧情情欲放纵| 日韩激情一级毛片| 欧美一级aa大片免费看视频| 久久无码āV中文出轨人妻| 欧美成人自拍| 免费A级特黄片日韩精品| 亚洲一日韩中文字暮AV| 美女视频一区二区三区在线| 一级毛片大学生九九精品视频| 欧美日韩精品区久久久| 国产盗摄精品一区二区酒店等 | 思思热视频精品在线观看| 亚洲欧美日韩另类色图| 国产福利精品在线| 欧美性爱首页| dddd亚洲日韩欧美精油| 一级毛片大学生九九精品视频 | 久久国产这里只精品免费| 久久伊人免费视频| 日韩美女A∨性爽一级毛片| 国产午夜一区二区在线观看m| 亞洲歐美偷拍另類| 久久午夜青青草原影院| 人妻撑开合不拢流出白浆视频| 被男狂揉吃奶胸高潮视频在线观看| 377p欧洲日本亚洲大胆噜噜| 99视频在线看观免费| 字幕大全网址撩人精品磁力视频二区| (愛妃)久久AV无码精品人妻出轨| 制服丝袜物喷水亚洲综合精品| 久久精品国产AⅤ无码| 大地免费资源| 亚洲视频在线观看污污的黄| 一区二区三区四区在线免费观看| 秋霞在线手机国产在线| 18禁黄网站禁片无遮挡观看APP免费 | 亚洲国产在线精品国自产拍影院| 欧美男人与动牲交zooz| 黄色一级视频| 91精品无码专区免费| 国产成人福利在线观看视频| 日韩欧美高清在线播放| 日韩免费不卡视频1| 97久久国语露脸精品对白| 久久久久久久女国产乱让韩| 在线亚洲无码| 超碰成人在线91| 久久午夜片电影鲁丝午夜精品| 国产成 人 亚洲 综合| 激情男女高潮射精?V免费| 人妻系列专区无码在线| 欧美日韩最新精品一二区热热| 好大好硬好深好爽视频h| 国产污污视频在线观看| 无码国产福利av私拍导航| 国产香蕉成人综合精品视频| 日韩欧美偷拍人妻丝袜第一页| 拔萝卜免费观看高清视频下载| a级高清毛片视频免费观看| 中文字幕无?v免费久久| 国产精品va在线观看my| 国内高清A自拍视频| 国产天天精品视频| 欧美综合高清日本| 欧洲亚洲日本大胆色噜噜| 91视频欧美青青草| 日韓中文字幕無碼高清毛片| 在线精品三级视频在线网| 国产午夜视频免费观看| 黄片软件免费下| 一级不卡无码免费黄片| 亚洲精品日韩专区在线观春| 亚洲无码模一级黄片| 国产在线视频一卡| 亚洲av成人精品日韩在线播放| 黄色午夜网站| 久久国产这里只精品免费| 国产精品无码久久AV嫩| 午夜色a大片在线观看免费| 久久精品国产99国产精品严洲| 亞洲國產歐美在線觀看| 亚洲国产日韩欧美综合在线一区二区三区 | xxxx欧美丰满大屁股| 99re8免费视频精品全部| 熟女一区二区天天操夜夜操| 医院人妻隔着帘子被中出| 国产精品日产精品久久| 日日澡夜夜澡人人| 最近免费MV在线观看| 欧美日韩一区二区视频播放黑人粗| 国产性夜夜春夜夜爽1a片| 国产精品厕所偷窥盗摄av| 女人被男人躁的爽免费视频| 菠萝菠萝蜜免费影视在线观看| 成人亚洲欧美在线观看| 老司机带带我精品视频| A级国产乱理伦片喂奶| 国精一二二产品无人区免费应用| 日韩精品成人蜜桃| 日韩成人手机午夜在线播放网站| 欧美日韩最新精品一二区热热| 欧美日韩主播国产视频| chinese熟妇老女人hd视频| 91香蕉视频在线观看分享的内容是很丰富的 | 国产精品视频毛片| 特级毛片www免费版| 亚洲无码免费看在线视频| 图片区电影区激情区小说区| 中文成人无码国产亚洲| 图片区电影区激情区小说区| 做爰高潮a片视频35分钟| 欧美日韩中文字幕国产一区| 日韩欧美国产手机在线观看| 中文又粗又大又硬毛 | 国产精品二区在线| 青草影院内射中出高潮| 在线观看xxxx国产| 国产亚洲精品美女2020久久| 欧美a级片在线观免费观看| 狠狠干2017欧美最新| 日本高清中文无卡| 亚洲精品私拍国产福利88 | 天天更新最近中文字幕完整视频在线看!| 欧美激情四射一区二区在线| 十八禁爽爽爽无遮挡在线观看网站| 人人色人人干人操| 欧洲精品aaa一区二区| 亚洲综合男人的天堂色婷婷| 国国产最新精品盗摄视频| 国产成人合集在线播放| 国产91在线中文字幕无码| 国产指交视频在线观看| 日本久久东京热午夜| 天堂av在线观看免费| 性高湖久久久久久久久| 十八禁爽爽爽无遮挡在线观看网站 | 中美日韩三级毛片免费观看| 国产亚洲h网综合h网久久| 成人黄片视频免费在线观看| 欧美日韩国产人成在线| 久久亚洲精品少妇| 日本少妇一级婬片HD69网站| 人妻撑开合不拢流出白浆视频| 三级大黄片污软件| 三级日韩在线不卡| 九色91POPNY蝌蚪新疆| 影音先锋国产精品天堂| 亚洲国产精品 制服丝袜| 欧美老熟妇夜夜爽| 国产乱妇乱子视频在线观看免费| 国产一区二区三区在线观看色网站| 午夜精品九九九九99蜜桃 | 亚洲中文字幕在线观看视频特物资| 日本黄色影片在线观看| 欧美在线国产一区| 国产小视频一区二区三区中文字幕在线播放| 18禁动漫一区二区三区| 91久久久久久国产免费| 911永久在线网站| 中文字幕一本久久综合| 日韩视频 中文字幕在线看| 亚洲卡2卡三卡4卡2021老狼| 国产尤物A∨尤物在线观看| 日韩欧美一区二区三区成人精品 | 精品国产午夜在线| xfplay加勒比人妻av资源站| 亚洲欧美日韩综合网导航| 三级在线免费a免费看| 人妻系列专区无码在线| 国产亚洲精品成人| 天天摸日日摸狠狠添高潮喷| 一女享受夫奴口舌伺候| 日本在线一区二区三区免费| 国产片精品mv在线观看| 亚洲欧美日韩综合第一| 水蜜桃视频污在线观看| 伊人久久综在合线亚洲2019}| 国产精品视频免费看人鲁| 精品久久久久久久久久香蕉| 狼友久久国产精品| 欧美亚洲免费播放一区| 车里要了好多次天天影院网| 丰满少妇猛烈进入无码| 午夜综合影院欧美聚众性派| 一级黄片免费1999| 国产精品久久久久浪潮av| 亚洲欧美日韩国产一区在线| 国产毛片久久久久久久久久久久| ddd54手机免费看| 亚洲av日韩国产激情| 欧美一级aa大片免费看视频| 欧美jizz18性欧美色天堂综合在线| 在线三级网址| 亚洲精品国产成人影片在线观看| 91伊人久久大香线蕉网站| 亚洲欧美另类久久| 亚洲无遮挡一级精品视频| 免费一级黄色网络网站欧美| 夜色www中国精品视频网站| 精品免费一区二区爱| 国产美女裸乳无遮挡网站| 羞羞视频APP下载网站| 不卡av中文在线观看| 我的漂亮女房东完整版在线韩剧| 中文字幕亚州欧美专区| 中日韩产精品1卡二卡三卡| 精品视频卡1卡2卡3| 成人国产欧美日本精品久久麻豆 | 今日亚洲2021在线观看| 日本成a人片在线观看网站 | 一级做a爱片高潮毛片| 亚洲伊人成久久综合网| 丝袜美足国产一区在线| 中文字幕 亚洲 一区二区三区| 国产99视频免费精品| 亚洲一级皇色大片蜜汁满满| 久久AV无码三级美式禁忌| 五月丁香婷婷免费| 久久久久久久女国产乱让韩| 亚洲欧美一区二区三区69| 好爽快点我受不了了视频| 国产一二三区 韩国女主播| 国产午夜福利红色一片精品| 搡老女人老妇老熟女50ⅹxxx | 超97视频在线免费观看| 中国毛片在线观看| 最近中文字幕mv免费高清视频动| 91探花偷偷拔套在线播放| 国产黄A片免费网站免费| 免费成人一级毛片电影| 久久99热免费精品久久| 全免费a级毛片免费| 亚洲国产精品久久一线APP| 女人用炮机高潮合集视频播放| 国产成人久久99| 欧美日韩性视频在线| 国产精品老师好紧好爽最新毛片| 国产精品亚洲自拍| 国产成年男人裸j网站| 激情男女高潮射精?V免费| 精品区一区二在线观看| 在线观看免费人成视频色9| 宝可梦沙奈朵口吐白色液体| 亚洲欧美中文日韩v在线在线观看| 成年无码?v片在线无码精品| 女人十八毛片免费观| 午夜精品一区二区三区国产色欲 | 日韩欧美国产不卡一区二区| 色婷婷综合在线视频| jizz狼友国产高清交流a| …久久精品99久久香蕉国产 | 亚洲国产午夜电影在线观看| 秋霞久久女婷五月综合色啪| 天天爽爽夜夜爽爽视频小视频| 人妻久久系列精品| 六十老妇性大啊使劲| 亚洲av手机在线观看| 国产激情一区二区三区成人麻豆| 久久精品国产精品亚洲艾草| 欧美日韩一区二区三区一| 男人天堂日韩精品| 91香蕉视频在线观看分享的内容是很丰富的 | 1024手机在线国产你懂的| 欧美一区二区亚洲成人| 二区三区中文字幕在线观看| 国产91九色在线| 国产无遮挡无码免费视频在线抪| 国产一级久久女人毛片| 亚洲v欧美v国产ⅴ在线成| 天天躁夜夜躁狠狠躁综合真实| 日本二区在线中文字幕好看到停不下来!| 久久99热免费精品久久| 在厨房拨开内裤进入在线视频| 亚洲三区欧美一区二区在线| 香港三级日本三级妇三级| 尊龙凯时·(中国区)人生就是搏!| 亚洲欧美日韩精品久久久一区二区| 蜜臀久久精品国产亚洲av| 国产亚洲h网综合h网久久| 少妇太爽了在线观看视频| 色欲久久国产色av免费看老司 | 亚洲日本一区亚洲影院| 国产美女露底激情视频| 国产精品亚洲综合每日| 亚洲综合精品二三区| 国产一级免费视频观看| 特级毛片A级毛片免费观看| 亚洲?V伊人久久综合密臀性色| 视频一区亚洲专区| 国产一级无码| 在ktv上班被客人吃奶头| 曰韓無碼二三區中文字幕| 免费播放黄色叫床露脸对白影片| 污视频网站日本免费| 在线观看免费的AV网址| 久久精品囯產亞洲av麻豆色欲 | 久久久一二三区精品| 年轻的朋友3完整版在线观看| 欧美另类性视频| 亚洲αv无码不卡一区二区三区| 午夜精品一区二区三区在线成人| 五月综合婷婷欧美| 国产精品久久久久久五月天加勒比| 网页在线观看无码高清| 欧美日本在线不卡二区| 亚洲欧美一区电影| 亚洲一级日本在线播放| 成人毛片视频亚洲| 国产亚洲精品精品在线精品| 日韩精品毛片无码一区| 国产又粗又猛又大爽又黄的软件| 亚洲色拍国产另类| 日韩成人精品视频自拍| 成年人国产一级片| 手机在线看片你懂得 | 在线播放国产视频99| 国产精品久久久久久成人热AV| 亚洲欧美日韩岛国色图| 欧美精品青青久久久久久久久久久| 毛片无遮挡高清免费久久| 91精品一区二区三区久久久久 | 国产ā v中文字幕乱码| 色影音先锋色资源网站| 国产免费牲交视频38禁| 免费国产一区二区久久| 国产精品网站 夜色| 国产无遮挡又黄又爽在线观看| 99久久国产热无码精品免费久久精品A亚洲国产V高清不卡 | 插我一区二区在线观看| 精品无码人妻遭多人侵犯Av| 国产精品成人嫩草影院| 久久久久久人妻| 熟妇av日韩不卡| 亚洲中文字幕一区二区不卡国产| 国产精品老师好紧好爽最新毛片| 麻豆视频传媒APP | 暖暖www视频免费高清最新期| 音影先锋男人在线资源网| 国产又长又粗达到性高潮的视频| 免费无码a∨片在线观看| 国产精品欲AV麻豆网站| mmuu55首页 日本系列| 美女美女一区二区三区| 伊人久久香综合蕉五月天| 爱丫爱丫影院电视剧免费| 思思久久96麻豆| 亚洲av永久无码偷拍另类| 国产av网站高跟丝袜| 在线观看国产高清a| 亚洲VS欧洲999在线观看视频| 成人无码av一区二区三区| 视频福利一区二区三区| 国产日韩综合一区二区性色?Ⅴ| 免费黄色资源| 成人国产经典精品视频| 亚洲一级a无码毛片中文国产| 久精品视频在线观看免费| 久久综合第一页无码97| 9久热在线精品996热视频观看| 向井蓝中文字幕一区二区三区| 亚i洲成色在线综合网站| 成人综合在线视频免费观看完整版| 轻轻色国产在线视频| 亚洲尤物永久无码AV毛片| 我的好妈妈6高清在线观看| av无码免费高潮喷水不卡| 亚洲国产欧美在线播放| 最近最中文字幕视频| 国产又黄又骚又猛欧美| 377p欧洲日本亚洲大胆噜噜| 91久久久久久国产免费| 亚洲日本欧洲综合| 丝袜在线视频网站| 八戒影视大草原久久揄拍片| 91精品一二区久久无码电影| 亚洲人妻精品综合无码专区| 国产综合内射日韩久| 激情丝袜美女视频1区| 亚洲资源中文字幕| 国产狼友精品视频网| 91超级好看一区二区三区| 国产乱妇乱子视频在线观看免费| 97超碰国产精品| 男女视频诱惑国产在线观看| 久久免费福利资源站 | 亚洲色欲或高潮影院伊人| 超碰97久久尤物| 电影天堂免费在线观看| 爱福利秒拍国产导航小视频| 久久er热这里只有国产中文精品 | 国产私人尤物无码不卡| 国产特黄色一级| 成人看片黄在线观看| 欧美日韩国产激情另类| 国产精品99国产精品久久gif| 18禁止裸身美女动漫网站| 日韩国产欧美中文字幕在线播放| 中文字幕一本久久综合| 欧美日本不卡一二三区| 性国产天堂VIDEOFREE高清| 天堂av在线观看免费| 一区二区三区吞精| 免费在线播放无码黄色片| 99爱免费视频在线观看禁| 日韩精品中文字字幕有码专区| 五月天婷婷伊人久中文字幕| 日韩毛片午夜在线观看| 亚洲精品色无码一二三区| 亚洲精品一级在线播放| 最新久久高清精品| 视频一区亚洲专区| 亚洲欧美日韩国产精品中文字幕| 亚洲欧美日韩岛国色图| 善良的嫂子高清播放完整版| 后入式肏大屁股眼免费视频| 亚洲欧美日韩精品专区52| 91人妻午夜综合精品视频| 一级在线中文观看日韩| 白丝紧致爆乳自慰喷水玩具动态图| 国产白浆在线视频网| 亞洲一區在線播放| 黄色午夜网站| 国产成人剧情?v麻豆映画 | 99热在线观看免费精品| 日韩在线视频中文一区二区视频综合| 国产毛片的高清视频| 亚洲国产欧美在线播放| 日本电影中文字幕久久| 自拍日韩葡萄影院视频在线播放| 五月丁香婷婷成人网| qvod经典视频在线播放| 973午夜伦伦电影论片| 中文字幕乱交第9页| 性感日韩在线视频观看| 国内真实刺激对白自拍视频| 999福利精品久久久| 女性高爱潮免费有声视频网站| 亚洲卡2卡三卡4卡2021老狼| 亚洲?v无码国产精品色午夜| 91超级好看一区二区三区| 亚洲三级毛片一区二区| 免费看一级a女人自慰青春网| 成年人视频久久免费| 久久精品国产亚洲Vā香蕉| 一女享受夫奴口舌伺候 | 日韩成人精品视频自拍| 福利视频日韩欧美国产| 国产精品无码久久AV嫩| 97精品一区二区视频观看| 欧美黑人又粗又大又硬免费视频| 亚洲女人视在线| av资源久久免费下载| 国产亚洲精品成人| 国产精品色哟哟免费看麻豆| 国产乱人伦偷精品视频???| 色婷婷国产精品欧美毛片| 在线精品三级视频在线网| 国产午夜福利在线播放87| 99精品無碼人妻一區二區三區 | 69国产成人精品午夜在线| 国产精品玖玖玖玖影院| 69精品久久日日躁夜夜躁| 久久精品丰满人妻99| 18禁黄网站禁片无遮挡观看APP免费| 成人无码视频在线观看| 欧美12一13SEX性视频| 日本高清免费中文字幕区dd| 欧美性爱首页| 日韩一区二区在线视频| 久久久国产精品免费无码| 亚洲精品无码不卡在线播放HE | 成人国产一区二区三区精品小说| 五月综合婷婷欧美| 国产乱码人妻一区二区三区| 国产欧美va欧美va在线动漫| 成人无码av一区二区三区| 青娱乐精品视频在线免费观看| 444kk免费看片在线观看| 色欲久久国产色av免费看老司| 中文字幕 亚洲 一区二区三区| 国产偷人视频免费观看| 亚洲熟妇av一区二区三区痴汉| 亚洲日韩精品综合| 国产内地刺激性精品毛片| 中国精品视频在线一区二区| 女教师一级特黄毛片| 春色 都市 亚洲 小说区 | 国产在线观看h尤| 一区二区放荡亚洲人妇| 亚洲全部无码中文字幕| 久久99热免费精品久久| 大香伊蕉最新视频国产| (愛妃精選)免费无码毛片一区二区| 國產一區不卡視頻| 免费A级毛卡片不收费视频| 亚洲中文字幕乱码影院在线| 国产大尺度无遮挡在线观看| 欧美巨大激情久久久| 久久婷婷色中文字幕免费高清| 一级二区在线观看国内精品三级| 高清少妇欧美中文| 国产视频精选全网| 亚洲一区二区精品久久av女优| 国产精品国产欧美综合一区| 免费精品一区二区中文字幕| 在线观看亚洲精品视频| 亚洲欧美国产日日| 黄到让你下面湿的视频| 手机成人免费视频| 国产成人福利在线视频播放下载| 制服丝袜物喷水亚洲综合精品| 少妇熟女高潮流白浆| 欧美二区视频在线观看| 99久久99久久久精品| 国产成人精品影院网站不卡| 成年人在线观看网站| 韩国三级电影久久久| 亚洲爱潮AV永久无码浪潮AV| 欧美日韩最新精品一二区热热| 亚洲āV无码专区国产乱码不卡| 人妻回春按摩肏到中出 | 国产一二一成人观看| 自拍欧美亚洲国产成人综合| 欧美午夜福利视频| 二级黄色录像片免费播放| 国产乱妇乱子视频在线观看免费 | 曰韓無碼二三區中文字幕| 久久精品无码亚日韩免费影视观看中文| 白丝乳交内射一二三区| 国产精品亚洲自拍| 国产换脸二区手机影院| 天天干天天肏| 欧美成人xx免费视频| 欧美日韩精选在线观看| 亚洲中文字幕一区二区三区在线91| 欧美日在线观看视频| 亚洲丝袜在线观看| 国产一级婬片免费播放电影| 亚洲中文无码成人网| 亞洲國產精品不卡在線電影| 国产性夜夜春夜夜爽1a片| 色综合久久中文字幕无码色欲| 很很鲁免费视频在线观看| 少妇无码AV无码专区在线| jizz狼友国产高清交流a| 亚洲AV乱码一区二区三区| 韩国成人AV网站在线观看| 欧美日韩中文字幕国产一区| 超碰成人在线91| 亚洲午夜福利精品一区| 狠狠干经典视频在线观看| 音影先锋男人在线资源网| 久久久久久久久av毛片| 精品99视频国产免费尤物| 亚洲色欧美日韩在线影院| 狠狠cao免费视频| 亚洲欧美日韩爱爱| 91视频欧美青青草| 日韩婬乱a一级毛片视频| 国产香蕉精品视频| 五月婷婷丁香综合| 国产精品精品综合在线网址| 国内9l视频自拍老熟女九色| 18观看免费永久视频| 久久久免费丁香五月| 日韩国产亚洲欧美有码| 日本黄色影片在线观看 | 手机在线观看的国产网站| 中文字幕一本久久综合| 中文字幕无码色综合| 国产精品久久久久久五月天加勒比| 亚洲日韩国产精品久久久综合网| 奖励网站正能量www正能量| 国产精品二区在线| 免费播放黄色叫床露脸对白影片| 日韩AⅤ在线免费观看| 亚洲私人无码综合久久网| 国产目拍亚洲精品二区婷婷| 在线播放国产女同闺蜜| 波多野结衣电影一区二区| 91香蕉视频下载安装| 夜夜添无码试看一区| a毛片免费全部播放吃| 日韩精品国产另类专区互動交流 | 免费夫妻生活片av| 无码制服丝袜一区| 免费+午夜+亚洲| 国产激情一区二区三区成人麻豆| 北条麻妃青青久久av| 美女黄又色高清视频免费| 91精品国产91久久久久久无码天美| 一区欧美激情桃花| 极品精品伊人国产| 国产区清纯高中生| 亚洲一区二区一区| 曰本女人牲交高潮視頻| 国产欧美日韩视频一区在线观看| 神马免费视频在线观看| 国产成人在线免费网站| 日本三级久久| 亚洲最新无码av网址| 亚洲日韩av免费在线观看| 青青青精品大杳蕉| 亚洲性爱视频网站一级看片| 国产又黄又爽的免费视频| 国产精品麻豆一区二区三区v视界| 亚洲资源中文字幕| 久久久久亚洲精品日久生情| 97一区二区在线播放| 亚洲精品国产专区在线| 成人亚洲狠狠一二三四区| 综合亚洲高清国产| 在线观看精品成人综合视频 | 日韩免费无码人妻波多野| 青青草原免费在线观看| 毛片无遮挡高清免费久久| 五月天丁香色| 欧美私人网站| 无套挺进少妇私下处内射| 国产一级无码| 国产一级婬片免费播放电影| 青青青国产免费手机视频在线观看| 国产超清无码 片内射免费| 中文字幕久久精品有码综合网| 在线观看麻豆| 妓女精品一区二区| 久久天天躁狠狠躁夜夜躁综合| 久久美女视频黄片| 婷庭九月天综合水蜜桃| 欧美日韩性视频在线| 亚洲一卡2卡三卡4卡127.0.0.1| 欧洲另类综合| 日韩午夜在线高清成人| xfplay加勒比人妻av资源站| 日本久久高清一区二区三区| 看全色黄大色大片免费久黄久| 精品国产女主自在线久草| 日韩美女粉嫩小泬在线精品| av中文字幕不卡无码| 亚洲国产av秘无码人片久久| 中国熟妇色欧美老妇多毛| 高h猛烈小受失禁潮喷阅读| 91精品国产综合久久久亚洲日韩| 国产亚洲桃色| 婷婷六月天无码| 向井蓝中文字幕一区二区三区| 欧美污污污久久久久久| 很黄很黄的曰批视频| 最新午夜男女福利片视频| 一区二区放荡亚洲人妇| 在线视频日本亚洲 | 亚洲国产永久视频免费看| 国产成人精品亚洲二区| 欧美日韩精品第一区二区| 亚洲欧洲国产韩国va在线| 91天堂一区二区三区在线| 四虎国产在线| 久久精品国产亚洲最新国产| 亚洲精品国产成人影片在线观看| 精品国产日韩在线观看| 日韩美女A∨性爽一级毛片| 女性高爱潮免费有声视频网站| 亚洲人看A∨免费片| 欧美在线三级艳情网站亚洲成人99| 一区二区三区.在线看| 色婷婷国产精品欧美毛片| 在线观看精品成人综合视频| 国产中文在线精品一区| 亚洲中文字幕一区二区三区在线91| 国产91高潮流白浆在线播放un| 大奶子视频一区二区| 自拍亚洲欧美另类动漫| 国内精品久久99人妻无码特黄| 日本加勒比麻豆亚洲精品| 日韩精品视频无码一区我們每天24小時不間斷 | 一区二区三区无码在线| 国产精品女同久久久久电影院| 狠狠噜天天噜日日噜视频跳一跳| 日韩产品和欧美产品的区别| 午夜色a大片在线观看免费| 亚洲 自拍 色综欧美合图区| 国产欧美日韩激情视频一区| 自慰在线观看18p| 四虎永久在线免费视频一二区| k频道一区国产在线观看| 精品久久久久免费免费自慰| 女性高爱潮免费有声视频网站| 国产欧美久久一区| 久久久久久免费播放一级毛片 | 午夜APP在线观看| 免费久久黄色毛片| 永久免费毛片久久99| 欧美一区二区免费播放| 国产午夜福利精品一区二区久久| 精品日韩久久一区| 日本www久久久久久久久| 久久久久亚洲精品日久生情| 天堂国产成人av在线| 成人亚洲色欲色一欲| 欧美极品jizzhd欧美仙踪林| 亚洲日韩欧美在线成人| 国产69久久精品成人必看| 久久精品波多野结衣中文字幕| 国产精品有码无码脛∨在线 | 免费电影AV网站| 欧美一区日本二区| 爱丫爱丫影院电视剧免费| 亚洲熟妇无码AⅤ不卡在线播放| 中文字幕有码无码人妻?V蜜桃| 免费真人一对一视频| 成人精品aaa亚洲丝袜在线观看| 99国产精品视频一区二区69堂| 变态骚女玩男人在线免费观看| 茄子成年app在线观看| 欧美一级人成视频| 国产高清不卡免费在线观看| 伊人成综合网| 99久久久国产免费观看精品| 在线观看无码精品秘?日本| 无码中文字幕aⅴ免费费放| 老司机无码精品A| 亚洲国产欧美日本韩中文字幕在线| 国产免费女明星色视频| 国产成人精品亚洲二区| 日韩一级色网中文字幕| 日本羞羞视频在线观看| 日本欧美一区二区| 2022AV天堂高清视频在线| 国产日韩欧美中文一区| 国产在线观看91精品| 国产欧美一区二区日本加勒比| 55夜色66亚洲精品| 亚洲AV日韩在线一区二区三区| 精品日韩久久一区| 老司机影音先锋日本网站在线 | 无限看片的视频大全免费下载| 亚洲精品国产专区在线| 久久精品亚瑟全部免费观看| 亚洲国语毛片在线看国产| 操小孩污视频在线免费观看| 最新国产乱伦| 中国女人内谢25xxxxx| 中文字幕一区二区人妻本田岬| 成·人免费午夜无码不卡| 小视频播放亚洲欧美| 手机在线日本视频| aⅴ色综合久久天堂av色综合| 国产精品福利福利一区在线观看| 亚洲最新无码av网址| 国产精品va在线观看my| 免費在線一級片| 中文一区二区视频成人二区| 欧洲 亚洲 中日在线观看| 国产超清无码 片内射免费| 国产精品久久久久久五月天加勒比 | 網友分享免费福利资源站在线视频心得| 国产ā v中文字幕乱码| k频道国产网红欧美在线视频| 在线播放亚洲黄片| 99久久精品一区二区毛片下载| 国产免费福利片在线视频| 亚洲精品综合在线导航网址| 激情丝袜美女视频1区| 亚洲人看A∨免费片| 中国激情一区二区三区成人| 18禁动漫一区二区三区| 人人干在线视频| 国产欧美VA天堂在线观看视频下载| 国产精品99久久久久久宅男小说| 久久久噜噜噜久久中文字幕色伊伊| 一本色道久久88加勒比—综 | 欧美精品第56页| 九九在线观看高清免费| 无码国产精品一区二区蕉蕉免费式 | 亚洲全部无码中文字幕| 年轻的朋友3完整版在线观看| 国产精品国产亚精品不卡| 欧洲亚洲美洲va国产综合193| 在线综合亚洲欧美成人影院| 欧美色图一区二区| 国产亚洲综合秋霞影院国产| 国产一久久久久久久久| 國產午夜人做人免費視頻中文| 亚洲欧洲国产韩国va在线| 天天做天天欢摸夜夜摸狠狠摸| 一级做a爱片高潮毛片| 孕妇动漫精品国产一区二区三区 | 久久综合综合久久?V在钱| 偷拍视频国内久久精品| 亚洲三区欧美一区二区在线| 精品无码久久久久国产| 无遮挡又黄又刺激在线视频| 国产成人av一区二区三区中文精品 | 国语自产精彩视频在线视频| 草莓视频app下载18| 国产成人综合亚洲网址| 国产一级做?爰片久久毛片野外| 大地免费资源| 亚洲农夫色无码在线| 殴州人成在线视频| 欧美影视一区| 一区二区三区欧美午夜免费| 国产性夜夜春夜夜爽1a片| 一二三四在线色网视频观看社区| 国产成人av大片大片在线播放| 九九九国产在现视频| 日本AⅤ精品中文字幕在线 | 伊人直播黄版APP入口| 婷婷六月天激情| 自拍欧美亚洲国产成人综合| 欧美激情诱惑在线观看| 精品三级66在线播放| 一区二区精品在线| 99视频在线看观免费| 欧美激情诱惑在线观看| 久久精品亚瑟全部免费观看| 亚洲色拍国产另类| 人妻激情综合久久久久| 97人人超人人超碰超国产| 入禽太深在线色网视频5| 亚洲影视AV一二三| 成人无码视频在线播放| 草莓视频APP下载官方 | 亚洲午夜电影欧美整片sss| 久久久久亚洲精品日久生情| 国产一区二区三区在线观看色网站| 国产18成人三级在线观看| 国产精品久久久久片免费又是看 | 男女做爱视频在线观看| 国产Av激情久久无码天堂| 亚洲av永久无码偷拍另类| 在线观看国产一区二区三区 | 动漫播放在线国产成人| 草草影院欧美04一区二区三区| a级高清毛片视频免费观看| 日本欧美一区二区| 91桃色污污污污污污污污污| 码 码加勒比国产在线| 久久美女视频黄片| 日韩欧美人妻之中文字幕| 妓女妓女一区二区三区在线| 久久伊人毛片视频| 日韩精品一区国产偷窥在线| 最近最新中文字幕2018| 成人国产一区二区三区精品小说 | 久久久久无码精品国产H动漫猫咪 91精品网站天堂系列在线播放 | 好紧好湿好爽免费视频美女做 | 免费无码a∨片在线观看| 欧美牲交?欧美牲交| 被仇人狠狠开发了by小小巴士| 美女制服で視頻網站| 餐桌下狂c亲女高辣h文| 在线播放国产女同闺蜜| 玩弄粉嫩少妇高潮出白浆AⅤ| 秋霞电影伦理手机版| 欧洲国产精品sss在线观看av| 色影音先锋色资源网站| 国产聚色窝在线首页| 麻豆精品一区二区综合āV| 人妻日韩AV无码一区二区| 臭小子快拔出来我是你嫲视频| 网页在线观看无码高清| 中文字幕亚州欧美专区| 日本免费AⅤ乱码高清专区| 色偷偷综合亚洲av78| 亚洲最新无码2021| 99在线免费观看黄片| 婷婷综合在线视频精品 | 91香蕉视频一区二区在线观看国产b站视频 | 国产偷窥熟女精品| 女式开襟游泳衣免费| 女人被添荫蒂潮喷视频| 美国日本韩国精品在线| 亚洲欧美另类久久| 又色又爽又硬又刺激的视频 | 澳门精品久久国产电影| 亚洲AV乱码一区二区三区| 国产精品网站 夜色| 黄色一级视频| 在线观看精品一区二区三区| 激情依依av男人的天堂| 色综合精品视频在线| 国产精品羞羞答答| 欧洲精品高清无码一区二区三区| 亚洲日本一区亚洲影院| 亚洲中文婷婷丁香五月天| 91天堂一区二区三区在线| 嫩草国产等最新內容| 无码中文字幕aⅴ免费费放| 高清偷自拍亚洲精品三区| 午夜免费一级av福利毛片| 国产人与禽ZoZ0性伦69| av大片在线观看| av一av无码免费观看| 国产精品青草婷婷| 女性喷液过程高清免费视频| 欧美一级黄色免费在线观看视频| 夜夜欢av一区二区三区| 超级极品白嫩美女在线| 四虎www成人影院观看| 亚洲色图一区二区的| 欧美男人与动牲交zooz| MM131巨爆乳美女少妇动态图| 中文少妇无码影视| 日韩精品一级一区| 国产高清在线观看AV片| 婷婷六月天激情| 97久久国语露脸精品对白| 国产精品美女久久久浪潮?v| 亚洲av午夜福利无码精品一区| 好爽快点我受不了了视频| 亚洲一区二区三区av黄片| 91亚洲黄色在线看| 午夜男女后插入在线免费| 国产97精品一区二区在线观看| 日本电影中文字幕久久| 国产强奷在线播放免费重| 9久热在线精品996热视频观看| 好了AV第四综合无码久久| 日日夜夜摸多人换着玩| 男女高潮吃奶添下面动态图| 久久爽av鲁丝无码中文| 睡错闺蜜男朋友(高h)| 成人亚洲色欲色一欲| 成在线人av免费无码高潮喷水| 99视频在线看观免费| 五月开心中文版在线观看| 欧洲另类综合| 九九九国产在现视频| 91香蕉视频下载安装| 一本无码人妻在中文字幕免费经典| 韩国羞羞漫画无遮羞在线看| 国产经典网红福利视频网站| 亚洲视频在线观看污污的黄 | 午夜毛片精彩毛片| 国产精品午夜不卡在线观看| 天天躁夜夜躁狠狠躁综合真实| 最新av网站网址免费观看| 久久久久久久女国产乱让韩| 无码制服丝袜一区| 欧美成人做爰a片免费看美七烈| 国产av网站高跟丝袜| 国产福利甜味弥漫精品tv一区 | k频道一区国产在线观看| 成人AV无码国产在线观看动漫| 国内9l视频自拍老熟女九色| A级成人婬片免费看无码| k频道一区国产在线观看| 国产精品美女久久久久久大全| 亚洲Av人片另类| 又色又爽又硬又刺激的视频| 国产天堂在线一区二区三区| 三浦恵理子息与子中文字幕| 国产成人福利在线观看视频| 黄片软件免费下| 亚洲一区二区三区网站观看| 厨房里强摁做开腿呻吟动漫| 亚洲日产精品一二三四区| 国产精品亚洲日韩高清资源| 久久久一二三区精品| 夜夜爽天天躁夜夜躁狠狠| 100款禁用黄台网站小黄鸭| 久久久久久免费免费麻辣| 日韩av手机在线观看| 99视频日韩三级电影| 亚洲色欲或高潮影院伊人| 冯仰妍破处门| 图片区小说区另类春色蜜芽| 国产午夜福利影音| 熟妇av日韩不卡| 精品综合在线99亚洲青草91| 超碰97人人天天夜夜| 国产成人精品亚洲二区| 虎白女粉嫩粉嫩的18在线观看| 中文字幕永久有效丝袜| 欧美群交一区二区大吊曰大逼| 一级不卡无码免费黄片| 一本久草综合| 精品亚洲国产aⅴ在线| 久久高清综合免费| 日韩在线欧美在线一区二区三区| 100款禁用黄台网站小黄鸭| 中文字幕理论片在线高清| 成人高清毛片视频| 中文字幕 亚洲 一区二区三区| 跪趴着被主人狠狠调教| 日韩午夜不卡在线看| 精品一区二区三区播放| 免费99精品国产一级A大人片| 国产私人尤物无码不卡| 香蕉国产人午夜视频在线| 亚洲国产中文字幕在线视频| 国产黄A片免费网站免费| 日韩偷拍一区二区三区| 一色屋精品无码免费视频| 国产白丝喷水娇喘视频| 秋霞久久女婷五月综合色啪| yw尤物久久国产综合| 一区二区三区国产V欧美| 国产综合内射日韩久| 久久99热免费精品久久| 天堂在线中文最新版地址| 日韩免费不卡视频1| 韩国成人AV网站在线观看| 国产精品一区二区精品片子| 91精品一二区久久无码电影| 亚洲国产视频二区| 成年无码AV片在线蜜芽| 瑟瑟视频在线观看| 国产天堂网www在线资源av网| 国产亚洲综合秋霞影院国产| 中文精品影视日本| 男人把j伸进女人的p免费| 久久久久久a亚洲欧洲A v冫| 亚洲电影激情五月激情| 国产精品福利福利一区在线观看| 欧美激情诱惑在线观看| 成人无码av一区二区三区| 日韩欧美女破处视频免费观赏| 农村少妇野外a片www| 一进一出把女子干的全身抽搐 | 欧美狂野视频在线精品| 无套挺进少妇私下处内射| av午夜福利精品一区| 亚洲三级无码经典三级| 国产性爱第8页在线观看| 国产啪嗒啪嗒无遮美女视频| 欧美色图一区二区| 99久久精品无码一区二区麻豆| 国产区清纯高中生| 男人把j伸进女人的p免费| 亚洲福利在线视频| 国产精品欲AV麻豆网站| 这里只有好看的a视频| 国产91久久精品一区二区九色| 国产强上视频在线观看| 中文字幕av免费看网站| 在线视频日本亚洲 | 亚洲国产激情一区在线| 色欲国产av一级毛片| 国产特级全黄一级97毛片电影| 亚洲日本韩国成人在线视频 | 理论片在线免费观看| 亚洲欧美自拍唯美另类| 黄色电影免费在线| 亚洲在AV极品无码天堂| 惠民福利黄色成人网站免费无码av| 欧美在线免费亚洲| 亞洲A∨精品一區二區三區下載 | 5x性社区免费视频播| 国产天堂网www在线资源av网| 中文字幕欧美精品日韩在线| 18禁美女裸体无遮挡的网站| 一进一出把女子干的全身抽搐| 国产91九色在线| 国产Av激情久久无码天堂| 日韩精品手机在线| 精品免费一区二区爱| 欧美人成一本免费观看视频| 正在播放黑人巨大在線觀看| 国产在线视频一卡| 亚洲无码aⅴ色图| 亚洲在AV极品无码天堂| 人妻回春按摩肏到中出| 亚洲综合无码一区二区三区四区| 天天在线观看日韩免费AV| 亚洲av手机在线观看| 国产无码喷水| 激情男女高潮射精?V免费| 亚洲精品国产专区在线| 色吧超碰97人妻| 亚洲国内精品久久久久电影院| 女人19水真多免费毛片| 免费在线观看精品亚洲| 国产成人午夜一级电影在线| 好姑娘10影视剧在线观看| 中文字幕无码亚洲视频| 久久精品視頻只有這里| 久久久久久人妻| 日韩免费AV无线在码| 水蜜桃视频污在线观看| 亚洲va欧美a国产va综合| 99爱免费视频在线观看禁| 色婷婷综合激情蜜桃tv| 免费观看60秒做受视频| 亚洲伊人成久久综合网| 欧美中文字幕网站免费| 精品国产v无码大片在| 向井蓝中文字幕一区二区三区| 无遮挡又黄又刺激在线视频| 久久综合九色综合欧美婷婷 | 日本美国一级大片| 亚洲亚洲国产精品| 国产成 人 亚洲 综合| 在线观看免费综合亚洲| 精品国产午夜在线| 日本加勒比麻豆亚洲精品 | 欧美亚洲不卡av免费一二三区| 人妻激情综合久久久久| 制服丝袜自拍偷拍av一区| 免费A级特黄片日韩精品| 永久免费观看的片毛视频| 亚洲AV无码一区二区三区在线播放| 野花日本韩国视频免费高清观看| 国产无遮挡无码免费视频在线抪| 日本www久久久久久久久| 少妇极品美軳人体337p| 日本欧美一区二区| 国产另类欧美自拍日韩综合| 18禁止裸身美女动漫网站| 一进一出把女子干的全身抽搐| 正在播放黑人巨大在線觀看| 久久午夜片电影鲁丝午夜精品 | 日韩欧美国产不卡一区二区| 野外一级爱做片免费观看| 亚洲日韩AV无码中文| 老师解开乳罩喂奶我脱她内| 无码国产福利av私拍导航| 欧美精品久久96人妻无码 | 人妻被中出不敢呻吟A片视频 | 青青国产91久久久久| 日韩精品亚洲色大成网站| 999福利精品久久久| 91精品国产高潮久久久久| 国产毛片的高清视频| 日韩AⅤ在线免费观看| 欧洲精品一二区无码人妻| 日本在线视频色综合| 9色丨porny丨人妻| 色欲久久国产色av免费看老司| 餐桌下狂c亲女高辣h文| 国产一级大片免费视频| 日韩在线欧美观看| 免费真人一对一视频| ..亚洲欧美日韩成人高清在线一区 | 亚洲色拍国产另类| 手机在线日本视频| JK白丝高中小仙女自慰| 餐桌下狂c亲女高辣h文| 人成午夜日本乱码伦视频亚洲 | …久久精品99久久香蕉国产 | 黄色电影免费在线| 午夜亚洲国产理论片2020| 国产aⅤ一二三区无码视频| 日本国产我97在线| 日本美国一级大片| 亚洲另类无码一区二区三区冫| 精品视频在线观自拍自拍| 双乳被快递员揉搓玩弄在线播放| 中文人妻久久| 国产丰满老女人A片免费观看| 日本免码va在线看| 国产性欧美疯狂猛交69hd| 精品妇人妻视在线视频| 亚洲精品夜夜夜夜夜夜| 午夜精品九九九九99蜜桃| 国产精品青青草原免费无码中国 | 91精品导航在线观看| 人妻激情综合久久久久| 亞洲A∨精品一區二區三區下載| 国产第页日本草草影院香蕉| 欧美亚洲国产手机在线dvd| 黄色欧美三级在线看| 国产高清在线观看AV片| 神马午夜久久久久久| 香蕉久久一區二區不卡無毒影院| 国内精品视频天天在线观看| 香蕉在视频线精品视频| 精品国产午夜在线| 在线观看AV无毒网站| 国产一区二区三区撒尿在线| 午夜老司机福利日韩视频在线高清| 一本久道久久综合网| 夜夜操综合网| 最新午夜男女福利片视频| 久久精品欧美| 四川少扫搡BBW搡BBBB| 亚洲Av日韩Av在线播放| 亚洲欧美一区二区在线观看| 欧美成人午夜影院| 青青青青久久精品国产首| 黄色成人香蕉视频网站| zayou亚洲福利一区| 调教.求饶乖腿打开h| 国产福利午夜九二网免费| 日韓三級免費看| 超碰97人人模人人爽人喝| 午夜免费福利av| 国产狼友精品视频网| 国产男女嘿咻视频在线| 国产成人福利在线观看视频| 成人亚洲欧美在线观看| 亚洲精品国产导航一区二区| 亚洲av永久无码偷拍另类| 千金去SM体验馆被调教| 在线视频精品中文无码| 最近的2019中文字幕7| good电影在线观看三级中文 | 免费AV一区二区三区3ATV| 久久综合老色鬼网站| 无码在线视频免费| 电影天堂免费在线观看| 亚洲精品无码av国模| 亚洲精品成人国产| 日韩特黄精品一在线看| 日韩成人精品视频自拍| 中文又粗又大又硬毛 | 十八禁爽爽爽无遮挡在线观看网站| 手机看片精品国产福利| 国产在线高清无码视频| 国产免费观看久久黄AV片| 国产91黑人在线| 99re66热这里只有精品66| 五月丁香色婷婷蜜桃| 亚洲AAA一级无费看| 久久午夜福利久久网| 五月开心中文版在线观看| 色婷婷精品国产黑人一区二区三区| 91视频欧美青青草| 少妇人妻中文字幕hd| va在线看国产免| 被cao哭高H调教1v1H| 人妻久久系列精品| 国产亚洲欧洲无码激情在线观看| 久久免费视频777| 66j8午夜电影网| av资源久久免费下载| 国产无遮挡又黄又爽在线观看| 在线播放第一页国产自拍手机直播| 蜜臀久久精品国产亚洲av| 国产在线视频一卡| 中文字幕一区在线观看视频| 国产目拍亚洲精品二区婷婷| 国产韩国一区二区三区| av午夜福利精品一区| 亚洲成AV人手机在线观看网站 | 精品国产伦一区二区三区在唱戏| 亚洲欧美精品日韩片| 人妻中出中文字幕資源免費看| 丰腴饱满的极品熟妇| 久久免费福利资源站| 福利午夜伦理影院| 在线播放国产视频99| 一色屋精品无码免费视频| 性高湖久久久久久久久| 免费在线亚洲| l精品国产亚洲区久久99| 欧美日韩在线视频h| 麻豆视频传媒APP | 成人国产欧美日本精品久久麻豆 | a毛片免费全部播放吃| √天堂中文官网8在线| 国产精品AV毛片免费看观看| 日韩一区二区在线视频| 色婷婷国产精品欧美毛片 | 尹人在线视频| 欧美激情自拍偷拍另类| 亚洲成人欧美在线| 张警官撞玻璃9分10秒| 日产午夜精品一区二区播放| 国产一线在线观看| 国产18成人三级在线观看| 在线观看亚洲精品视频| 日韩一区二区三区在线看| 影音先锋+高潮+痉挛| 伊人色婷婷五月综合久久97| 18款禁用安装的漫画软件| 扒开老女人p大荫蒂warmth| 色天堂在线观看视频| 国产—久久香蕉国产线看观看| 免费无码在线aⅴ| 免费观看又色又刺激的视频| 久久久免费丁香五月| 成人性做爰aaa片免费看不忠| 在线视频日本亚洲 | 午夜精品九九九九99蜜桃| 四虎sihu新版影院亞洲精品| av无码av高潮av喷吹免费| 欧美成人xx免费视频| 欧美男人与动牲交zooz | 成人国产一区二区三区精品小说 | 最新全集网电影免费在线看 | 国产精品影音先锋69| aⅴ色窝窝男女爽爽a片| 免费99精品国产一级A大人片| 樱桃视频草莓视频幸福宝| 伊人影院在线播放| 秋霞电影午夜伦免费观看| 中国激情一区二区三区成人| 久久大屁股白浆一区二区| 377p欧洲日本亚洲大胆噜噜| 亚洲熟妇无码AⅤ不卡在线播放| 国产性爱第8页在线观看| 国产无码不卡视频| 免费国产福利一区二区| 日韩欧群交p片内射中文| 久久伊人免费视频| 亚洲欧州国产综合不卡在线免费视频 | 最近最新中文字幕2018| 国内精品自线一区二区2021| 电影天堂免费在线观看| 美女裸体视频在线无卡黄色免费网站| 欧美日韩精选在线观看| 国产ā v中文字幕乱码| 综合欧美在线观看少妇| 欧美亚洲少妇日本| 欧美亚洲自偷自偷图片| 91在线无码精品秘九色APP| 亚洲中文无码日韩A∨精品亚洲免费观看网| 欧美激情在线播放一区二区 | 在线视频日本亚洲| 自拍日韩葡萄影院视频在线播放| 日本中文精品在线观看| 亚洲视频在线观看污污的黄| 婷婷成人久久精品国产| 日产一区二区三区精品视频| 日本AⅤ精品中文字幕在线| 一本久久a久久精品免费不| 在线观看亚洲欧美一区二区三区| 2020国产成人精品视频网站| 国产麻豆精品成人毛片| 国产一级做?爰片久久毛片野外| 国国产精品V欧美精品∨日韩| 成人无码av一区二区三区| 日本一区二区三区作爱视频| 9色丨porny丨人妻|